INDIAN NEWSPAPER SOCIETY - INS

By ORBIT ENTERPRISES

RG-MH-40158 · RERA P51800006763 · Last updated on MahaRERA portal: 14 Jul 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • 33 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
33Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

INDIAN NEWSPAPER SOCIETY - INS is a Commercial project by ORBIT ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006763 on 16 Aug 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. The completion date has moved by 24 months from the original filing. 33 complaints are on record with the regulator.

At a glance

Project

  • NameINDIAN NEWSPAPER SOCIETY - INS
  • TypeCommercial
  • Location
    • BKC Road
    • Bandra Kurla Complex
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006763
  • ReraGenie IDRG-MH-40158

Builder

  • NameORBIT ENTERPRISES
  • Entity typeOthers
  • PartnerRajen Vasant Dhruv
  • Named personsBHUTA SECURITIES LIMITED, STARLINK REALTY PRIVATE LIMITED, NAVNIT INFRA PROJECT PRIVATE LIMITED, RAJEN VASANKUMAR DHRUV

Key dates

58 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INS A WINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

INS A WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes99%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed386

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots386
Closed/Covered386

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,415 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
INDIAN NEWSPAPER SOCIETYAndheriMumbai Suburban

Approvals and building plan

Permissible FSI28898.25
Proposed, not sanctioned28,898 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCRYSTAL BUILDING, ALTAMOUNT ROAD , MUMBAI-400026

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectY E RAFIK
ArchitectRaja Aederi Consultants Pvt. Ltd.
EngineerJW Consultants
Chartered AccountantPrakash Patil & Associates
Chartered AccountantRamesh Vora & Co
PartnerRole in project
ORBIT ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005551Dec 2019 → Dec 2020

Reason as filed by the promoterThe project is delayed for reasons beyond our control.

Litigation declared1

CaseCourtStatus
3373/2017BOMBAY HIGH COURTPENDING

Complaints filed with MahaRERA33

Case no.ComplainantRespondentFiled
CC006000000171685Samruddha Resources LimitedOrbit Enterprises27/11/2019
CC006000000056595M/S PRISM CORPORATIONM/S ORBIT ENTERPRISES16/10/2018
CC006000000056597M/S OFFICE DEPOTORBIT ENTERPRISES16/10/2018
CC006000000056620M/S OFFICE DEPOTORBIT ENTERPRISES23/10/2018
CC006000000056953SURESH HASSANAND VAZIRANIM/s. Orbit Enterprises19/11/2018
CC006000000057197Suresh VaziraniM/s. Orbit Enterprises06/12/2018
CC006000000057464Suresh Hassanand VaziraniM/s. Orbit Enterprises28/12/2018
CC006000000056760Vinar Overseas Pvt. Ltd.M/s Orbit Enterprises29/10/2018
CC006000000057716KISHANCHAND K RAMANIORBIT ENTERPRISES17/01/2019
CC006000000192661KISHANCHAND K RAMANIM/S ORBIT ENTERPRISES18/02/2020
CC006000000057769Saif Ali Khan PataudiORBIT ENTERPRISES01/02/2019
CC006000000078632M/S ALLIANCE BUSINESS SOLUTIONSM/S ORBIT ENTERPRISES25/03/2019
CC006000000078980ORBIT ENTERPRISESVINAR OVERSEAS PRIVATE LIMITED14/05/2019
CC006000000089592GOVINDARAJAN SANKARANORBIT ENTERPRISES04/06/2019
CC006000000100423MANIRATNA ENTERPRISESORBIT ENTERPRISES22/08/2019
CC006000000100547JAGRUTI GEMSORBIT ENTERPRISES22/08/2019
CC006000000100556DAKSHORBIT ENTERPRISES22/08/2019
CC006000000100545S R GEMS EXPORTSORBIT ENTERPRISES22/08/2019
CC006000000100551RAJEEV BOTHRAORBIT ENTERPRISES22/08/2019
CC006000000100558CHETANKUMAR K SHAH & OTHERSORBIT ENTERPRISES25/09/2019
CC006000000100602SAMKIT DIAMOND EXPORT PVT LTDORBIT ENTERPRISES22/08/2019
CC006000000141075RKB GLOBAL LTDOrbit Enterprises27/09/2019
CC006000000194942KUNAL UDAY GANDHI & UDAY SHANTILAL GANDHIORBIT ENTERPRISES & INDIAN NEWSPAPER SOCIETY19/11/2020
CC006000000251655ORBIT ENTERPRISESDr. Govindrajan Sankaran29/06/2022
CC006000000262052ORBIT ENTERPRISESTransaia Bio-Medicals Ltd27/07/2022
CC006000000282111ORBIT ENTERPRISESTransaia Bio-Medicals Ltd27/07/2022
CC006000000282113ORBIT ENTERPRISESTransaia Bio-Medicals Ltd27/07/2022
CC006000000303223ORBIT ENTERPRISESSaif Ali Khan Pataudi03/11/2022
CC006000000272092Rajkumar Sharma And Meenakshi SharmaM/s. Orbit Enterprises26/07/2022
CC006000000272095Twiga Enterprises LLPM/s. Orbit Enterprises26/07/2022
CC12500211Vandit VaghasiaORBIT ENTERPRISES21/01/2025
CC12501139Vandit VaghasiaORBIT ENTERPRISES05/04/2025
CC12501142Vandit VaghasiaORBIT ENTERPRISES05/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2021

