HILL VIEW
RG-MH-55718 · RERA P52000008581 · Last updated on MahaRERA portal: 6 Sep 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 11 complaints at MahaRERA
- Completion date moved by 96 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HILL VIEW is a Residential / Group Housing project by HDG ENTERPRISES PVT LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000008581 on 19 Aug 2017. Possession is promised by 30 Dec 2027. The completion date has moved by 96 months from the original filing. 11 complaints are on record with the regulator.
At a glance
Project
- NameHILL VIEW
- TypeResidential / Group Housing
- Location
- Neral
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000008581
- ReraGenie IDRG-MH-55718
Builder
- NameHDG ENTERPRISES PVT LTD
- Entity typeCompany
- Managing DirectorsHIRENGIRI DHARAMGIRI GOSWAMI, HEMINA HIRENGIRI GOSWAMI, GAURI DHARAMGIRI GOSWAMI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2019)
- Buildings4 building records
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1- Wing 1 and Wing 2 | NA | 5 | 0 | 0 | 0 | 0 |
| Building 2- Wing 1, 2 and 3 | NA | 5 | 0 | 0 | 0 | 0 |
| NA | NA | 0 | 0 | 0 | 0 | 0 |
| NA | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 6 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 90%.
Building 1- Wing 1 and Wing 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Building 2- Wing 1, 2 and 394%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
NA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Building 1- Wing 1 and Wing 2 | 20 | 20 |
| Building 2- Wing 1, 2 and 3 | 10 | 10 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Guruprasad V Sinkar |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Vikas Abhang & Associates |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Partner | Role in project |
|---|---|
| HDG ENTERPRISES PVT LTD | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and liquidity crunch in the market. We are on the verge of completing the construction work and are hopeful that once we receive project extension we shall obtain Occupancy Certificate from the Competent Authority and complete the project in all aspects.
Reason as filed by the promoterwe are unable to complete construction work owing to lack of labour, Shortage of Raw Material and, GST implementation followed by demonetization which are beyond the control of the promoter.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 51.16% allottees for purpose of extension of RERA registration period of the said project
Reason as filed by the promoterWe are writing to formally request an extension to the project completion timeline. The recent increase in the Floor Space Index (FSI) has led to a substantial expansion of the project's scope. To ensure that we continue to uphold the highest standards of quality and deliverables, additional time is essential. We are committed to completing the project efficiently and effectively, and we believe that this extension will enable us to meet all expectations without compromising on quality.
Complaints filed with MahaRERA11
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000210234 | PKH VENTURES LIMITED | HDG ENTERPRISES PRIVATE LIMITED | 03/03/2022 |
| CC006000000408106 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408107 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408287 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408300 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408301 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408302 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408303 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408305 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408307 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 04/12/2023 |
| CC006000000408308 | PRAVIN AGARWAL | HDG Enterprises Private Limited | 05/12/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Hill View - HDG Enterprises as on March 2025.pdf | 6 Sep 2025 |
| Form 2File: Form 2 - Hill View - HDG Enterprises as on March 2025.pdf | 6 Sep 2025 |
| Form 3File: Form 3 Hill View - HDG Enterprises as on March 2025.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Hill View - HDG Enterprises March 2025.pdf | 6 Sep 2025 |
| Disclosure of sold/ booked inventoryFile: HILL VIEW CIRCULAR 29 ON LETTER HEAD 25.pdf | 27 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf | 14 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-24.pdf | 14 Jun 2025 |
| Declaration in FORM BFile: Form B.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Jun 2023.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Sep 2023.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Dec 23.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Hdg form-3 39-june-2023_compressed.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: March 2024.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Sep-2024.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Dec 2024.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: March 2025.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 25.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 24.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 24.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 24.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 24.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 23.pdf | 12 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 23.pdf | 12 Jun 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC_compressed.pdf | 12 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 12 Jun 2025 |
