Home / Browse projects / Aurangabad, Maharashtra / IDEAS-1

Registration lapsed No litigation declared Residential / Group Housing project

IDEAS-1

By IDEAS DEVELOPERS

RG-MH-02734 · RERA P51500046377 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
8 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

IDEAS-1 is a Residential / Group Housing project by IDEAS DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500046377 on 22 Jun 2022. Possession was promised by 31 May 2026 and is now 5 months past that date. 40 of the 48 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameIDEAS-1
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 57 AND 58
    • GUT NO 68
    • AURANGABAD
    • ITKHEDA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500046377
  • ReraGenie IDRG-MH-02734

Builder

  • NameIDEAS DEVELOPERS
  • Entity typePartnership
  • PartnersSUBHASH SARDA, GOPAL MAHAJAN, SUVARNA DARAK, SANJAY BHUTADA, MADHUSUDAN BAJAJ, RAMESH GADEKAR, SANTOSH SARDA, RAJENDRA LOYA, SAROJ SINGH, SUNIL GADEKAR, SAPANA LOYA

Key dates

5 months past promisethis monthRegisteredJun 2022PromisedMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Jun 2022
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

83%40 of 48 units booked
93.0%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IDEAS-1NA151248048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

IDEAS-1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Open Space26

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,637 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI7459.02
Proposed, not sanctioned7,459 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchN-5, UDYOG BHAVAN, CIDCO, AURANGABAD
Estimated costRs 16.55 cr
Cost incurredRs 15.39 cr
Work done92.98%
BuildingWingEstimatedIncurred
IDEAS-1NARs 15.93 crRs 14.88 cr
-NARs 61.45 lakhRs 50.44 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER N AUSEKAR
ArchitectAr SAMEER AUSEKAR
EngineerEr MILIND WADEKAR
Chartered AccountantSanket Lalwani
Chartered AccountantSANDEEP DEVIDAN
Chartered AccountantCA NISHANT MANTRI
PartnerRole in project
IDEAS DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: IDEAS DEVELOPER Architect Certificate.pdf7 May 2026
Withdrawal Update Form 2File: IDEAS DEVLOPER Engineer Certificate.pdf7 May 2026
Withdrawal Update Form 3File: IDEAS DEVELOPER FORM 3.pdf7 May 2026
Withdrawal Update Form 1File: Architect Certificate 3Q 25-26.pdf5 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate 3Q 25-26.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf5 Feb 2026
Withdrawal Update Form 1File: Architect Certificate 2Q 25-26.pdf4 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate 2Q 25-26.pdf4 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf4 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 (4).pdf30 Sep 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf25 Sep 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf25 Sep 2025
Withdrawal Update Form 3File: Registration Application Form 3.pdf25 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 idea Developers_compressed.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 4Q 24-25.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 4Q 24-25.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 3Q 24-25_compressed.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 3Q 24-25_compressed.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23 .pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24 .pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 _AC_JULY TO SEPTEMBER 2024_compressed.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 09-EC_JULY TO SEPTEMBER 2024_compressed.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ideas Developer Form 3.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf9 Oct 2024
Form 5 (FY 2022-2023)27 Sep 2024
Form 5 (FY 2023-2024)File: Form 5.pdf27 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1Q 24-25.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 1Q 24-25.pdf20 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Legal.pdf26 Apr 2024
Details of encumbrancesFile: Encumbrances Legal.pdf26 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrances Legal.pdf26 Apr 2024
Declaration in FORM BFile: Form B.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 4Q 23-24.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 4Q 23-24.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf10 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf10 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account for real estate projects.pdf16 May 2023
Deviation Report with respect to Allotment letterFile: Deviation report with respect to model copy ALLOTMENT.pdf16 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to model copy of agreement.pdf16 May 2023
Proforma of Agreement for saleFile: ATS FINAL sheet.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 RERA CERTIFICATES till sep-2022-1-4_compressed.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 RERA CERTIFICATES till sep-2022-5-7_compressed.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate by Sanket lalwani.pdf20 Oct 2022
Copy of the legal title reportFile: Legal Title Report.pdf17 Jun 2022
Declaration in FORM BFile: Affidavit Cum Declaration of Ideas Notarised.pdf17 Jun 2022
Proforma of Allotment letterFile: Allotment Letter FINAL.pdf17 Jun 2022
Proforma of Allotment letterFile: ATS FINAL sheet.pdf17 Jun 2022
CERSAI detailsFile: CERSAI Report and Undertaking.pdf15 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf4 Jun 2022
Details of encumbrancesFile: Certificate of Encumbrances.pdf3 Jun 2022
Declaration about Commencement CertificateFile: Form D Declaration Commencement Certificate.pdf3 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf3 Jun 2022
Building plan approvalFile: Building Plan.pdf1 Jun 2022
Layout approvalFile: NA ORDER and Layout Plan.pdf1 Jun 2022
PAN CardFile: Ideas Developers PAN.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: NA ORDER and Layout Plan.pdf1 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf1 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf1 Jun 2022

How this compares with Aurangabad

83%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep IDEAS-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ITKHEDA1,400+ in Aurangabad

2 kmIDEAS-1Completed 17Lapsed / revoked 11Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: IDEAS DEVELOPERS

IDEAS DEVELOPERS has 1 registration on MahaRERA, including IDEAS-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that IDEAS-1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if IDEAS-1 is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IDEAS-1?

The registered promoter entity is IDEAS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IDEAS-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IDEAS-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IDEAS-1?

The professionals named in the filing: Architect: SAMEER N AUSEKAR; Architect: Ar SAMEER AUSEKAR; Engineer: Er MILIND WADEKAR; Chartered Accountant: Sanket Lalwani; Chartered Accountant: SANDEEP DEVIDAN; Chartered Accountant: CA NISHANT MANTRI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IDEAS-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IDEAS-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IDEAS-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.