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: scanned form B 13723.pdf14 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Rehab31122022.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate sale31122022.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Rehab31032023.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate sale31032023.pdf27 Jun 2023
Certificates of CA (Form 3)File: CA Certiifcate 31122022 Final.pdf27 Jun 2023
Certificates of CA (Form 3)File: CA Certiifcate 31032023 Final.pdf27 Jun 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate3112018.pdf27 Jun 2023
Certificates of CA (Form 3)File: form 3 09012020 170157.pdf27 Jun 2023
Declaration about Commencement CertificateFile: Declaration for CC.pdf3 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf3 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg Certificate - Rehab.pdf3 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg Certificate - Sale.pdf3 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 31032020.pdf3 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 31032021.pdf3 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 31032022.pdf3 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold - Unsold details.pdf3 Jan 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5_ 2017_18.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_2018_19.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_2019_20.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_2021_22.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_2020_21.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_2021_22.pdf3 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank Account.pdf3 Jan 2023
OtherFile: Part OC.pdf19 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Scan.pdf12 Apr 2021
Layout approvalFile: NO LAYOUT DECLARATION.pdf30 Jul 2017
Building plan approvalFile: CC upto 14 floor from MMRDA to INS dt 1.pdf30 Jul 2017
PAN CardFile: Pan Card Orbit.pdf30 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf30 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: NO LAYOUT DECLARATION.pdf30 Jul 2017
Building Plan Approval (IOD)File: CC upto 14 floor from MMRDA to INS dt 1.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC upto 14 floor from MMRDA to INS dt 1.pdf30 Jul 2017
Declaration in FORM BFile: Form B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sale Wing.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Rehab Wing.pdf30 Jul 2017
Certificates of CA (Form 3)File: ca certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Declaration for No Agreement.pdf30 Jul 2017
OtherFile: Self Declaration.pdf30 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INDIAN NEWSPAPER SOCIETY - INS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra Kurla Complex6,700+ in Mumbai Suburban

2 kmINDIAN NEWSPAPER SOCIETYCompleted 70Lapsed / revoked 65Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: ORBIT ENTERPRISES

ORBIT ENTERPRISES has 1 registration on MahaRERA, including INDIAN NEWSPAPER SOCIETY - INS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that INDIAN NEWSPAPER SOCIETY - INS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if INDIAN NEWSPAPER SOCIETY - INS is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDIAN NEWSPAPER SOCIETY - INS?

The registered promoter entity is ORBIT ENTERPRISES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDIAN NEWSPAPER SOCIETY - INS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against INDIAN NEWSPAPER SOCIETY - INS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for INDIAN NEWSPAPER SOCIETY - INS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDIAN NEWSPAPER SOCIETY - INS?

The professionals named in the filing: Architect: Y E RAFIK; Architect: Raja Aederi Consultants Pvt. Ltd.; Engineer: JW Consultants; Chartered Accountant: Prakash Patil & Associates; Chartered Accountant: Ramesh Vora & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDIAN NEWSPAPER SOCIETY - INS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDIAN NEWSPAPER SOCIETY - INS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDIAN NEWSPAPER SOCIETY - INS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.