INSIGNIA
By ULTRA SPACE DEVELOPERS PRIVATE LIMITED
RG-MH-10308 · RERA P51800002313 · Last updated on MahaRERA portal: 5 Mar 2022
Source: official MahaRERA filing
Red flags
- 64 complaints at MahaRERA
- Completion date moved by 26 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INSIGNIA is a Others project by ULTRA SPACE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002313 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 26 months from the original filing. 64 complaints are on record with the regulator.
At a glance
Project
- NameINSIGNIA
- TypeOthers
- Location
- C.S.T. Road
- Kalina
- Andheri
- Mumbai Suburban
- 400051
- Pincode400051
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002313
- ReraGenie IDRG-MH-10308
Builder
- NameULTRA SPACE DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Jul 2017
- Promised completion30 Jun 2022
- Revised completionRevised to 30 Jun 2022 (originally 30 Apr 2020)
- Buildings6 building records
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 20 | 0 | 0 | 0 | 0 |
| WING B | NA | 20 | 0 | 0 | 0 | 0 |
| WING C | NA | 20 | 0 | 0 | 0 | 0 |
| WING D | NA | 20 | 0 | 0 | 0 | 0 |
| WING E | NA | 21 | 0 | 0 | 0 | 0 |
| WING F | NA | 21 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 5 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
48 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is External plumbing and external plaster, at 98%.
WING A96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
WING B96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
WING C96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
WING D96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
WING E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
WING F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 5 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 98% |
| Solid Waste Management And Disposal | Yes | 98% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 95% |
| Open Parking | Yes | 98% |
Parking filed619
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 89 | 27 | 116 |
| WING B | 99 | 22 | 121 |
| WING C | 91 | 0 | 91 |
| WING D | 33 | 18 | 51 |
| WING E | 70 | 10 | 80 |
| WING F | 144 | 16 | 160 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GVS Architects & Associates |
| Partner | Role in project |
|---|---|
| ULTRA SPACE DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Project namely, ‘Insignia’ is at the final stage of completion. The RCC work of buildings in the said project is complete. Annexed hereto as Annexure ‘A’ (Collectively) are few current photographs of the said project in this regard. The said project is approximately 95% complete. Annexed hereto as Annexure ‘B’ is a copy of the letter dated 26.12.2019 of GVS Architects & Associates, certifying the status of extent of completion of the said project. The tentative time required for completion of the project is about 6 months. Annexed hereto as Annexure ‘C’ is copy of a letter dated 27.12.2019
Reason as filed by the promoterThe project namely “Insignia” on plot bearing/ CTS/ Survey/ Final Plot No. CTS No. 5530/A at Andheri, Andheri Mumbai Suburban, 400 051 (hereinafter referred to as the “said Project”) is at final stage of completion. RCC work of the building / wings comprised in the said Project is fully complete. Interiors of the building / wings comprised in the said Project are being completed. Occupation Certificate (OC) of the building / wings comprised in the said Project shall be applied for within 90 (ninety) days and upon grant of OC, possession shall be offered to the flat purchasers of the building /
Reason as filed by the promoterThe project namely “Insignia” on plot bearing/ CTS/ Survey/ Final Plot No. CTS No. 5530/A at Andheri, Andheri Mumbai Suburban, 400 051 (hereinafter referred to as the “said Project”) is at final stage of completion. RCC work of the building / wings comprised in the said Project is fully complete. Interiors of the building / wings comprised in the said Project are being completed. Occupation Certificate (OC) of the building / wings comprised in the said Project shall be applied for within 90 (ninety) days and upon grant of OC, possession shall be offered to the flat purchasers of the building /
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 97/SW/2013/2013 | Additional Chief Metropolitan Magistrate Court Bandra | Hearing on discharge application |
| 117/2017 | RERA | HEARING |
Complaints filed with MahaRERA64
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000117 | Ashwin Shetty | Ultra Space Developers Private Limited | 24/08/2017 |
| CC006000000057140 | Mr. Sushir Lohia | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057141 | Sunil Agarwal | Ultra Space Developers Pvt. Ltd. | 08/12/2018 |
| CC006000000057142 | Ravi Duvvuru | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057151 | Himanshu Vyapak | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057191 | Niraj Piyush Shah | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057193 | Ashish Pitale | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057194 | Parag Wagh | Ulra Space Developers Pvt. Ltd | 08/12/2018 |
| CC006000000057196 | Pushpraj Samy Nadar | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057210 | Sanjay Sethi | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057224 | Aashwin Dugal | Ultra Space Developers Pvt Ltd | 08/12/2018 |
| CC006000000057228 | Jaywant Durge | Ultra Space Developers Pvt. Ltd. | 08/12/2018 |
