Red flags

  • 64 complaints at MahaRERA
  • Completion date moved by 26 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
48 of 66Construction stages doneacross 6 buildings; furthest along: External plumbing and external plaster, 98%
64Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

INSIGNIA is a Others project by ULTRA SPACE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002313 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 26 months from the original filing. 64 complaints are on record with the regulator.

At a glance

Project

  • NameINSIGNIA
  • TypeOthers
  • Location
    • C.S.T. Road
    • Kalina
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002313
  • ReraGenie IDRG-MH-10308

Builder

  • NameULTRA SPACE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany

Key dates

this monthRegisteredJul 2017First promiseApr 2020Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Apr 2020)
  • Buildings6 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA200000
WING BNA200000
WING CNA200000
WING DNA200000
WING ENA210000
WING FNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 5 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is External plumbing and external plaster, at 98%.

WING A96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
WING B96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
WING C96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
WING D96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
WING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
WING F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 5 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes98%
Solid Waste Management And DisposalYes98%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingYes98%

Parking filed619

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots619
Closed/Covered526
Open Space93
BuildingClosed/CoveredOpen SpaceTotal
WING A8927116
WING B9922121
WING C91091
WING D331851
WING E701080
WING F14416160

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,203 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI28915.98
Proposed, not sanctioned27,608 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR CHINCHOLI PHATAK SIGNAL S V ROAD MALAD WEST MUMBAI 400064

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGVS Architects & Associates
PartnerRole in project
ULTRA SPACE DEVELOPERS PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005582Apr 2020 → Apr 2020

Reason as filed by the promoterThe Project namely, ‘Insignia’ is at the final stage of completion. The RCC work of buildings in the said project is complete. Annexed hereto as Annexure ‘A’ (Collectively) are few current photographs of the said project in this regard. The said project is approximately 95% complete. Annexed hereto as Annexure ‘B’ is a copy of the letter dated 26.12.2019 of GVS Architects & Associates, certifying the status of extent of completion of the said project. The tentative time required for completion of the project is about 6 months. Annexed hereto as Annexure ‘C’ is copy of a letter dated 27.12.2019

EXT51800001356Apr 2020 → Apr 2020

Reason as filed by the promoterThe project namely “Insignia” on plot bearing/ CTS/ Survey/ Final Plot No. CTS No. 5530/A at Andheri, Andheri Mumbai Suburban, 400 051 (hereinafter referred to as the “said Project”) is at final stage of completion. RCC work of the building / wings comprised in the said Project is fully complete. Interiors of the building / wings comprised in the said Project are being completed. Occupation Certificate (OC) of the building / wings comprised in the said Project shall be applied for within 90 (ninety) days and upon grant of OC, possession shall be offered to the flat purchasers of the building /

EXT51800009356Apr 2020 → Dec 2021

Reason as filed by the promoterThe project namely “Insignia” on plot bearing/ CTS/ Survey/ Final Plot No. CTS No. 5530/A at Andheri, Andheri Mumbai Suburban, 400 051 (hereinafter referred to as the “said Project”) is at final stage of completion. RCC work of the building / wings comprised in the said Project is fully complete. Interiors of the building / wings comprised in the said Project are being completed. Occupation Certificate (OC) of the building / wings comprised in the said Project shall be applied for within 90 (ninety) days and upon grant of OC, possession shall be offered to the flat purchasers of the building /

Litigation declared2

CaseCourtStatus
97/SW/2013/2013Additional Chief Metropolitan Magistrate Court BandraHearing on discharge application
117/2017RERAHEARING

