ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Hill Star

Registered No litigation declared Others project

Hill Star

By Right Channel Buildcon LLP

RG-MH-38308 · RERA P51800048810 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 30 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

Hill Star is a Others project by Right Channel Buildcon LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048810 on 19 Jan 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 30 months from the original filing. 18 of the 20 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameHill Star
  • TypeOthers
  • Location
    • Kurar Village
    • Malad East
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048810
  • ReraGenie IDRG-MH-38308

Builder

  • NameRight Channel Buildcon LLP
  • Entity typePartnership
  • PartnerNilesh Chimanlal Soni

Key dates

this monthRegisteredJan 2023First promiseDec 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jan 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed131 files

Current status

90%18 of 20 units booked
86.9%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hill StarNA161620020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Hill Star: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area493 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Dec 2025
LandownerVillageDistrict
Malad Hill Star Co-operative Housing Society Ltd.KurarMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1494.27
Proposed, not sanctioned1,494 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 to 5, New Gitanjali Society, Raheja Township, Upper Govind Nagar, Malad East, Mumbai - 400
Estimated costRs 7.91 cr
Cost incurredRs 6.87 cr
Work done86.87%
BuildingWingEstimatedIncurred
Hill StarNARs 7.91 crRs 6.87 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPlanwell Architects
Architectsai
EngineerSandeep Namdeo Sekhar
EngineerUniSteps Consulting Pvt Ltd
Chartered AccountantG D P & Associates
Chartered AccountantGupta & Jain Chartered Accountants
Chartered AccountantRAGHAV MANDHANA & ASSOCIATEs
Chartered AccountantMALLAWAT & ASSOCIATES
PartnerRole in project
Right Channel Buildcon LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025774Dec 2024 → Dec 2025

Reason as filed by the promoterDue to shortage of construction material specially RMC and Steel construction activity is running beyond scheduled time So; to complete the building we may take another 9-12 months’ time period

EA23022619963Dec 2024 → Jun 2027

Reason as filed by the promoterWe have already completed entire RCC structure, Internal & External Plaster, Floorings within flats, Doors & Windows, Sanitary & Electrical Fittings, Staircases, Lifts Wells and Lobbies, Overhead and Underground Water tank, External plumbing i.e. most of the finishing work of the building has been completed but due to road construction work undergoing nearby, the site was affected for 3 to 4 months due to which, the work could not got completed as per timelines. Though Installations of lifts, firefighting equipment’s work are completed to about 95%. So, to complete the remaining work of buildi

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: From 1 .pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2 June 2026 .pdf18 Aug 2026
Withdrawal Update Form 3File: Hill Star - Form 3 (June-2026)_Signed.pdf18 Aug 2026
Form 5 (FY 2025-2026)File: RCBL From- 5 FY 2025-26 .pdf12 Aug 2026
Withdrawal Update Form 1File: Hill star Architect Certificates (From-1) .pdf8 Aug 2026
Withdrawal Update Form 2File: Hill Star Form 2 March 2026.pdf8 Aug 2026
Withdrawal Update Form 3File: Hill Star - Form 3 (March-2026) (1).pdf8 Aug 2026
Withdrawal Update Form 1File: Hill star Architect Certificates (From-1) .pdf17 Feb 2026
Withdrawal Update Form 1File: Hill star Architect Certificates (From-1) .pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec-25.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec-25.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 Compressed.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 Compressed.pdf17 Feb 2026
Form 1File: Form 1 Mar-23.pdf12 Jan 2026
Form 2File: Form 2 Mar-23.pdf12 Jan 2026
Form 3File: Form 3 Mar-23.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: March 23.pdf12 Jan 2026
Form 1File: Form 1 Jun-23.pdf12 Jan 2026
Form 2File: Form 2 Jun-23.pdf12 Jan 2026
Form 3File: Form 3 Jun-23.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Jun-23.pdf12 Jan 2026
Form 1File: Form 1 Sep-23.pdf12 Jan 2026
Form 2File: Form 2 Sep-23.pdf12 Jan 2026
Form 3File: Form 3 Sep-23.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Sep-23.pdf12 Jan 2026
Form 1File: Form 1 Dec-23.pdf12 Jan 2026
Form 2File: Form 2 Dec-23.pdf12 Jan 2026
Form 3File: Form 3 Dec-23.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Dec-23.pdf12 Jan 2026
Form 1File: Form 1 Mar-24.pdf12 Jan 2026
Form 2File: Form 2 Mar-24.pdf12 Jan 2026
Form 3File: Form 3 Mar-24.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Mar-24.pdf12 Jan 2026
Form 1File: Form 1 Jun-24.pdf12 Jan 2026
Form 2File: Form 2 Jun-24.pdf12 Jan 2026
Form 3File: Form 3 Jun-24.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: June 24.pdf12 Jan 2026
Form 1File: Form 1 Sep-24.pdf12 Jan 2026
Form 2File: Form 2 Sep-24.pdf12 Jan 2026
Form 3File: Form 3 Sep-24.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Sep-24.pdf12 Jan 2026
Form 1File: Form 1 Dec-24.pdf12 Jan 2026
Form 2File: Form 2 Dec-24.pdf12 Jan 2026
Form 3File: Form 3 Dec-24.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Dec-24.pdf12 Jan 2026
Form 1File: Form 1 Mar-25.pdf12 Jan 2026
Form 2File: Form 2 Mar-25.pdf12 Jan 2026
Form 3File: Form 3 Mar-25.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Mar-25.pdf12 Jan 2026
Form 1File: Form 1 Jun-25.pdf12 Jan 2026
Form 2File: Form 2 Jun-25.pdf12 Jan 2026
Form 3File: Form 3 Jun-25.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Jun-25.pdf12 Jan 2026
Form 1File: Form 1 Sep-25.pdf12 Jan 2026
Form 2File: Form 2 Sep-25.pdf12 Jan 2026
Form 3File: Form 3 Sep-25.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Sep-25.pdf12 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A Mar-23.pdf12 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A Mar-24.pdf12 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Mar-25.pdf12 Jan 2026
Form 2A (FY 2025-2026)File: Form 2A Sep-25.pdf12 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 FY 2022-23.pdf12 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf12 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf12 Jan 2026
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA ( From 5 ) .pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 - Hill Star .pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Hill Star .pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - Hill Star .pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - Hill Star.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - Hill Star.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 - Hill Star.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - Hill Star.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - Hill Star.pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf17 Mar 2025

How this compares with Mumbai Suburban

90%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 30 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hill Star on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad East6,700+ in Mumbai Suburban

Builder: Right Channel Buildcon LLP

Right Channel Buildcon LLP has 1 registration on MahaRERA, including Hill Star. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Hill Star is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hill Star?

The registered promoter entity is Right Channel Buildcon LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hill Star?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hill Star?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hill Star?

The professionals named in the filing: Architect: Planwell Architects; Architect: sai; Engineer: Sandeep Namdeo Sekhar; Engineer: UniSteps Consulting Pvt Ltd; Chartered Accountant: G D P & Associates; Chartered Accountant: Gupta & Jain Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hill Star?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hill Star. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hill Star to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.