Home / Browse projects / Palghar, Maharashtra / IMPERIALPARAMOUNT

Registered No litigation declared Residential / Group Housing project

IMPERIALPARAMOUNT

By Shivganga Construction & Redevelopers

RG-MH-99579 · RERA P99000046574 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 1 extension taken
  • Rs 8.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 13 months from the original
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
150 of 259Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

IMPERIALPARAMOUNT is a Residential / Group Housing project by Shivganga Construction & Redevelopers in Palghar, Maharashtra, registered with MahaRERA as P99000046574 on 19 Aug 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 13 months from the original filing. 109 of the 259 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameIMPERIALPARAMOUNT
  • TypeResidential / Group Housing
  • Location
    • VILLAGE SOPARA
    • NALLASOPARA WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • RERA no.P99000046574
  • ReraGenie IDRG-MH-99579

Builder

  • NameShivganga Construction & Redevelopers
  • Entity typePartnership
  • PartnersGANGARAM RAJLINGAM MUKUND, SHAKUNTALA KALGONDA HEGAJE, SHIVANAND KALGONDA HEGAJE, RAMESH GANGARAM MUKUND, AJAY SUDARSHAN SHETH, GAYATRI KALGONDA HEGAJE

Key dates

this monthRegisteredAug 2022First promiseNov 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Nov 2025)
  • Buildings1 building record
  • Documents filed143 files

Current status

42%109 of 259 units booked
95.1%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IMPERIAL PARAMOUNT WING A B CNA1715156103259

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

IMPERIAL PARAMOUNT WING A B C: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed570

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots570
Closed/Covered228
Open Space342

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,730 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 8.00 crore
CERSAI search filedYes
Declared on13 Aug 2026
LandownerVillageDistrict
Heera Panna Sharma Co-op Hsg Soc. LtdVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI14598.39
Proposed, not sanctioned14,598 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.1,2,3,4 AND 5SHREE RAM SANKUL, ACHOLE ROADNALASOPARA EAST
Estimated costRs 42.06 cr
Cost incurredRs 40.02 cr
Work done95.13%
BuildingWingEstimatedIncurred
IMPERIAL PARAMOUNT WING A B CNARs 37.44 crRs 36.31 cr
-NARs 4.63 crRs 3.70 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShree Consultants KASHID
EngineerVikrant Kothari Kothari
EngineerSiddhi Mangesh Raut
Chartered AccountantDarshan B Raut & Associates Raut
Chartered AccountantB. K. MAJITHIA & Co
PartnerRole in project
Shivganga Construction & Redevelopers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20022619913Nov 2025 → Dec 2026

Reason as filed by the promoterWe respectfully submit that certain unavoidable circumstances have led to delays affecting the overall progress of the project. The details of the same are outlined below for your kind consideration: Delay in Approval of Plinth Completion Certificate (Plinth CC) There was a delay in obtaining the Plinth Completion Certificate from the concerned authority. Since further structural work is legally permissible only after receipt of the Plinth CC, construction activities beyond plinth level could not be commenced as scheduled. This resulted in consequential delay in the project timeline. Procureme

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1_compressed.pdf22 Jul 2026
Withdrawal Update Form 2File: FORM-2.pdf22 Jul 2026
Withdrawal Update Form 3File: FORM-3_compressed.pdf22 Jul 2026
Withdrawal Update Form 1File: FORM-1.pdf28 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf28 Apr 2026
Withdrawal Update Form 3File: FORM-3_compressed.pdf28 Apr 2026
Layout approvalFile: Sheet 1 ( Layout )_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 2 ( Ground Floor)_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 3_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 4_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 5_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 6_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 6_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 7_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 8_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 9_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 10_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 11_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 12_compressed.pdf11 Mar 2026
Building plan approvalFile: Sheet 13_compressed.pdf11 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf11 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf11 Mar 2026
Withdrawal Update Form 3File: Form-3_compressed.pdf11 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Paramount.pdf9 Feb 2026
Form 1File: Form-1.pdf19 Jan 2026
Form 2File: Form-2.pdf19 Jan 2026
Form 3File: Form-3_compressed.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Paramount.pdf19 Jan 2026
Form 1File: Form-1.pdf13 Nov 2025
Form 2File: Form-2.pdf13 Nov 2025
Form 3File: Form-3_compressed.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf13 Nov 2025
Form 1File: FORM-1.pdf23 Jul 2025
Form 2File: FORM-2.pdf23 Jul 2025
Form 3File: FORM-3_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf4 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure - Paramount.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure April - June 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2)_compressed.pdf13 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Sale Agreement Draft -ABHFL.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DECLARATION M24.pdf20 May 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf17 May 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M24.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M24.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 M24.pdf17 May 2024
Proforma of Agreement for saleFile: Sale Agreement Draft.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July - Sept 2022.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct- Dec 2022.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan- l March 2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April - June 2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July - Sept 2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct - Dec 2023.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf12 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Shivganga.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JULY 22 TO SEPTEMBER 22.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OCTOBER 22 TO DECEMBER 22.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JANUARY 23 TO MARCH 23.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 APRIL 23 TO JUNE 23.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JULY 23 TO SEPTEMBER 23.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OCTOBER 23 TO DECEMBER 23.pdf12 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 22-23.pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-G 17.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 July-Sep 2022.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Oct - Dec 2022.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Jan-March 2023.pdf10 Feb 2024

How this compares with Palghar

42%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 13 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IMPERIALPARAMOUNT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA WEST3,200+ in Palghar

Builder: Shivganga Construction & Redevelopers

Shivganga Construction & Redevelopers has 1 registration on MahaRERA, including IMPERIALPARAMOUNT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if IMPERIALPARAMOUNT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IMPERIALPARAMOUNT?

The registered promoter entity is Shivganga Construction & Redevelopers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IMPERIALPARAMOUNT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IMPERIALPARAMOUNT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IMPERIALPARAMOUNT?

The professionals named in the filing: Architect: Shree Consultants KASHID; Engineer: Vikrant Kothari Kothari; Engineer: Siddhi Mangesh Raut; Chartered Accountant: Darshan B Raut & Associates Raut; Chartered Accountant: B. K. MAJITHIA & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IMPERIALPARAMOUNT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IMPERIALPARAMOUNT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IMPERIALPARAMOUNT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.