Complaints filed with MahaRERA64

Case no.ComplainantRespondentFiled
CC006000000000117Ashwin ShettyUltra Space Developers Private Limited24/08/2017
CC006000000057140Mr. Sushir LohiaUltra Space Developers Pvt Ltd08/12/2018
CC006000000057141Sunil AgarwalUltra Space Developers Pvt. Ltd.08/12/2018
CC006000000057142Ravi DuvvuruUltra Space Developers Pvt Ltd08/12/2018
CC006000000057151Himanshu VyapakUltra Space Developers Pvt Ltd08/12/2018
CC006000000057191Niraj Piyush ShahUltra Space Developers Pvt Ltd08/12/2018
CC006000000057193Ashish PitaleUltra Space Developers Pvt Ltd08/12/2018
CC006000000057194Parag WaghUlra Space Developers Pvt. Ltd08/12/2018
CC006000000057196Pushpraj Samy NadarUltra Space Developers Pvt Ltd08/12/2018
CC006000000057210Sanjay SethiUltra Space Developers Pvt Ltd08/12/2018
CC006000000057224Aashwin DugalUltra Space Developers Pvt Ltd08/12/2018
CC006000000057228Jaywant DurgeUltra Space Developers Pvt. Ltd.08/12/2018
CC006000000057344Raghav KapoorUltra Space Developers Pvt Ltd28/12/2018
CC006000000057348Saurabh BhatUltra Space Developers Pvt Ltd28/12/2018
CC006000000057355Shantiswarup PandaUltra Space Developers Pvt Ltd28/12/2018
CC006000000057388Ashish AggarwalUltra Space Developers Pvt Ltd28/12/2018
CC006000000057466Sushma KaushikUltra Space Developers Pvt Ltd28/12/2018
CC006000000057470Srinath SrinivasanUltra Space Developers Pvt Ltd28/12/2018
CC006000000057471Anshuman AsthanaUltra Space Developers Pvt Ltd28/12/2018
CC006000000057527Bamasish PaulUltra Space Developers Pvt Ltd03/01/2019
CC006000000057528Balasubramanian VenkatesanUltra Space Developers Pvt Ltd03/01/2019
CC006000000057529Shyamal KarmakarUltra Space Developers Pvt Ltd03/01/2019
CC006000000057530Malcolm MistryUltra Space Developers Pvt Ltd03/01/2019
CC006000000057531Varadarajan SubbaramanUltra Space Developers Pvt Ltd03/01/2019
CC006000000057532Rajinder Kumar ChughUltra Space Developers Pvt Ltd03/01/2019
CC006000000057533Nandina Biswas RamchandranUltra Space Developers Pvt Ltd03/01/2019
CC006000000057699Sonali Naresh GoelUltra Space Developers Pvt Ltd19/01/2019
CC006000000057712Indradeep KhanUltra Space Developers Private Limited19/01/2019
CC006000000057715Ankush V PitaleUltra Space Developers Private Limited19/01/2019
CC006000000057718Sangya MishrUltra Space Developers Private Limited19/01/2019
CC006000000057731Nisha RajeshUltra Space Developers Private Limited19/01/2019
CC006000000057732Neelabh SanyalUltra Space Developers Private Limited19/01/2019
CC006000000057737Farman Ellahi SiddiquiUltra Space Developers Private Limited19/01/2019
CC006000000057742Sanjeev MohtaUltra Space Developers Private Limited19/01/2019
CC006000000057743Sanjeev MohtaUltra Space Developers19/01/2019
CC006000000057746Chetan JainUltra Space Developers Pvt Ltd19/01/2019
CC006000000058038Rahul JainUltra Space Developers Pvt Ltd12/02/2019
CC006000000058041Ashish KediaUltra Space Developers Pvt Ltd12/02/2019
CC006000000058042Anupam GoenkaUltra Space Developers12/02/2019
CC006000000058047Mahendra Singh MehtaUltra Space Developers12/02/2019
CC006000000058053Pankaj VaishnavUltra Space Developers12/02/2019
CC006000000058063Sanjay SinghUltra Space Developers Pvt Ltd12/02/2019
CC006000000078284Gaurav MahajanUltra Space Developers28/02/2019
CC006000000078298Subroto SomUltra Space Developers28/02/2019
CC006000000078471Vineet SachdevaUltra Space Developers Pvt Ltd14/03/2019
CC006000000078544Navin SambtaniUltra Space Developers18/03/2019
CC006000000078781Devang Ramesh ParekhUltra Space Developers Pvt Ltd27/04/2019
CC006000000079054Suresh BajpaiUltra Space Developers Pvt Ltd27/04/2019
CC006000000079056Puneet SinghviUltra Space Developers Pvt Ltd27/04/2019
CC006000000079057Ajay KanwalUltra Space Developers Pvt Ltd27/04/2019
CC006000000079058Ashish VaidyaUltra Space Developers Pvt Ltd27/04/2019
CC006000000079059ANIL KOTHURIUltra Space Developers Pvt Ltd27/04/2019
CC006000000079167Aishwarya Vishal AgarwalUltra Space Developers Pvt Ltd06/05/2019
CC006000000079458Ravi SinghviUltra Space Developers Pvt Ltd25/05/2019
CC006000000079460Bina DeGamiaUltra Space Developers Pvt Ltd25/05/2019
CC006000000089718Leena Ajay DasaniUltra Space Developers Pvt Ltd12/06/2019
CC006000000089720Ashok KalyanpurUltra Space Developers Pvt Ltd12/06/2019
CC006000000089721Vikram UttamsinghUltra Space Developers Pvt Ltd12/06/2019
CC006000000089844Rajeev P. PawarUltra Space Developers25/06/2019
CC006000000089845Shrinath Ramanujan IyengarUltra Space Developers25/06/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Mar 2022

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2284122_OC_signed.pdf5 Mar 2022
Certificates of CA (Form 5)File: Form 5_Insignia.pdf17 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Letter from GVS to Sub-Engineer (CC REVALIDATION).pdf12 Nov 2018
Details of encumbrancesFile: Details of Encumbrance.pdf12 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect's Certificate - Insignia.pdf26 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer's Certificate - Insignia.pdf26 Oct 2017
Certificates of CA (Form 3)File: Form 3 - CA Certificate - Insignia.pdf26 Oct 2017
Proforma of Allotment letterFile: Proforma of the Allotment Letter and Agreement for Sale - Insignia.pdf12 Sep 2017
Building plan approvalFile: Upper ground floor plan WING A to F.PDF27 Jul 2017
Details of encumbrancesFile: TC - Insignia.pdf27 Jul 2017
Details of encumbrancesFile: Right of Way.pdf27 Jul 2017
Building Plan Approval (IOD)File: Upper ground floor plan WING A to F.PDF27 Jul 2017
Declaration in FORM BFile: Declaration Form 'B' - Insignia.pdf27 Jul 2017
Proforma of Allotment letterFile: Proforma of Allotment Letter and Agreement for Sale.pdf27 Jul 2017
Layout approvalFile: Upper ground floor plan WING A to F.PDF26 Jul 2017
Building plan approvalFile: WING A line area Diagram.PDF26 Jul 2017
Building plan approvalFile: WING B line area Diagram.pdf26 Jul 2017
Building plan approvalFile: WING C line area Diagram.PDF26 Jul 2017
Building plan approvalFile: WING D line area Diagram.pdf26 Jul 2017
Building plan approvalFile: WING E line area Diagram.pdf26 Jul 2017
Building plan approvalFile: WING F line area Diagram.pdf26 Jul 2017
Building plan approvalFile: WING A 7th floor REFUGE AREA line area Diagram.pdf26 Jul 2017
Building plan approvalFile: 13th floor plan WING A, B, C and D.pdf26 Jul 2017
Building plan approvalFile: 13th floor plan WING E and F.pdf26 Jul 2017
Building plan approvalFile: Lower ground floor plan WING A to F.PDF26 Jul 2017
Building plan approvalFile: Section A,B,C,D of WING A to D.pdf26 Jul 2017
Building plan approvalFile: Section B and C of wing E and F.pdf26 Jul 2017
Building plan approvalFile: Terrace floor plan WING A to D.PDF26 Jul 2017
Building plan approvalFile: Typical floor plan 2nd, 4th, 6th, 8th, 10th and 12th WING A, B, C and D.pdf26 Jul 2017
Building plan approvalFile: IOD Letter 17th April 2017.pdf26 Jul 2017
Building plan approvalFile: 1st basement floor plan WING A to F.PDF26 Jul 2017
Building plan approvalFile: 1st floor Podium level floor plan.pdf26 Jul 2017
Building plan approvalFile: 2nd basement floor plan WING A to F.PDF26 Jul 2017
Building plan approvalFile: 3rd basement floor plan WING A to F.PDF26 Jul 2017
Building plan approvalFile: 7th floor REFUGE floor plan WING A, B, C and D.pdf26 Jul 2017
Building plan approvalFile: Typical floor plan 3rd, 5th, 9th and 11th WING A, B, C and D.pdf26 Jul 2017
Building plan approvalFile: Typical floors plan 2nd to 6th and 8th to 12th floor WING E and F.pdf26 Jul 2017
PAN CardFile: PAN - ULTRA SPACE DEVELOPERS PRIVATE LIMITED.pdf26 Jul 2017
Copy of the legal title reportFile: TC - Insignia.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Upper ground floor plan WING A to F.PDF26 Jul 2017
