ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Hubtown Premiere Residences - Bel Air

Registered No litigation declared Residential / Group Housing project

Hubtown Premiere Residences - Bel Air

By Hubtown Limited

RG-MH-12445 · RERA P51800005688 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
11 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 77%
17 of 81Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

Hubtown Premiere Residences - Bel Air is a Residential / Group Housing project by Hubtown Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005688 on 11 Aug 2017. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 64 of the 81 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameHubtown Premiere Residences - Bel Air
  • TypeResidential / Group Housing
  • Location
    • J.P. Road
    • Four Bungalow
    • Versova
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005688
  • ReraGenie IDRG-MH-12445

Builder

  • NameHubtown Limited
  • Entity typeCompany
  • ChairpersonHemant M Shah
  • Managing DirectorVyomesh M Shah
  • DirectorsKartik Shantilal Ruparel, Bhakti Jaywant Kothare, Milin Jagdish Ramani, Jignesh Hansraj Gala
  • Other registrations19 more →
  • Completed11 of 20
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

3 months past promisethis monthRegisteredAug 2017PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion31 Jul 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed133 files

Current status

79%64 of 81 units booked
86.3%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bel Air - Upto 13 FloorNA161650050
Bel Air - Above 14 FloorNA191931031

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 77%.

Bel Air - Upto 13 Floor61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bel Air - Above 14 Floor54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered162
BuildingClosed/CoveredTotal
Bel Air - Upto 13 Floor7070
Bel Air - Above 14 Floor9292

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area498 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Oct 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8138.33
Proposed, not sanctioned680 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHURA CENTRE GROUND FLOOR MAHAKALI CAVES ROAD ANDHERI EAST 400093
Estimated costRs 74.10 cr
Cost incurredRs 63.95 cr
Work done86.31%
BuildingWingEstimatedIncurred
Bel Air - Upto 13 FloorNARs 37.25 crRs 37.25 cr
Bel Air - Above 14 FloorNARs 28.13 crRs 23.53 cr
-NARs 8.72 crRs 3.17 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCitygold Management Services Pvt.ltd
ArchitectAAKAR ARCHITECTS (Mr. UMESH PAWAR)
EngineerRajivan Paramban
Chartered AccountantJBTM & Associates LLP
Chartered AccountantSanket Shah
Chartered AccountantMH Dalal & Association
Chartered AccountantKMVR & Company
PartnerRole in project
Hubtown Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM - I P51800005688 - Bel-air.pdf5 May 2026
Withdrawal Update Form 2File: FORM - II Engineer Certificate Bel Air.pdf5 May 2026
Withdrawal Update Form 3File: FORM - III SIGNED Belair.pdf5 May 2026
Withdrawal Update Form 1File: FORM 1- BEL AIR.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2Engineers Certificate - Premiere T1C - Dec 25.pdf25 Mar 2026
Withdrawal Update Form 3File: Form-3_BelAir.pdf25 Mar 2026
Withdrawal Update Form 1File: Form-1 Architech Certificate -Belair.pdf17 Nov 2025
Withdrawal Update Form 2File: Engineering certificate - Premiere - Tower 1C - Sep 25.pdf17 Nov 2025
Withdrawal Update Form 3File: Form III BelAir.pdf17 Nov 2025
Form 5 (FY 2024-2025)File: Form-5 Belair.pdf14 Oct 2025
Withdrawal Update Form 1File: Arch certificate_Bel Air (14th floor and above)_June 24.pdf20 Aug 2025
Withdrawal Update Form 2File: Engg Certificate_Premiere Bel Air_June 24.pdf20 Aug 2025
Withdrawal Update Form 3File: 1C - BEL AIR.pdf20 Aug 2025
Form 1File: P51800005688 - Bel-air (upto 13th Flr ).pdf10 Jul 2025
OthersFile: P51800005688 - Bel-air (14th Flr & above).pdf10 Jul 2025
Form 2File: Engineers Certificate Tower 1C March 25.pdf10 Jul 2025
Form 3File: HUBTOWN PREMIERE RESIDENCES - BEL AIR.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousre of Sold-booked inventory_Mar 25.pdf10 Jul 2025
Certificates of CA (Form 3)File: HUBTOWN PREMIERE RESIDENCES - BEL AIR.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - premiere - Tower 1C - Dec 24.pdf11 Feb 2025
Certificates of CA (Form 3)File: 1C-BEL AIR - DEC 2024.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Bel-air (upto 13th Flr ).pdf15 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Bel-air (14th Flr and above).pdf15 Jan 2025
Certificates of CA (Form 3)File: 1C-BEL AIR.pdf6 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE T1C - Premiere Sep 24.pdf22 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE T1C - Premiere Sep 24.pdf22 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2450919_FurtherCC_signed.pdf21 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2450919_FurtherCC_signed.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Belair.pdf24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Bel-air (upto 13th Flr ).pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Bel-air (14th Flr and above).pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere Bel Air_June 24.pdf23 Jul 2024
Certificates of CA (Form 3)File: 1C - BEL AIR.pdf22 Jul 2024
Certificates of CA (Form 3)File: 1C - BEL AIR.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate_Bel Air (Upto 13th floor)_June 24.pdf13 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate_Bel Air (14th floor and above)_June 24.pdf13 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere Bel Air_Mar 24.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Certificate_Premire Bel Air_FY 23-24.pdf9 May 2024
Building plan approvalFile: Amendment Letter _11082023.pdf8 May 2024
Building plan approvalFile: Amended Approval_ 11082023_Sheet - 1 to 9_11zon.pdf8 May 2024
Building plan approvalFile: Amended Approval_ 11082023_Sheet - 21 to 31_11zon.pdf8 May 2024
Building Plan Approval (IOD)File: Amendment Letter _11082023.pdf8 May 2024
Building Plan Approval (IOD)File: Amended Approval_ 11082023_Sheet - 1 to 9_11zon.pdf8 May 2024
Building Plan Approval (IOD)File: Amended Approval_ 11082023_Sheet - 21 to 31_11zon.pdf8 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( UPTO 13TH ).pdf3 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( ABOVE 14TH ).pdf3 May 2024
Certificates of CA (Form 3)File: 1C BEL AIR.pdf3 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( UPTO 13TH ).pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate T1C June 23.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engeeniring Certificate Tower 1C - Sep 23.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - T1C - PREMIERE - DEC 23.pdf24 Jan 2024
Certificates of CA (Form 3)File: Form 3_Bel Air_Dec 23.pdf16 Jan 2024
Certificates of CA (Form 3)File: 1C- BEL AIR.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Bel Air_FY 22-23.pdf4 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( UPTO 13TH ).pdf21 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( ABOVE 14TH ).pdf21 Oct 2023
Certificates of CA (Form 3)File: 1C-BEL AIR_compressed.pdf10 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Premiere- Bel-Air (up to 13th floor).pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Premiere - Bel-Air (14th foor and above).pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688- Premiere Bel-Air - T 1C - upto 13th floor.pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - Premiere Bel-Air - T 1C - 14th above.pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( UPTO 13TH ).pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( ABOVE 14TH ).pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( UPTO 13TH ).pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800005688 - BEL-AIR - ( ABOVE 14TH ).pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate T1C Dec 22 premiere.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE T1C March 23.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CERTIFICATE HUBTOWN Tower 1C.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Premiere C wing Form 2A.pdf30 Sep 2023
Certificates of CA (Form 3)File: 1C-BEL AIR.pdf25 Sep 2023
Certificates of CA (Form 3)File: 1C-BEL-AIR.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE T1C - sep 22.pdf29 May 2023
Certificates of CA (Form 3)File: FORM 3 -(HTL) 1C-BEL-AIR.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 BA (1).pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hubtown Bel Air Form 5 2019.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Premiere-Bel Air.pdf10 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Bel Air_Mar 22_compressed.pdf14 Jul 2022
Certificates of CA (Form 3)File: Premiere_Bel Air_Form 3_Mar 22_compressed.pdf14 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere Tower 1C upto 13th foloor_June 22.pdf12 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere Tower 1C upto 14th foloor_June 22.pdf12 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hubtown Sunmist B wingAndheri East61CompletedDec 2012Late, Sep 2014

How this compares with Mumbai Suburban

79%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Premiere Residences - Bel Air on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Four Bungalow, Versova6,700+ in Mumbai Suburban

2 kmHubtown Premiere ResidenCompleted 84Lapsed / revoked 53Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: Hubtown Limited

Hubtown Limited has 20 registrations on MahaRERA, including Hubtown Greenwoods A wing and Hubtown Greenwoods D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Hubtown Premiere Residences - Bel Air is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Premiere Residences - Bel Air?

The registered promoter entity is Hubtown Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Premiere Residences - Bel Air?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hubtown Premiere Residences - Bel Air?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Premiere Residences - Bel Air?

The professionals named in the filing: Architect: Citygold Management Services Pvt.ltd; Architect: AAKAR ARCHITECTS (Mr. UMESH PAWAR); Engineer: Rajivan Paramban; Chartered Accountant: JBTM & Associates LLP; Chartered Accountant: Sanket Shah; Chartered Accountant: MH Dalal & Association. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Premiere Residences - Bel Air?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Premiere Residences - Bel Air. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Premiere Residences - Bel Air to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.