ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Icon Residency

Registered No litigation declared Plotted project

Icon Residency

By ANJUM SAHER SAYED IQBAL

RG-MH-89710 · RERA PP1190002501151 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
11 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

Icon Residency is a Plotted project by ANJUM SAHER SAYED IQBAL in Nagpur, Maharashtra, registered with MahaRERA as PP1190002501151 on 9 Oct 2025. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 0 of the 11 units on this registration are recorded sold or booked.

At a glance

Project

  • NameIcon Residency
  • TypePlotted
  • Location
    • Bhilgaon
    • Nagpur
    • Kamptee
    • 440024
  • Pincode440024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PP1190002501151
  • ReraGenie IDRG-MH-89710

Builder

  • NameANJUM SAHER SAYED IQBAL
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2025First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Oct 2025
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • BuildingsNot stated in filing
  • Documents filed15 files

Current status

0%0 of 11 units booked

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo100%
Water SupplyNo100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,006 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No 28, Awasti Chowk, Jafer Nagar, Nagpur.440013, Maharashtra

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKaleem H Sheikh
EngineerVivek Raut
Chartered AccountantHuzaifa Sanawadwala
Chartered AccountantMURTAZA I HUSSAIN
PartnerRole in project
ANJUM SAHER SAYED IQBAL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21072621817Jun 2026 → Jun 2027

Reason as filed by the promoterWe, Anjum Saher Sayed Iqbal, are promoter of the project Icon Residency, registered under MahaRERA vide registration number PP1190002501151. Sir the foresaid project was projected to be completed by 30/06/2026 but due to lesser response in bookings and technical problems raised in the project the project is now bound to be delayed. The project till date is about 100% completed which is also certified by the project architect in form 1 uploaded in MahaRERA portal. Currently out of total 11 units in the project, we have sold 00 units. Out of which 00 have already given their consent for extensio

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Architect.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Engineer.pdf20 Jul 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Engineer.pdf29 Apr 2026
Form 5 (FY 2025-2026)File: Form 5 - CA.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 - Architect.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Engineer.pdf20 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCH.pdf26 Feb 2026
Withdrawal Update Form 2File: FORM-2 ENGG.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 (46).pdf26 Feb 2026
Declaration and undertaking (Annexure A)File: Declaration of Non Registration Standalone Project (9).pdf28 Jul 2025
Building plan approval or NA orderFile: Nmrda na order.pdf28 Jul 2025
Building plan approval or NA orderFile: Tehsildar NA Order.pdf28 Jul 2025
Building plan approvalFile: FINAL SANCTIONED LAYOUT MAP.pdf28 Jul 2025

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Icon Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur2,800+ in Nagpur

2 kmIcon ResidencyCompleted 6Lapsed / revoked 2Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: ANJUM SAHER SAYED IQBAL

ANJUM SAHER SAYED IQBAL has 1 registration on MahaRERA, including Icon Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Icon Residency is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Icon Residency?

The registered promoter entity is ANJUM SAHER SAYED IQBAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Icon Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Icon Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Icon Residency?

The professionals named in the filing: Architect: Kaleem H Sheikh; Engineer: Vivek Raut; Chartered Accountant: Huzaifa Sanawadwala; Chartered Accountant: MURTAZA I HUSSAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Icon Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Icon Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Icon Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.