Building Plan Approval (IOD)File: IOD Letter 17th April 2017.pdf26 Jul 2017
Building Plan Approval (IOD)File: 1st basement floor plan WING A to F.PDF26 Jul 2017
Building Plan Approval (IOD)File: 1st floor Podium level floor plan.pdf26 Jul 2017
Building Plan Approval (IOD)File: 2nd basement floor plan WING A to F.PDF26 Jul 2017
Building Plan Approval (IOD)File: 3rd basement floor plan WING A to F.PDF26 Jul 2017
Building Plan Approval (IOD)File: 7th floor REFUGE floor plan WING A, B, C and D.pdf26 Jul 2017
Building Plan Approval (IOD)File: 13th floor plan WING A, B, C and D.pdf26 Jul 2017
Building Plan Approval (IOD)File: 13th floor plan WING E and F.pdf26 Jul 2017
Building Plan Approval (IOD)File: Lower ground floor plan WING A to F.PDF26 Jul 2017
Building Plan Approval (IOD)File: Section A,B,C,D of WING A to D.pdf26 Jul 2017
Building Plan Approval (IOD)File: Section B and C of wing E and F.pdf26 Jul 2017
Building Plan Approval (IOD)File: Terrace floor plan WING A to D.PDF26 Jul 2017
Building Plan Approval (IOD)File: Typical floor plan 2nd, 4th, 6th, 8th, 10th and 12th WING A, B, C and D.pdf26 Jul 2017
Building Plan Approval (IOD)File: Typical floor plan 3rd, 5th, 9th and 11th WING A, B, C and D.pdf26 Jul 2017
Building Plan Approval (IOD)File: Typical floors plan 2nd to 6th and 8th to 12th floor WING E and F.pdf26 Jul 2017
Building Plan Approval (IOD)File: WING A 7th floor REFUGE AREA line area Diagram.pdf26 Jul 2017
Building Plan Approval (IOD)File: WING A line area Diagram.PDF26 Jul 2017
Building Plan Approval (IOD)File: WING B line area Diagram.pdf26 Jul 2017
Building Plan Approval (IOD)File: WING C line area Diagram.PDF26 Jul 2017
Building Plan Approval (IOD)File: WING D line area Diagram.pdf26 Jul 2017
Building Plan Approval (IOD)File: WING E line area Diagram.pdf26 Jul 2017
Building Plan Approval (IOD)File: WING F line area Diagram.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect (Form 1).pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer (Form 2).pdf26 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Insignia.pdf26 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 26 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INSIGNIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalina6,700+ in Mumbai Suburban

2 kmINSIGNIACompleted 64Lapsed / revoked 64Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 217 registered projects within 2 km.

Builder: ULTRA SPACE DEVELOPERS PRIVATE LIMITED

ULTRA SPACE DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including INSIGNIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if INSIGNIA is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INSIGNIA?

The registered promoter entity is ULTRA SPACE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INSIGNIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against INSIGNIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for INSIGNIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INSIGNIA?

The professionals named in the filing: Architect: GVS Architects & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INSIGNIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INSIGNIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INSIGNIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.