| Other - TechnicalFile: PERT Chart.pdf | 12 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A PDF.pdf | 12 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 12 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 12 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Revised Form 1 23 3 2025 (1) (3).pdf | 4 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on March 2021.pdf | 21 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on March 2022.pdf | 21 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on June 2022.pdf | 21 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on March 2023.pdf | 21 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 19-20.pdf | 21 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 21 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 as on 31-03-2021_compressed.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 as on 31-03-2022_compressed.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 as on 30-06-2022_compressed.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 as on 31-03-2023_compressed.pdf | 21 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: 15 june 23 circulation 29 on letter head by HDG sold unsold (1).pdf | 16 Jun 2023 |
| Declaration about Commencement CertificateFile: form D on letter head by HDG.pdf | 14 Jun 2023 |
| Declaration in FORM BFile: Hill view affidavit Scan Jun 02, 2023.pdf | 14 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc certificate Jun 09 2023_organized.pdf | 14 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: latest circulation 29 on letter head by HDG.pdf | 14 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: circulation 29 on letter head by HDG sold unsold.pdf | 14 Jun 2023 |
| Certificates of CA (Form 5)File: form 5 aug 17 to march 18 CA report.pdf | 14 Jun 2023 |
| Certificates of CA (Form 5)File: form 5 aug 17 to march 18 CA report.pdf | 14 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 april 18 to march 19 CA report.pdf | 14 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 april 19 to march 20 ca report.pdf | 14 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 april 20 to march 21 CA report.pdf | 14 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: report 1 april 21 to 31 march 22 Ca reports.pdf | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Hill View as on March 2022.pdf | 3 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Hill View as on June 2022.pdf | 3 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3- Hill View as on March 2022.pdf | 3 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3- Hilll View as on June 2022.pdf | 3 Dec 2022 |
| CERSAI detailsFile: Hill View (Re-Generated).pdf | 26 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hill View- Form 2 as on March 2021.pdf | 15 Nov 2022 |
| Certificates of CA (Form 3)File: Form 3 Certificate 389.pdf | 15 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate as on 2021-22_compressed.pdf | 15 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hill View Mar 2020.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3 Hill View Mar 2020.pdf | 21 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Hill View FY 20-21.pdf | 9 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Hill View.pdf | 18 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Hill View FY 19-20.pdf | 16 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Final HDG letter head signed for new circular_compressed.pdf | 11 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hill View.pdf | 26 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3 Hill View Start.pdf | 26 Feb 2020 |
| Certificates of CA (Form 3)File: FORM 3 Hill View.pdf | 26 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Hill View_compressed.pdf | 24 Dec 2019 |
| Certificates of CA (Form 5)File: Form 5 Hill View_compressed.pdf | 14 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: hdg form 2 updated.pdf | 9 Mar 2019 |
| Certificates of CA (Form 3)File: Form 3 Compressed.pdf | 9 Mar 2019 |
| Certificates of CA (Form 5)File: Form 5 - HDG(17-18).pdf | 3 Jan 2019 |
| Building plan approvalFile: CC by ZP Order Hill View Neral.pdf | 9 Aug 2017 |
| Layout approvalFile: Copy of Layout Approval Plan HDG.pdf | 9 Aug 2017 |
| PAN CardFile: Pan card.pdf | 9 Aug 2017 |
| Copy of the legal title reportFile: legal title report.pdf | 9 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HILL VIEW on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Neral5,900+ in Raigarh
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: HDG ENTERPRISES PVT LTD
HDG ENTERPRISES PVT LTD has 1 registration on MahaRERA, including HILL VIEW. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if HILL VIEW is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HILL VIEW?
The registered promoter entity is HDG ENTERPRISES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HILL VIEW?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HILL VIEW?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HILL VIEW?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HILL VIEW?
The professionals named in the filing: Architect: Guruprasad V Sinkar; Engineer: SK Consultants & Engineers; Chartered Accountant: Vikas Abhang & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HILL VIEW?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback