Registration lapsed No litigation declared Residential / Group Housing project

Hubtown Countrywoods Building 4

By Hubtown Limited

RG-MH-10742 · RERA P52100002783 · Last updated on MahaRERA portal: 4 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 25%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Hubtown Countrywoods Building 4 is a Residential / Group Housing project by Hubtown Limited in Pune, Maharashtra, registered with MahaRERA as P52100002783 on 4 Aug 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 11 months from the original filing.

At a glance

Project

  • NameHubtown Countrywoods Building 4
  • TypeResidential / Group Housing
  • Location
    • katraj Kondhwa Road
    • Tilekar Nagar Kondhwa Budruk
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002783
  • ReraGenie IDRG-MH-10742

Builder

  • NameHubtown Limited
  • Entity typeCompany
  • CINL45200MH1989PLC050688
  • GSTIN27AAACA6101D1ZE
  • Managing DirectorVyomesh M Shah
  • DirectorsAbhijeet B Datta, Priti Kamlesh Shah, Sunil Chandrakant Shah, Ketki Rajat Shah, Kartik Shantilal Ruparel
  • Other registrations19 more →
  • Completed11 of 20
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

28 months past promisethis monthRegisteredAug 2017First promiseJul 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Jul 2023)
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hubtown Countrywoods Building 4NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 25%.

Hubtown Countrywoods Building 4: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered14
Open Space16

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area467 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI2868.03
Proposed, not sanctioned2,868 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC Andheri East Mumbai

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCitygold Management Services Private Limited
ArchitectMr.Swapnil J Deshpande
EngineerRajeevan Paramban
EngineerRajivan Paramban
Chartered AccountantJBTM AND ASSOCIATES LLP
Chartered AccountantSanket Shah
Chartered AccountantLJ Kothari & Company
Chartered AccountantSanket R. Shah & Associates
PartnerRole in project
Hubtown Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018279Jul 2023 → Jun 2024

Reason as filed by the promoterAwaiting for OC

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Oct 2024

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: B4-Building society formation certificate.pdf4 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form-4- Arch certificate - Hubtown country Wood - Bldg No ‘4’ (1).pdf8 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B4 Building OC.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I- Country Woods B4_June 24.pdf31 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Countrywood Engineers Certificate Jun 24.pdf29 Jul 2024
Certificates of CA (Form 3)File: Hubtown Countrywood Bldg_Form III_Jun-24_compressed.pdf29 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate - March 24.pdf16 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P52100002783 - KONDHWA.pdf9 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE - Countrywood.pdf9 May 2024
Certificates of CA (Form 3)File: Form 3-Mar 24_Countrywoods B4.pdf19 Apr 2024
Certificates of CA (Form 5)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1).pdf7 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P52100002783 - KONDHWA (4).pdf17 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering certificate - Dec 23 - Countrywood.pdf17 Jan 2024
Certificates of CA (Form 3)File: AJD_Form 3_Dec 23.pdf17 Jan 2024
Declaration in FORM BFile: Form B_Countrywoods.pdf27 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure_Countrywoods.pdf27 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate countrywood - Sep 23.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - bldg 04 - Mar 21.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - bldg 04 - June 21.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE BLDG NO 04_Dec 21.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Build 4 - march 22.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Build 4 - Jun 22.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE B-4 March 23 (3).pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Build No 4 - Jun 23.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CERTIFICATE ACKRUTI JAY DEVELOPERS 01.pdf19 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kondwa - Bldg 4 - P52100002783.pdf18 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P52100002783 - KONDHWA (1).pdf18 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P52100002783 - KONDHWA (2).pdf18 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Countrywood B-4 Form 2A.pdf18 Dec 2023
Certificates of CA (Form 3)File: FORM III - COUNTRYWOODS BUILDING 4 HAVING (30TH SEP 2023) (1).pdf18 Dec 2023
Certificates of CA (Form 5)File: FORM -5 B4.pdf18 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM -5 B4.pdf18 Dec 2023
Certificates of CA (Form 3)File: Hubtown Countrywoods Building 4_compressed.pdf27 Sep 2023
Certificates of CA (Form 3)File: Form 3_June 23_Countrywoods B4 (1).pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE B4 - March 20.pdf2 Feb 2023
Certificates of CA (Form 3)File: CountrywoodsB4_CA Form 3_Dec 22.pdf25 Jan 2023
Certificates of CA (Form 3)File: RERA Form III Bldg No 04 AJD.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form5-B4 (1).pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Countrywoods B4_Form V_FY 21-22.pdf10 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kondwa- Bldg 4.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: B4_18-19.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Countrywoods_B4_Form-V_Mar 21.pdf9 Jan 2023
Certificates of CA (Form 5)File: B4 (1).pdf6 Dec 2022
Certificates of CA (Form 3)File: RERA Form III B4_compressed.pdf26 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Countrywoods B4_June 22.pdf12 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Build 4 - Jun 22_compressed.pdf12 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Build 4 - march 22_compressed.pdf16 Apr 2022
Certificates of CA (Form 3)File: Form III (Mar 22) - Countrywoods (Bldg 4)_compressed.pdf16 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kondwa Bldg 4.pdf9 Apr 2022
Certificates of CA (Form 3)File: Form III B4 (1)_compressed.pdf21 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KONDHWA BLDG 4_compressed.pdf12 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 29092021 KONDWA REVISED ARCH CERTIFICATE BLDG NO 4 (1).pdf19 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - bldg 04 - 310321_compressed.pdf19 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - bldg 04 - 300621_compressed.pdf19 Nov 2021
Certificates of CA (Form 3)File: CA Form III_Bldg 4_Countrywoods_Sept 21.pdf7 Oct 2021
Certificates of CA (Form 5)File: Countrywoods_B4_Form-V_Mar 21.pdf30 Sep 2021
Certificates of CA (Form 3)File: Form III (March 20) - Countrywoods (Bldg 4) - 010321.pdf2 Mar 2021
Details of Restarting of Construction work post lockdownFile: Countrywoods B4.pdf31 Oct 2020
Certificates of CA (Form 5)File: Building 4.pdf27 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COUNTRYWOOD BLDG NO4 RERA UPDATEJANMAR2019.pdf7 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COUNTRYWOOD BLDG NO4 RERA UPDATEOCTDEC2018.pdf22 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BUILDING 4 - KONDWA.pdf19 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Countrywood Bldg no 4.pdf19 Dec 2018
Certificates of CA (Form 3)File: countrywood bldg 4 1MB.pdf19 Dec 2018
Certificates of CA (Form 5)File: Countrywoods Building No 4.pdf19 Dec 2018
Details of encumbrancesFile: Encumbrance Countrywoods .pdf19 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BUILDING 4 - KONDWA.pdf31 Mar 2018
Proforma of Allotment letterFile: Countrywoods RERA Agrm.pdf15 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 4.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Countrywoods Bulid 4.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate BLDG NO 4S.pdf26 Jul 2017
Building plan approvalFile: CC Countrywoods New.pdf25 Jul 2017
Building Plan Approval (IOD)File: CC Countrywoods New.pdf25 Jul 2017
Declaration in FORM BFile: Form B Cwds Bldg 4.pdf25 Jul 2017
Layout approvalFile: Layout Countrywoods.pdf22 Jul 2017
PAN CardFile: PAN Card Jay Developers.pdf22 Jul 2017
Copy of the legal title reportFile: Title Certificate Countrywoods New.pdf22 Jul 2017
Details of encumbrancesFile: Encumbrance certificate Cwds Bldg 4.pdf22 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Countrywoods.pdf22 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Countrywoods New.pdf22 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 11 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Countrywoods Building 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tilekar Nagar Kondhwa Budruk13,700+ in Pune

2 kmHubtown Countrywoods BuiCompleted 66Lapsed / revoked 38Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: Hubtown Limited

Hubtown Limited has 20 registrations on MahaRERA, including Hubtown Greenwoods A wing and Hubtown Greenwoods D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Hubtown Countrywoods Building 4 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Hubtown Countrywoods Building 4 is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Countrywoods Building 4?

The registered promoter entity is Hubtown Limited, a company as per the filing. Its CIN L45200MH1989PLC050688 and GSTIN 27AAACA6101D1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Countrywoods Building 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hubtown Countrywoods Building 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Countrywoods Building 4?

The professionals named in the filing: Architect: Citygold Management Services Private Limited; Architect: Mr.Swapnil J Deshpande; Engineer: Rajeevan Paramban; Engineer: Rajivan Paramban; Chartered Accountant: JBTM AND ASSOCIATES LLP; Chartered Accountant: Sanket Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Countrywoods Building 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Countrywoods Building 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Countrywoods Building 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.