Home / Browse projects / Mumbai City, Maharashtra / INSIGNIA

Registration lapsed No litigation declared Residential / Group Housing project

INSIGNIA

By Ashwatha Developers

RG-MH-27081 · RERA P51900012105 · Last updated on MahaRERA portal: 22 Nov 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
0 of 11Construction stages donefurthest along: Excavation, 50%
2Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

INSIGNIA is a Residential / Group Housing project by Ashwatha Developers in Mumbai City, Maharashtra, registered with MahaRERA as P51900012105 on 1 Sep 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameINSIGNIA
  • TypeResidential / Group Housing
  • Location
    • S.K. Bole Road
    • Dadar West
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012105
  • ReraGenie IDRG-MH-27081

Builder

  • NameAshwatha Developers
  • Entity typePartnership

Key dates

22 months past promisethis monthRegisteredSep 2017PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INSIGNIANA560000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.

INSIGNIA: 5% average across the applicable activities

ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed300

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots300
Closed/Covered300

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,048 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16290.3
Proposed, not sanctioned7,100 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchReliance sahkari bhandar, Ludo Mall, S K Bole road, Agarbazar, Dadar west, Mumbai 28

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architect & Consultants
PartnerRole in project
Ashwatha Developers-

Litigation declared8

CaseCourtStatus
1731/2009Bombay High CourtDISPOSED
1405/2010City Civil CourtPending
3107/2014City Civil CourtPending
2321/2016Bombay High CourtPending
2319/2016Bombay High CourtPending
2731/2016Bombay High CourtPending
24044/2014SUPREME COURT OF iNDIAPENDING
116/2012High Court of BombayDISPOSED

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000194883Smt. Bhavna Hasmukh GogriHemant Nanji Chheda21/11/2020
CC12500255PURVI AMIT THAKKARAshwatha Developers24/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 PS - Engineer.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - March 2023.pdf22 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATED.pdf8 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_Revalidation_approval_Letter -21-08-2020.pdf21 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE - FORM-2 DTD- 03-10-2019.pdf15 Oct 2019
Certificates of CA (Form 5)File: form _5 CA KAMLESHBHAI Certificate dtd 24-09-2019.pdf15 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate in Form 2 .pdf25 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE - FORM-2 DTD- 17-04-2019.pdf25 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidated upto 27-07-2020.pdf22 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATED.pdf19 Jul 2019
Proforma of Allotment letterFile: Draft Allotment Letter.pdf4 May 2019
Proforma of Allotment letterFile: Draft Allotment Letter.pdf4 May 2019
Form 2AFile: ENGINEER'S CERTIFICATE - FORM-2 DTD- 17-04-2019.pdf25 Apr 2019
Proforma of Allotment letterFile: Final Draft of AGREEMENT FOR SALE ( FINAL ).pdf25 Apr 2019
Certificates of CA (Form 5)File: Form_5.pdf7 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE - FORM-2---DTD- 10-10-2018.pdf25 Oct 2018
Certificates of CA (Form 3)File: CA CERTIFICATE - FORM 3-DTD- 17-10-2018 BY SMCA.pdf25 Oct 2018
Proforma of Allotment letterFile: Final letter of allotment dtd 14-09-2018.pdf14 Sep 2018
Proforma of Allotment letterFile: Rera_Agreement_ dtd 14-09-2018.pdf14 Sep 2018
Building plan approvalFile: Amended Approval IOD dtd 04-07-2016.pdf6 Jun 2018
Building plan approvalFile: Amended Approval Letter Dtd- 07-05-2018.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-1-2.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-3-4.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-5-6.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-7-9.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-10-11.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet No-12.pdf6 Jun 2018
Building plan approvalFile: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-13-15.pdf6 Jun 2018
Building Plan Approval (IOD)File: Amended Approval IOD dtd 04-07-2016.pdf6 Jun 2018
Building Plan Approval (IOD)File: Amended Approval Letter Dtd- 07-05-2018.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-1-2.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-3-4.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-5-6.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-7-9.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-10-11.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet No-12.pdf6 Jun 2018
Building Plan Approval (IOD)File: Approval of 2nd Ammended plans Drawing dtd-07-05-2018 Sheet Nos-13-15.pdf6 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 Mar 2018
Declaration in FORM BFile: FORM -B NOTARISED COPY OF AFFIDAVIT CUM DECLARATION.pdf20 Dec 2017
Building plan approvalFile: New Doc 2017-07-29.pdf29 Jul 2017
Layout approvalFile: New Doc 2017-07-29.pdf29 Jul 2017
PAN CardFile: ASHWATHA DEVELOPERS PAN CARD.pdf29 Jul 2017
Copy of the legal title reportFile: REPORT ON TITLE-ilovepdf-compressed (1).pdf29 Jul 2017
Details of encumbrancesFile: Encumbrances.PDF29 Jul 2017
Copy of Layout Approval (in case of layout)File: New Doc 2017-07-29.pdf29 Jul 2017
Building Plan Approval (IOD)File: New Doc 2017-07-29.pdf29 Jul 2017
Declaration in FORM BFile: Form B.PDF29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate.PDF29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: Declaration.PDF29 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INSIGNIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadar West780+ in Mumbai City

2 kmINSIGNIACompleted 68Lapsed / revoked 58Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 224 registered projects within 2 km.

Builder: Ashwatha Developers

Ashwatha Developers has 1 registration on MahaRERA, including INSIGNIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that INSIGNIA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if INSIGNIA is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INSIGNIA?

The registered promoter entity is Ashwatha Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INSIGNIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against INSIGNIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for INSIGNIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INSIGNIA?

The professionals named in the filing: Architect: Aakar Architect & Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INSIGNIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INSIGNIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INSIGNIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.