| CC006000000057344 | Raghav Kapoor | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057348 | Saurabh Bhat | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057355 | Shantiswarup Panda | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057388 | Ashish Aggarwal | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057466 | Sushma Kaushik | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057470 | Srinath Srinivasan | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057471 | Anshuman Asthana | Ultra Space Developers Pvt Ltd | 28/12/2018 |
| CC006000000057527 | Bamasish Paul | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057528 | Balasubramanian Venkatesan | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057529 | Shyamal Karmakar | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057530 | Malcolm Mistry | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057531 | Varadarajan Subbaraman | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057532 | Rajinder Kumar Chugh | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057533 | Nandina Biswas Ramchandran | Ultra Space Developers Pvt Ltd | 03/01/2019 |
| CC006000000057699 | Sonali Naresh Goel | Ultra Space Developers Pvt Ltd | 19/01/2019 |
| CC006000000057712 | Indradeep Khan | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057715 | Ankush V Pitale | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057718 | Sangya Mishr | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057731 | Nisha Rajesh | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057732 | Neelabh Sanyal | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057737 | Farman Ellahi Siddiqui | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057742 | Sanjeev Mohta | Ultra Space Developers Private Limited | 19/01/2019 |
| CC006000000057743 | Sanjeev Mohta | Ultra Space Developers | 19/01/2019 |
| CC006000000057746 | Chetan Jain | Ultra Space Developers Pvt Ltd | 19/01/2019 |
| CC006000000058038 | Rahul Jain | Ultra Space Developers Pvt Ltd | 12/02/2019 |
| CC006000000058041 | Ashish Kedia | Ultra Space Developers Pvt Ltd | 12/02/2019 |
| CC006000000058042 | Anupam Goenka | Ultra Space Developers | 12/02/2019 |
| CC006000000058047 | Mahendra Singh Mehta | Ultra Space Developers | 12/02/2019 |
| CC006000000058053 | Pankaj Vaishnav | Ultra Space Developers | 12/02/2019 |
| CC006000000058063 | Sanjay Singh | Ultra Space Developers Pvt Ltd | 12/02/2019 |
| CC006000000078284 | Gaurav Mahajan | Ultra Space Developers | 28/02/2019 |
| CC006000000078298 | Subroto Som | Ultra Space Developers | 28/02/2019 |
| CC006000000078471 | Vineet Sachdeva | Ultra Space Developers Pvt Ltd | 14/03/2019 |
| CC006000000078544 | Navin Sambtani | Ultra Space Developers | 18/03/2019 |
| CC006000000078781 | Devang Ramesh Parekh | Ultra Space Developers Pvt Ltd | 27/04/2019 |
| CC006000000079054 | Suresh Bajpai | Ultra Space Developers Pvt Ltd | 27/04/2019 |
| CC006000000079056 | Puneet Singhvi | Ultra Space Developers Pvt Ltd | 27/04/2019 |
| CC006000000079057 | Ajay Kanwal | Ultra Space Developers Pvt Ltd | 27/04/2019 |
| CC006000000079058 | Ashish Vaidya | Ultra Space Developers Pvt Ltd | 27/04/2019 |
| CC006000000079059 | ANIL KOTHURI | Ultra Space Developers Pvt Ltd | 27/04/2019 |
| CC006000000079167 | Aishwarya Vishal Agarwal | Ultra Space Developers Pvt Ltd | 06/05/2019 |
| CC006000000079458 | Ravi Singhvi | Ultra Space Developers Pvt Ltd | 25/05/2019 |
| CC006000000079460 | Bina DeGamia | Ultra Space Developers Pvt Ltd | 25/05/2019 |
| CC006000000089718 | Leena Ajay Dasani | Ultra Space Developers Pvt Ltd | 12/06/2019 |
| CC006000000089720 | Ashok Kalyanpur | Ultra Space Developers Pvt Ltd | 12/06/2019 |
| CC006000000089721 | Vikram Uttamsingh | Ultra Space Developers Pvt Ltd | 12/06/2019 |
| CC006000000089844 | Rajeev P. Pawar | Ultra Space Developers | 25/06/2019 |
| CC006000000089845 | Shrinath Ramanujan Iyengar | Ultra Space Developers | 25/06/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Mar 2022
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2284122_OC_signed.pdf | 5 Mar 2022 |
| Certificates of CA (Form 5)File: Form 5_Insignia.pdf | 17 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Letter from GVS to Sub-Engineer (CC REVALIDATION).pdf | 12 Nov 2018 |
| Details of encumbrancesFile: Details of Encumbrance.pdf | 12 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 9 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect's Certificate - Insignia.pdf | 26 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer's Certificate - Insignia.pdf | 26 Oct 2017 |
| Certificates of CA (Form 3)File: Form 3 - CA Certificate - Insignia.pdf | 26 Oct 2017 |
| Proforma of Allotment letterFile: Proforma of the Allotment Letter and Agreement for Sale - Insignia.pdf | 12 Sep 2017 |
| Building plan approvalFile: Upper ground floor plan WING A to F.PDF | 27 Jul 2017 |
| Details of encumbrancesFile: TC - Insignia.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: Right of Way.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Upper ground floor plan WING A to F.PDF | 27 Jul 2017 |
| Declaration in FORM BFile: Declaration Form 'B' - Insignia.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of Allotment Letter and Agreement for Sale.pdf | 27 Jul 2017 |
| Layout approvalFile: Upper ground floor plan WING A to F.PDF | 26 Jul 2017 |
| Building plan approvalFile: WING A line area Diagram.PDF | 26 Jul 2017 |
| Building plan approvalFile: WING B line area Diagram.pdf | 26 Jul 2017 |
