ISHWAR OM TULSI

By ISHWAR REALITY

RG-MH-05151 · RERA P51700050333 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 30 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
19 of 31Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

ISHWAR OM TULSI is a Others project by ISHWAR REALITY in Thane, Maharashtra, registered with MahaRERA as P51700050333 on 5 Apr 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 30 months from the original filing. 12 of the 31 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameISHWAR OM TULSI
  • TypeOthers
  • Location
    • VADVALI
    • AMBARNATH
    • Ambarnath(M Cl)
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050333
  • ReraGenie IDRG-MH-05151

Builder

  • NameISHWAR REALITY
  • Entity typePartnership
  • PartnerJAGDISH RAMA BANJAN
  • Other registrations8 more →
  • Completed5 of 9
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

4 months past promisethis monthRegisteredApr 2023First promiseDec 2023Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Apr 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed68 files

Current status

39%12 of 31 units booked
100.0%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ISHWAR OM TULSINA8825631

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

ISHWAR OM TULSI: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered1
Open Space9

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area421 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
OM TULSI CO-OP HOUSING SOCIETY LTDAmbarnath(M Cl)Thane

Approvals and building plan

Sanctioning authorityAMBERNATH NAGAR PARISHAD
Permissible FSI1158.86
Proposed, not sanctioned1,159 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANVELKAR PLAZA , STATION ROAD, AMBARNATH EAST
Estimated costRs 3.60 cr
Cost incurredRs 3.60 cr
Work done100.0%
BuildingWingEstimatedIncurred
ISHWAR OM TULSINARs 3.20 crRs 3.20 cr
-NARs 40.00 lakhRs 40.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD KAMBLE
EngineerPRAMOD KAMBLE
Chartered AccountantCHANCHLANI & ASSOCIATES
PartnerRole in project
ISHWAR REALITY-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018239Dec 2023 → Dec 2024

Reason as filed by the promoterThe project is under construction & we have completed more than 85% work on the project. Despite our concerted efforts, we have encountered unforeseen challenges, namely a scarcity of essential construction materials and a shortage of skilled labour. there is a slight delay in finishing activities of the project. Under the above circumstance, we humbly request your honour to kindly grant extension of Project. The revised proposed date of completion as 30/12/2024 for our Project - “ISHWAR OM TULSI” bearing Registration No. P51700050333.

EXT51700027150Dec 2023 → Jun 2025

Reason as filed by the promoterWe are writing to request an extension for the completion date of our project “Ishwar Om Tulsi”. The construction of the project is over 95% complete. We have also applied for the Occupancy Certificate with the Ambernath Municipal Council, which is currently pending approval. Under the above circumstances, we humbly request your kind consideration to grant an extension for the project completion date. The revised proposed date of completion as 30/06/2025 for our Project - “ISHWAR OM TULSI” bearing Registration No. P51700050333

EA26072502209Dec 2023 → Jun 2026

Reason as filed by the promoterWe are writing to request an extension for the completion date of our project “Ishwar Om Tulsi”. The construction of the project is over 95% complete. We have also applied for the Occupancy Certificate with the Ambernath Municipal Council, which is currently pending approval. Under the above circumstances, we humbly request your kind consideration to grant an extension for the project completion date. The revised proposed date of completion as 30/06/2026 for our Project - “ISHWAR OM TULSI” bearing Registration No. P51700050333

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: arc om tulsi.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 Om Tulsi Q4.pdf30 Jun 2026
Withdrawal Update Form 2File: OM tulsi- engineer Certificate Q3.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2om tulsi Q4.pdf30 Jun 2026
Withdrawal Update Form 3File: form 3 300925 291125.pdf30 Jun 2026
Withdrawal Update Form 3File: form 3 300925 291125.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: form 3 300925 291125.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A 2024 25.pdf28 Nov 2025
Withdrawal Update Form 1File: Form 1-Om Tulsi.pdf7 Oct 2025
Withdrawal Update Form 2File: Form 2-Om Tulsi.pdf7 Oct 2025
Withdrawal Update Form 3File: FORM 3 300625 OMT.pdf7 Oct 2025
OthersFile: Ishwar reality (om tulsi) Signed.pdf6 Oct 2025
Form 1File: Form 1 Om Tulsi.pdf6 Oct 2025
Form 2File: engineers certificate om tulsi.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Om Tulsi (1).pdf6 Oct 2025
Form 3File: FORM 3 300625 OMT.pdf6 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Om Tulsi.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate om tulsi.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold Om Tulsi (1).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure 08022025.pdf8 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ishwar om tulsi form 1.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ishwar om tulsi form 2.pdf5 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ishwar om tulsi form 1.pdf23 Jan 2025
Declaration in FORM BFile: Form B Notary.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate300924.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 300924.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: signed Form 5 Om tulsi.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OM TULSI ARCHITECT.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Om Tulsi engineer Certificate.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ishwar Om Tulsi Architect's Certificate.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Om Tulsi Engineer's Certificate.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc om tulsi.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate om tulsi.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 300623.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 300923.pdf16 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Dec.pdf16 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Om Tulsi Q2.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Om Tulsi Q2.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG OM TULSI.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archeitect Certificate.pdf22 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SOLD UNSOLD.pdf22 Sep 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf22 Sep 2023
CERSAI detailsFile: CERSAI.pdf1 Apr 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE1.pdf27 Mar 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE1.pdf27 Mar 2023
Deviation Report with respect to model copy of AgreementFile: DEVATION MODEL COPY OF AGREEMENT.pdf27 Mar 2023
Copy of the legal title reportFile: Legal Title Report_.pdf9 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Pradeep Chavan annexture.pdf9 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: jagdish banjan Annexture.pdf9 Mar 2023
Proforma of Agreement for saleFile: Agreement Final Draft_Om Tulsi.pdf9 Mar 2023
Layout approvalFile: AMC APPROVED PLAN.pdf8 Mar 2023
Building plan approvalFile: AMC APPROVED PLAN.pdf8 Mar 2023
PAN CardFile: pan card (1).pdf8 Mar 2023
Details of encumbrances concerned to FinanceFile: No Finance.pdf8 Mar 2023
Details of encumbrances concerned to LegalFile: No Finance.pdf8 Mar 2023
Copy of Layout Approval (in case of layout)File: AMC APPROVED PLAN.pdf8 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: AMC APPROVED PLAN.pdf8 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf8 Mar 2023
Declaration about Commencement CertificateFile: Decleration CC Cetificate.pdf8 Mar 2023
Declaration in FORM BFile: Forn B Builder.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf8 Mar 2023
Proforma of Allotment letterFile: Model copy Allotment.pdf8 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Accout.pdf8 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviations Allotment.pdf8 Mar 2023

How this compares with Thane

39%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ISHWAR OM TULSI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBARNATH7,600+ in Thane

2 kmISHWAR OM TULSICompleted 109Lapsed / revoked 38Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 229 registered projects within 2 km.

Builder: ISHWAR REALITY

ISHWAR REALITY has 9 registrations on MahaRERA, including ISHWAR BLISS and ISHWAR SHUBHLAXMI. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that ISHWAR OM TULSI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ISHWAR OM TULSI is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ISHWAR OM TULSI?

The registered promoter entity is ISHWAR REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ISHWAR OM TULSI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ISHWAR OM TULSI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ISHWAR OM TULSI?

The professionals named in the filing: Architect: PRAMOD KAMBLE; Engineer: PRAMOD KAMBLE; Chartered Accountant: CHANCHLANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ISHWAR OM TULSI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ISHWAR OM TULSI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ISHWAR OM TULSI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.