Registration lapsed No litigation declared Residential / Group Housing project

ISHWAR PRATIK GRAND C AND D WING

By KANAK DEVELOPERS

RG-MH-13576 · RERA P51600026162 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
18 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 95%
11 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

ISHWAR PRATIK GRAND C AND D WING is a Residential / Group Housing project by KANAK DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600026162 on 25 Aug 2020. Possession was promised by 15 Jun 2026 and is now 4 months past that date. The completion date has moved by 9 months from the original filing. 67 of the 78 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameISHWAR PRATIK GRAND C AND D WING
  • TypeResidential / Group Housing
  • Location
    • AGARTAKLI SHIWAR
    • NASHIK
    • 422011
  • Pincode422011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600026162
  • ReraGenie IDRG-MH-13576

Builder

  • NameKANAK DEVELOPERS
  • Entity typePartnership
  • PartnersTARUN SHANKAR SAMNANI, RAHUL RAMCHANDRA RATHI
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredAug 2020First promiseSep 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2020
  • Promised completion15 Jun 2026
  • Revised completionRevised to 15 Jun 2026 (originally 30 Sep 2025)
  • Buildings2 building records
  • Documents filed89 files

Current status

86%67 of 78 units booked
74.0%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ISHWAR PRATIK GRAND C WINGNA161352052
ISHWAR PRATIK GRAND D WINGNA161326026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

ISHWAR PRATIK GRAND C WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
ISHWAR PRATIK GRAND D WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered75
Open Space13
BuildingClosed/CoveredOpen SpaceTotal
ISHWAR PRATIK GRAND C WING61061
ISHWAR PRATIK GRAND D WING141327

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,751 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Metropolitan Region Development Authority
Permissible FSI5896.02
Proposed, not sanctioned5,896 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 10 AND 11 REGIMENTAL PLAZA NASHIK ROAD
Estimated costRs 32.12 cr
Cost incurredRs 23.77 cr
Work done73.99%
BuildingWingEstimatedIncurred
ISHWAR PRATIK GRAND C WINGNARs 32.12 crRs 23.77 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT KUMATH
EngineerMILIND RATHI
Chartered AccountantPRITAM BAGMAR
PartnerRole in project
KANAK DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15112518338Sep 2025 → Jun 2026

Reason as filed by the promoterWe have in warded our application for completion certificate with NMC on 11.09.2025 and it is under process. We are seeking the completion certificate from NMC. Meanwhile we have completed the onsite works and obtained statutory clearances including Lift working letter, Fire completion certificate, Mseb electricity meters installed. Therefore, we kindly request mahaRERA to grant an extension of 9 months in project validity so that we may complete the remaining formalities and hand over full and complete document to our customers. We are currently waiting for approval from NMC. We r mailed alre

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 C Q4 31032026.pdf20 May 2026
Withdrawal Update Form 2File: Form 2 C Q4 31032026.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 CD Q4 31032026.pdf20 May 2026
Withdrawal Update Form 1File: Form1 CD Q3.pdf14 Mar 2026
Withdrawal Update Form 1File: Form1 CD Q3.pdf14 Mar 2026
Withdrawal Update Form 2File: Form2 CD Q3.pdf14 Mar 2026
Withdrawal Update Form 2File: Form2 CD Q3.pdf14 Mar 2026
Withdrawal Update Form 3File: Form3 Dt CD Q3.pdf14 Mar 2026
Withdrawal Update Form 3File: Form3 Dt CD Q3.pdf14 Mar 2026
Form 2A (FY 2024-2025)File: Form 2 A Milind Rathi Dt 31032025.pdf26 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 cd 2425.pdf26 Nov 2025
Form 1File: Form 1 CD 30092025.pdf18 Oct 2025
Form 2File: Form 2 CD 30092025.pdf18 Oct 2025
Form 3File: Form 3 CD 30092025.pdf18 Oct 2025
OthersFile: Form 2A CD 30092025.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Booked Inventory CD.pdf18 Oct 2025
Form 1File: Form 1 cd 300625.pdf18 Sep 2025
Form 2File: Form 2 cd 300625.pdf18 Sep 2025
Form 3File: Form 3 cd 300625.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Booked Inventory cd.pdf18 Sep 2025
OthersFile: Form 2A cd 300625.pdf18 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Q4cd31032025.pdf2 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3cdQ4.pdf2 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Q42425cd.pdf2 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2ACD31032025.pdf2 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-1-4-2023.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-31-12-2022 (1).pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-30-9-2022 (2).pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-31-12-2022 (1).pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 3-27-9-2022.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 3-15-1-2024.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-30-9-2022.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-31-12-2022.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2425 cd.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 2425 cd.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 3 Q2 2425.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 3 Q1 2425 CD WING.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 phase 3 Q2 CD WING 2425.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 3 Q3 CD WING 2425.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 2425 cd.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2324 cd.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2425 cd.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 Q3 2425 CD WING.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 Q2 2425 CD WING.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 Q1 2425 CD WING.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Phase -3 Q3 cd_compressed.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3q22324cd_compressed.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3q12324cd.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5pratikgrandcd.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - C And D Wing.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA_Rahul Rathi_Phase II - C-D_ 31032023.pdf27 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3.pdf27 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICAT_11zon.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE 3.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2022.pdf15 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 3.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: kanak C and D.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Kanak Developers-.pdf27 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA_Rahul Rathi_Commercial.pdf26 Jul 2022
Proforma of Allotment letterFile: Agreement to Sale Format 1.pdf25 Jan 2022
Building plan approvalFile: Approved Plan -1.pdf19 Aug 2020
Building plan approvalFile: Approved Plan -2.pdf19 Aug 2020
Building plan approvalFile: 3.pdf19 Aug 2020
Building plan approvalFile: Approved Plan -4.pdf19 Aug 2020
Building plan approvalFile: Approved Plan -5.pdf19 Aug 2020
Building plan approvalFile: Approved Plan -6.pdf19 Aug 2020
Building plan approvalFile: Approved Plan -7.pdf19 Aug 2020
Building plan approvalFile: Approved Plan-8.pdf19 Aug 2020
Layout approvalFile: Copy of Layout.pdf19 Aug 2020
Copy of Layout Approval (in case of layout)File: Copy of Layout.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan -1.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan -2.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan -4.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan -5.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan -6.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan -7.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan-8.pdf19 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf19 Aug 2020

How this compares with Nashik

86%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 9 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ISHWAR PRATIK GRAND C AND D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmISHWAR PRATIK GRAND C ANCompleted 48Lapsed / revoked 20Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 71 registered projects within 2 km.

Builder: KANAK DEVELOPERS

KANAK DEVELOPERS has 4 registrations on MahaRERA, including ISHWAR PRATIK GRAND OJAS and ISHWAR PRATIK GRAND A AND B WING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that ISHWAR PRATIK GRAND C AND D WING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ISHWAR PRATIK GRAND C AND D WING is delayed beyond 15 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ISHWAR PRATIK GRAND C AND D WING?

The registered promoter entity is KANAK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ISHWAR PRATIK GRAND C AND D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ISHWAR PRATIK GRAND C AND D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ISHWAR PRATIK GRAND C AND D WING?

The professionals named in the filing: Architect: SUMIT KUMATH; Engineer: MILIND RATHI; Chartered Accountant: PRITAM BAGMAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ISHWAR PRATIK GRAND C AND D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ISHWAR PRATIK GRAND C AND D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ISHWAR PRATIK GRAND C AND D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.