Home / Browse projects / Aurangabad, Maharashtra / Hira Park
Hira Park
By Pandharinath Thamaji Gunjale
RG-MH-73266 · RERA P51500028018 · Last updated on MahaRERA portal: 11 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 29 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Hira Park is a Residential / Group Housing project by Pandharinath Thamaji Gunjale in Aurangabad, Maharashtra, registered with MahaRERA as P51500028018 on 25 Jan 2021. Possession is promised by 30 Nov 2026. The completion date has moved by 29 months from the original filing. 11 of the 16 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameHira Park
- TypeResidential / Group Housing
- Location
- Harsool
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500028018
- ReraGenie IDRG-MH-73266
Builder
- NamePandharinath Thamaji Gunjale
- Entity typeIndividual
- GSTIN27BOWPG1177B1ZV
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jan 2021
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Jun 2024)
- Buildings2 building records
- Documents filed182 files
Current status
Figures as on 11 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A type building | NA | 3 | 3 | 8 | 0 | 8 |
| B type building | NA | 3 | 0 | 8 | 0 | 8 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
A type building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B type building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A type building | NA | Rs 1.65 cr | Rs 1.65 cr |
| B type building | NA | Rs 1.65 cr | Rs 1.65 cr |
| - | NA | Rs 25.00 lakh | Rs 25.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amrish Joshi |
| Architect | AKMAL KHAN |
| Engineer | A S Patil |
| Engineer | AKMAL KHAN |
| Chartered Accountant | RV Khandelwal & Co |
| Chartered Accountant | priya yashodeep bafna |
| Partner | Role in project |
|---|---|
| Pandharinath Thamaji Gunjale | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe previously submitted our extension request through the earlier portal. Since then, we are pleased to share that we have successfully received our Building Completion Certificate (BCC). However, to ensure everything aligns perfectly with the standard legal procedures, we understand that a formal extension is still necessary. Therefore, we are resubmitting this application to keep our records fully updated and compliant.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jan 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jan 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Nov 2026
Documents filed182
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 182 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: FORM I Q320260409110505.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: FORM I Q420260409110505 (1).pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2 Q320260409114528.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3_Q1_FY2627.pdf | 11 Sep 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 182 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Hira Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Harsool1,400+ in Aurangabad
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: Pandharinath Thamaji Gunjale
Pandharinath Thamaji Gunjale has 1 registration on MahaRERA, including Hira Park. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if Hira Park is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Hira Park?
The registered promoter entity is Pandharinath Thamaji Gunjale, an individual as per the filing. Its GSTIN 27BOWPG1177B1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Hira Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Hira Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Hira Park?
The professionals named in the filing: Architect: Amrish Joshi; Architect: AKMAL KHAN; Engineer: A S Patil; Engineer: AKMAL KHAN; Chartered Accountant: RV Khandelwal & Co; Chartered Accountant: priya yashodeep bafna. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Hira Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback