ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / VISHWAJEET MYSPACE

Registered No litigation declared Others project

VISHWAJEET MYSPACE

By GULABRAO BABURAO KARANJULE PATIL

RG-MH-31004 · RERA P51700079338 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
370 of 390Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

VISHWAJEET MYSPACE is a Others project by GULABRAO BABURAO KARANJULE PATIL in Thane, Maharashtra, registered with MahaRERA as P51700079338 on 28 Feb 2025. Possession is promised by 31 Mar 2030. 20 of the 390 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameVISHWAJEET MYSPACE
  • TypeOthers
  • Location
    • PALE
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700079338
  • ReraGenie IDRG-MH-31004

Builder

  • NameGULABRAO BABURAO KARANJULE PATIL
  • Entity typeIndividual
  • GSTIN27ABIPK4810F1ZV
  • Other registrations8 more →
  • Completed4 of 9
  • Declared earlier projects8 →

Key dates

this monthRegisteredFeb 2025PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Feb 2025
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

5%20 of 390 units booked
27.0%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JUPITERNA171618113194
VENUSNA171618511196

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

JUPITER35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VENUS32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed564

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots564
Closed/Covered131
Open Space433
BuildingClosed/CoveredOpen SpaceTotal
JUPITER66217283
VENUS65216281

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 May 2025

Approvals and building plan

Sanctioning authorityChief Officer, Ambernath Municipal Council,
Permissible FSI19735.8
Proposed, not sanctioned19,736 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3039GROUND FLOOR SWANAND SHOPPING COMPLEX B CABIN ROADSHIVAJI CHOWK AMBARNATH EAST) PIN 421501
Estimated costRs 71.14 cr
Cost incurredRs 19.21 cr
Work done27.0%
BuildingWingEstimatedIncurred
JUPITERNARs 32.01 crRs 9.60 cr
VENUSNARs 32.01 crRs 9.60 cr
-NARs 7.11 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURAJ ANDHARE AND ASSOCIATES
EngineerM NANDWANI
EngineerSHOBHNATH RAO
Chartered AccountantMAYUR K JAIN AND CO
Chartered AccountantK M R B AND ASSOCIATES LLP
Chartered AccountantVijesh I. Jaisinghani
PartnerRole in project
GULABRAO BABURAO KARANJULE PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1-V MYSPACE-31-03-26.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM-1-V MYSPACE-31-03-26.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2-V MYSPACE-31-03-2026.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2-V MYSPACE-31-03-2026.pdf30 Apr 2026
Withdrawal Update Form 3File: Final Form 3 Vishwajeet Myspace Q4.pdf30 Apr 2026
Withdrawal Update Form 3File: Final Form 3 Vishwajeet Myspace Q4.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM-1-V MYSPACE-31-03-26.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM 1 V MYSPACE 31 12 25.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM 1 V MYSPACE 31 12 25.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2-V MYSPACE-31-03-2026.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2 V MYSPACE 31 12 2025.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2 V MYSPACE 31 12 2025.pdf29 Apr 2026
Withdrawal Update Form 3File: form-3 vishwajeet myspace 31-03-2025-Revised.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 V Myspace 31-12-2025.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 V Myspace 31-12-2025.pdf29 Apr 2026
Layout approvalFile: REVISED PLAN.pdf1 Apr 2026
Building plan approvalFile: REVISED PLAN.pdf1 Apr 2026
Withdrawal Update Form 1File: FORM-1-V MYSPACE-30-09-25.pdf24 Dec 2025
Withdrawal Update Form 2File: V MYSPACE Form 2 30 09 2025.pdf24 Dec 2025
Withdrawal Update Form 3File: Form -3-V MYSPACE-30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: FORM-1-V-MYSPACE-30-06-25.pdf13 Dec 2025
Withdrawal Update Form 2File: FORM 2 V MYSPACE 30 06 25.pdf13 Dec 2025
Withdrawal Update Form 3File: Form 3 V Myspace Revised 30 06 2025 Signed compressed.pdf13 Dec 2025
Form 5 (FY 2024-2025)File: V MYSPACE-FORM-5-FY-24-25.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: FORM-2A-V-MYSPACE Signed.pdf31 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V MYSPACE -31-03-25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V MYSPACE-31-03-25.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-V MYSPACE-31-03-25.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: V MYSPACE-UNSOLD-31-03-25.pdf13 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-V MYSPACE-31-03-25.pdf13 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Verification of CC Pale.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V MYSPACE (1).pdf12 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC.pdf12 Feb 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf25 Jan 2025
Declaration about Commencement CertificateFile: FORMAT D.pdf25 Jan 2025
Proforma of Agreement for saleFile: Model RERA Agreement Revised.pdf25 Jan 2025
Declaration in FORM BFile: FORM-B-V MYSPACE.pdf9 Jan 2025
Other - LegalFile: पाले_40_8_अ_Satbara (1).pdf9 Jan 2025
Other - LegalFile: पाले_30_1_क_Satbara (2).pdf9 Jan 2025
Other - LegalFile: Shree Gunvant Kharodiya-30-1-C.pdf9 Jan 2025
Other - LegalFile: Uttam Ramesh Jain Sur No 40 Hissa No 8A.pdf9 Jan 2025
Layout approvalFile: Plan 1.pdf8 Jan 2025
Building plan approvalFile: Plan 2.pdf8 Jan 2025
Building plan approvalFile: Plan 3.pdf8 Jan 2025
Building plan approvalFile: Plan 4.pdf8 Jan 2025
Building plan approvalFile: Plan 5_compressed.pdf8 Jan 2025
PAN CardFile: GBK- PAN.pdf8 Jan 2025
Copy of the legal title reportFile: Rera Title Report Myspace_compressed.pdf8 Jan 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf8 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 pdf.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 5_compressed.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf8 Jan 2025
CERSAI detailsFile: No Cersai declaration.pdf8 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A.pdf8 Jan 2025
Deviation Report with respect to Allotment letterFile: No deviation Allotment Letter.pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf8 Jan 2025
Other - TechnicalFile: Undertaking.pdf8 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement For Sale.pdf8 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A.pdf8 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORM-B.pdf8 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured.pdf8 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VISHWAJEET EDGEMORIVALI PADA AMBERNATH118CompletedApr 2017Apr 2017

How this compares with Thane

5%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWAJEET MYSPACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALE7,600+ in Thane

Builder: GULABRAO BABURAO KARANJULE PATIL

GULABRAO BABURAO KARANJULE PATIL has 9 registrations on MahaRERA, including VISHWAJEET PINK CITY and VISHWAJEET EMPIRE NX. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHWAJEET MYSPACE is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWAJEET MYSPACE?

The registered promoter entity is GULABRAO BABURAO KARANJULE PATIL, an individual as per the filing. Its GSTIN 27ABIPK4810F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWAJEET MYSPACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWAJEET MYSPACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWAJEET MYSPACE?

The professionals named in the filing: Architect: SURAJ ANDHARE AND ASSOCIATES; Engineer: M NANDWANI; Engineer: SHOBHNATH RAO; Chartered Accountant: MAYUR K JAIN AND CO; Chartered Accountant: K M R B AND ASSOCIATES LLP; Chartered Accountant: Vijesh I. Jaisinghani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWAJEET MYSPACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWAJEET MYSPACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWAJEET MYSPACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.