| Building plan approvalFile: WING C line area Diagram.PDF | 26 Jul 2017 |
| Building plan approvalFile: WING D line area Diagram.pdf | 26 Jul 2017 |
| Building plan approvalFile: WING E line area Diagram.pdf | 26 Jul 2017 |
| Building plan approvalFile: WING F line area Diagram.pdf | 26 Jul 2017 |
| Building plan approvalFile: WING A 7th floor REFUGE AREA line area Diagram.pdf | 26 Jul 2017 |
| Building plan approvalFile: 13th floor plan WING A, B, C and D.pdf | 26 Jul 2017 |
| Building plan approvalFile: 13th floor plan WING E and F.pdf | 26 Jul 2017 |
| Building plan approvalFile: Lower ground floor plan WING A to F.PDF | 26 Jul 2017 |
| Building plan approvalFile: Section A,B,C,D of WING A to D.pdf | 26 Jul 2017 |
| Building plan approvalFile: Section B and C of wing E and F.pdf | 26 Jul 2017 |
| Building plan approvalFile: Terrace floor plan WING A to D.PDF | 26 Jul 2017 |
| Building plan approvalFile: Typical floor plan 2nd, 4th, 6th, 8th, 10th and 12th WING A, B, C and D.pdf | 26 Jul 2017 |
| Building plan approvalFile: IOD Letter 17th April 2017.pdf | 26 Jul 2017 |
| Building plan approvalFile: 1st basement floor plan WING A to F.PDF | 26 Jul 2017 |
| Building plan approvalFile: 1st floor Podium level floor plan.pdf | 26 Jul 2017 |
| Building plan approvalFile: 2nd basement floor plan WING A to F.PDF | 26 Jul 2017 |
| Building plan approvalFile: 3rd basement floor plan WING A to F.PDF | 26 Jul 2017 |
| Building plan approvalFile: 7th floor REFUGE floor plan WING A, B, C and D.pdf | 26 Jul 2017 |
| Building plan approvalFile: Typical floor plan 3rd, 5th, 9th and 11th WING A, B, C and D.pdf | 26 Jul 2017 |
| Building plan approvalFile: Typical floors plan 2nd to 6th and 8th to 12th floor WING E and F.pdf | 26 Jul 2017 |
| PAN CardFile: PAN - ULTRA SPACE DEVELOPERS PRIVATE LIMITED.pdf | 26 Jul 2017 |
| Copy of the legal title reportFile: TC - Insignia.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Upper ground floor plan WING A to F.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: IOD Letter 17th April 2017.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 1st basement floor plan WING A to F.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 1st floor Podium level floor plan.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 2nd basement floor plan WING A to F.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 3rd basement floor plan WING A to F.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 7th floor REFUGE floor plan WING A, B, C and D.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 13th floor plan WING A, B, C and D.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: 13th floor plan WING E and F.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Lower ground floor plan WING A to F.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Section A,B,C,D of WING A to D.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Section B and C of wing E and F.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Terrace floor plan WING A to D.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Typical floor plan 2nd, 4th, 6th, 8th, 10th and 12th WING A, B, C and D.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Typical floor plan 3rd, 5th, 9th and 11th WING A, B, C and D.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Typical floors plan 2nd to 6th and 8th to 12th floor WING E and F.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING A 7th floor REFUGE AREA line area Diagram.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING A line area Diagram.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING B line area Diagram.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING C line area Diagram.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING D line area Diagram.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING E line area Diagram.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: WING F line area Diagram.pdf | 26 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect (Form 1).pdf | 26 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer (Form 2).pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate Insignia.pdf | 26 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
Keep INSIGNIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalina6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 217 registered projects within 2 km.
12 PEGASUS
Jayant Enterprises S N Project
Kalpataru Magnus
Kalpataru Properties Pvt. Ltd.
Plotted Development Scheme at Sindhudurhnagari
MAHARASHTRA HOUSING AND AREA DEVELOPMENT A
SAJAY AVENUE 18
Vinca Realtors Private Limited
Sahakar excel Acropolis - I
EXCEL ENTERPRISES REALTY LLP
ADDRESS 51
V LAXMI EKTA DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: ULTRA SPACE DEVELOPERS PRIVATE LIMITED
ULTRA SPACE DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including INSIGNIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if INSIGNIA is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INSIGNIA?
The registered promoter entity is ULTRA SPACE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INSIGNIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against INSIGNIA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for INSIGNIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INSIGNIA?
The professionals named in the filing: Architect: GVS Architects & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INSIGNIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback