Registered No litigation declared Residential / Group Housing project

Holi Complex

By Rakhumai Developers

RG-MH-28552 · RERA P99000026548 · Last updated on MahaRERA portal: 10 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 30 months from the original
25 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 60%
38 of 86Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

Holi Complex is a Residential / Group Housing project by Rakhumai Developers in Palghar, Maharashtra, registered with MahaRERA as P99000026548 on 2 Oct 2020. Possession is promised by 30 May 2027. The completion date has moved by 30 months from the original filing. 48 of the 86 units on this registration are recorded sold or booked, and 25 of 66 construction stages are filed complete.

At a glance

Project

  • NameHoli Complex
  • TypeResidential / Group Housing
  • Location
    • Umelman
    • Vasai Road West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000026548
  • ReraGenie IDRG-MH-28552

Builder

  • NameRakhumai Developers
  • Entity typePartnership
  • PartnersRakesh Shantaram Gharat, Sandip Pandurang Gharat, Bhuleshwar Keshav Gharat
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredOct 2020First promiseNov 2024Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Oct 2020
  • Promised completion30 May 2027
  • Revised completionRevised to 30 May 2027 (originally 15 Nov 2024)
  • Buildings6 building records
  • Documents filed102 files

Current status

56%48 of 86 units booked
86.3%Work done, per cost certificate

Figures as on 10 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO -1, A WingNA7731031
BLDG NO 1 Wing BNA7731031
BLDG 01 WING CNA77707
BLDG NO 01 WING DNA22202
BLDG NO 02NA7715015
office spaceNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 10 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 60%.

BLDG NO -1, A Wing64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 1 Wing B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG 01 WING C47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 01 WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 0264%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
office space0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Open Space28
BuildingOpen SpaceTotal
BLDG NO -1, A Wing1212
BLDG NO 1 Wing B1212
BLDG 01 WING C11
BLDG NO 01 WING D11
BLDG NO 0211
office space11

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026
LandownerVillageDistrict
Dinkar GharatVasai-Virar City (M Corp)Palghar
Rajesh GharatVasai-Virar City (M Corp)Palghar
HIRABHAI GHARATVasai-Virar City (M Corp)Palghar
RAKESH SHANTARAM GHARATVasai-Virar City (M Corp)Palghar
SARITA MHATREVasai-Virar City (M Corp)Palghar
MEENA MHATREVasai-Virar City (M Corp)Palghar
SANDIP GHARATVasai-Virar City (M Corp)Palghar
GHARAT GOVINDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI1625.66
Proposed, not sanctioned826 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManickpur, Vasai West
Estimated costRs 19.16 cr
Cost incurredRs 16.54 cr
Work done86.32%
BuildingWingEstimatedIncurred
BLDG NO -1, A WingNARs 7.34 crRs 7.12 cr
BLDG NO 1 Wing BNARs 7.34 crRs 7.12 cr
BLDG NO 02NARs 2.01 crRs 1.55 cr
-NARs 1.18 cr-
BLDG 01 WING CNARs 1.01 crRs 75.61 lakh
BLDG NO 01 WING DNARs 28.39 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Kekre
EngineerS.S & ASSOCIATES
Chartered AccountantS B JAIN & ASSOCIATES
Chartered AccountantMANISH SHINDE & ASSOCIATES
PartnerRole in project
Rakhumai Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000025640Nov 2024 → Dec 2025

Reason as filed by the promoterAttached reason for extension in below attachment

EA05022619735Nov 2024 → May 2027

Reason as filed by the promoterLOW RESPONCE TO SALE . AND IN DETAIL INFORMATION AS ATTACHED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 May 2027

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf10 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf10 Sep 2026
Withdrawal Update Form 3File: CA CERTIFICATE 310326 holi.pdf10 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf10 Sep 2026
Form 1File: form1 3006.pdf4 Feb 2026
Form 2File: form2 3006.pdf4 Feb 2026
Form 3File: HOLI FORM 3 jUN 25 .pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 3009.pdf4 Feb 2026
Form 1File: form 1 3009.pdf4 Feb 2026
Form 2File: form 2 3009.pdf4 Feb 2026
Form 3File: form1 3009.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 3009.pdf4 Feb 2026
Form 1File: form 1 3112.pdf4 Feb 2026
Form 2File: form2 3112.pdf4 Feb 2026
Form 3File: HOLI FORM 3 DEC 25.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 311225.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: QA2425.pdf4 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 HOLI 2425.pdf4 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 24-03-2025.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 F_compressed (1).pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 25-03-2025.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HOLI COMPLEX FF Final Final.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200334893844_For_Asset_Based_Search_09_01_2025_16_45_53_144 - Holi.pd9 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate Final FF .pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2a (1).pdf9 Jan 2025
Declaration in FORM BFile: form B SCAN F.pdf2 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: bank decleration new.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3_compressed.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3_compressed.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf31 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06-07-2020 RAKUMAI DEVELOPERS HOLI COMPLEX (1).pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (1) Signed F.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC NEW Rakhumai Holi II - Building 2_compressed.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 06-04-2024.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 06-01-2023.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 06-07-2020.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06-01-2023 RAKUMAI DEVELOPERS HOLI COMPLEX.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06-07-2020 RAKUMAI DEVELOPERS HOLI COMPLEX.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SCAN_20241205_175820176.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SCAN_20241205_180001546.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SCAN_20241205_180207157.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 31-03-2024.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: frm -1 05-7-22.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 10-1-22.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 (10-721)_compressed.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 ( 09-4-2021_compressed.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: frm -1 07-10-22.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 07-1-21.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_compressed (2).pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 7-10-22.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 05-07-2022.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_compressed.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 10-1-22.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 10-7-21.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 09-04-2021.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 10-10-20.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_compressed (1).pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 (07-1-21)-compressed.pdf2 Dec 2024

How this compares with Palghar

56%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 30 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Holi Complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai Road West3,200+ in Palghar

2 kmHoli ComplexCompleted 41Lapsed / revoked 26Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: Rakhumai Developers

Rakhumai Developers has 4 registrations on MahaRERA, including Aditi Empire and Aditi Empire - C Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Holi Complex is delayed beyond 30 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Holi Complex?

The registered promoter entity is Rakhumai Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Holi Complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Holi Complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Holi Complex?

The professionals named in the filing: Architect: Umesh Kekre; Engineer: S.S & ASSOCIATES; Chartered Accountant: S B JAIN & ASSOCIATES; Chartered Accountant: MANISH SHINDE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Holi Complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Holi Complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Holi Complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.