Home / Browse projects / Mumbai Suburban, Maharashtra / Integrated Kamal

Completed No litigation declared Residential / Group Housing project

Integrated Kamal

By Integrated Spaces Limited

RG-MH-08332 · RERA P51800002437 · Last updated on MahaRERA portal: 18 Jan 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 99%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Integrated Kamal is a Residential / Group Housing project by Integrated Spaces Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002437 on 1 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameIntegrated Kamal
  • TypeResidential / Group Housing
  • Location
    • Goregaon Mulund Link Road
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002437
  • ReraGenie IDRG-MH-08332

Builder

  • NameIntegrated Spaces Limited
  • Entity typeCompany
  • Managing DirectorNishit Savla
  • ChairpersonKanti Savla
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INTEGRATED KAMALNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

INTEGRATED KAMAL: 99% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 18 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed226

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots226
Closed/Covered203
Open Space23

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,338 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11810.0
Proposed, not sanctioned11,810 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKarma Sankalp Building, Road No 7, Rajawadi Opp Somaiya College, Mumbai- 400077

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri Yomesh N. Rao
EngineerTushar Tejam
EngineerDayanand Salunke
Chartered AccountantVijay Kumar Jain
Chartered AccountantVarun A. Tiwari
PartnerRole in project
Integrated Spaces Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000756Dec 2018 → Dec 2019

Reason as filed by the promoterAlthough we expect to apply for OC before Dec end, we are unsure of the time frame for obtaining OC due to implementation of new DP 2034. Besides, due to adverse market conditions project is delayed by a few months, we intend to keep buffer time for delivery of the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Oct 2019

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: I Kamal Society Registration Certificate.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf18 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Kamal.pdf18 Mar 2020
Form 2AFile: Form 2A Kamal.pdf18 Mar 2020
Certificates of CA (Form 3)File: Form 3 Kamal.pdf18 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kamal.pdf24 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Kamal.pdf24 Dec 2019
Form 2AFile: Form 2A Kamal.pdf24 Dec 2019
Certificates of CA (Form 3)File: Form 3 I Kamal.pdf24 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Kamal.pdf6 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kamal.pdf23 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kamal.pdf23 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Kamal.pdf23 Oct 2019
Form 2AFile: Form 2A Kamal.pdf23 Oct 2019
Certificates of CA (Form 3)File: Form 3 Kamal .pdf23 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full oc letter_210519.pdf23 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kamal.pdf22 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Kamal.pdf22 Jul 2019
Form 2AFile: Form 2A Kamal.pdf22 Jul 2019
Certificates of CA (Form 3)File: Form 3 Kamal.pdf22 Jul 2019
Proforma of Allotment letterFile: I Kamal Flat Sale Agrm v27 Full N Final.pdf22 Jul 2019
OtherFile: Full oc letter_210519.pdf22 Jul 2019
OtherFile: 01_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 02_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 03_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 04_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 05_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 06_full oc drawing_210519_resize.pdf22 Jul 2019
OtherFile: 07_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 08_full oc drawing_210519.pdf22 Jul 2019
OtherFile: 09_full oc drawing_210519.pdf22 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kamal.pdf7 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Kamal.pdf7 Mar 2019
Form 2AFile: Form 2A Kamal.pdf7 Mar 2019
Certificates of CA (Form 3)File: Form 3 Kamal.pdf7 Mar 2019
Certificates of CA (Form 5)File: FORM 5 Kamal.pdf10 Dec 2018
Certificates of CA (Form 3)File: Form 3 I Kamal.pdf6 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate I Kamal.pdf2 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC I Kamal.pdf2 Nov 2018
Building plan approvalFile: Amended_Plan_Letter.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_1.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_2.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_3.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_4.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_5.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_6.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_7.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_8.pdf22 Oct 2018
Building plan approvalFile: Approved_Plan_9.pdf22 Oct 2018
Building Plan Approval (IOD)File: Amended_Plan_Letter.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_1.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_2.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_3.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_4.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_5.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_6.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_7.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_8.pdf22 Oct 2018
Building Plan Approval (IOD)File: Approved_Plan_9.pdf22 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement_Certificate_21122015_New.pdf22 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate I Kamal.pdf4 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC of I Kamal.pdf4 Sep 2018
Certificates of CA (Form 3)File: Form 3 Kamal.pdf4 Sep 2018
Certificates of CA (Form 3)File: Form 3 I Kamal new.pdf30 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate I Kamal.pdf27 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC Kamal.pdf27 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Kamal.pdf9 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate I Kamal.pdf9 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate I Kamal.pdf9 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC Kamal.pdf9 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC_Kamal.pdf9 Mar 2018
Certificates of CA (Form 3)File: Form 3 Kamal.pdf9 Mar 2018
Certificates of CA (Form 3)File: Form3 Kamal.pdf9 Mar 2018
Details of encumbrancesFile: Details of encumbrances 13_10_2017.pdf13 Oct 2017
Declaration in FORM BFile: Affidavit cum declaration kamal.pdf30 Jul 2017
Certificates of CA (Form 3)File: Form 3_Kamal Final.pdf29 Jul 2017
Proforma of Allotment letterFile: Flat Sale Agreement I Kamal.pdf29 Jul 2017
Layout approvalFile: Approved Plans 1.pdf27 Jul 2017
Details of encumbrancesFile: Self Declaration Kamal.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved Plans 1.pdf27 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Integrated IRS 1Ulve Node108CompletedDec 2016Late, Jul 2017
Integrated BhoomiGhatkopar West96CompletedDec 2016Dec 2016
Shivnagar Karma BhoomjGhatkopar West92CompletedJul 2015Jul 2015
Integrated KarmaGhatkopar East40CompletedDec 2012Nov 2012
Pranay KiranGhatkopar West76CompletedMar 2012Feb 2012

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Integrated Kamal on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmIntegrated KamalCompleted 119Lapsed / revoked 96Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 371 registered projects within 2 km.

Builder: Integrated Spaces Limited

Integrated Spaces Limited has 6 registrations on MahaRERA, including Integrated Kamal and Integrated Ahana. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Integrated Kamal is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Integrated Kamal?

The registered promoter entity is Integrated Spaces Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Integrated Kamal?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Integrated Kamal?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Integrated Kamal?

The professionals named in the filing: Architect: Shri Yomesh N. Rao; Engineer: Tushar Tejam; Engineer: Dayanand Salunke; Chartered Accountant: Vijay Kumar Jain; Chartered Accountant: Varun A. Tiwari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Integrated Kamal?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Integrated Kamal. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Integrated Kamal to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.