Home / Browse projects / Pune, Maharashtra / Hill Shire - Phase 1

Registration lapsed No litigation declared Residential / Group Housing project

Hill Shire - Phase 1

By Guardian Promoters & Developers Private Limited

RG-MH-09861 · RERA P52100001572 · Last updated on MahaRERA portal: 23 Mar 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
50 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Hill Shire - Phase 1 is a Residential / Group Housing project by Guardian Promoters & Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100001572 on 29 Jul 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 30 months from the original filing.

At a glance

Project

  • NameHill Shire - Phase 1
  • TypeResidential / Group Housing
  • Location
    • Kesnand Road
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001572
  • ReraGenie IDRG-MH-09861

Builder

  • NameGuardian Promoters & Developers Private Limited
  • Entity typeCompany
  • Managing DirectorManish Murlidhar Sabade
  • DirectorManish Madhav Soman
  • Other registrations4 more →
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

52 months past promisethis monthRegisteredJul 2017First promiseDec 2019Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jul 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Dec 2019)
  • Buildings5 building records
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA140000
BNA140000
CNA140000
DNA140000
ENA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 23 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 90%.

A99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
D99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 23 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1464.0
Proposed, not sanctioned464 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBUSINESS SQUARE PLOT NO-57, MAYUR COLONY, NEXT TO JOG HIGH SCHOOL, KOTHRUD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
EngineerDelcon Consultants India Pvt. Ltd.
PartnerRole in project
Guardian Promoters & Developers Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005874Dec 2019 → Dec 2020

Reason as filed by the promoterDelay in sanction

EXT52100010453Dec 2019 → Jun 2022

Reason as filed by the promoterDue to Covid-19 and lockdown.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jan 2020

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: Application for RERA.pdf23 Mar 2023
Other - TechnicalFile: Application for RERA.pdf23 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Hillshire Phase 1 Form V RERA Annual Return FY 17-18.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hillshire Phase 1 Form V RERA Annual Return FY 18-19.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hillshire Phase 1 Form V RERA Annual Return FY 19-20.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hillshire Phase 1 Form V RERA Annual Return.pdf1 Nov 2021
Disclosure of sold/ booked inventoryFile: Hill Shire- Sold Disclosure.pdf4 Aug 2021
Declaration about Commencement CertificateFile: HS-Commencement Declaration.pdf2 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HS-Ph-1 Engineer-Jun-21.pdf2 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HS-Engineer Certificate-Ph-1-Dec-20.pdf27 Jul 2021
Form 2AFile: HS-Quality Assurance-Ph-1-Dec-20.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: HS-Quality Assurance-Ph-1-Dec-20.pdf27 Jul 2021
Layout approvalFile: Hill Shire.pdf2 Mar 2021
Building plan approvalFile: Hill Shire.pdf2 Mar 2021
Copy of Layout Approval (in case of layout)File: Hill Shire.pdf2 Mar 2021
Building Plan Approval (IOD)File: Hill Shire.pdf2 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HS-Architect Certificate-.pdf19 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HS-Engineer Certificate-Ph-1-Mar-20.pdf19 Sep 2020
Form 2AFile: HS-Quality Certificate-Ph-1-Mar-20.pdf19 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: Hill Shire commencement.pdf27 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HS-Arch-Ph-1.pdf17 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HS-EN-Ph-1.pdf17 Jan 2020
Form 2AFile: HS-QA-Ph-1.pdf17 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Hill Shire A,C,D E Completion Certificate.pdf16 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Hill Shire B Completion Certificate.pdf16 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HS-1 Architect Cetificate-Sept 19.pdf5 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HS-1 Engineer Cetificate-Sept 19.pdf2 Oct 2019
Form 2AFile: HS-1 Quality Assurance-Sept 19.pdf2 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HS-Ph-1 Archi.pdf12 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HS Ph-1 Engg.pdf12 Jul 2019
Form 2AFile: HS_Phase-1 QA.pdf1 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hill Shire Ph-1 Architech certificate Dec 2018.pdf14 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hill Shire Ph1 Engineer Certificate.pdf14 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Hill Shire Phase 1 Architect 050218.pdf24 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Hill Shire Phase 1 Architect 050218.pdf24 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Hill Shire Ph 1 Engineer 250118.pdf13 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Hill SHire Ph1 Architect 311017.pdf1 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Hill Shire Ph1 Engineer 311017.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hill Shire Phase 1 Architect Final.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hill Shire Phase 1 Engineer 1.pdf27 Jul 2017
Certificates of CA (Form 3)File: Hill Shire Phase 1 CA Final 1.pdf27 Jul 2017
Proforma of Allotment letterFile: Hill Shire Phase 1 Agreement Draft.pdf27 Jul 2017
Declaration in FORM BFile: Hill Shire phase 1 Form B.pdf25 Jul 2017
Proforma of Allotment letterFile: Allotment_Letter_ Draft OK.pdf24 Jul 2017
Building plan approvalFile: Lay Out - Hill Shire.pdf18 Jul 2017
Layout approvalFile: Lay Out - Hill Shire.pdf18 Jul 2017
PAN CardFile: PAN Card GPDPL.pdf18 Jul 2017
Copy of the legal title reportFile: Title Report.pdf18 Jul 2017
Details of encumbrancesFile: Letter of Encumbrance_Hill Shire.pdf18 Jul 2017
Copy of Layout Approval (in case of layout)File: Lay Out - Hill Shire.pdf18 Jul 2017
Building Plan Approval (IOD)File: Lay Out - Hill Shire.pdf18 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf18 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KanchangauriKanchan Lane Near Krishna Dining Hall Law college Road Pune-41100419CompletedApr 2014Late, Nov 2014
GaurishankarMayur Colony Kothrud Pune-41103810CompletedMar 2014Late, May 2014
AadityaShriram Society Warje Pune-41105212CompletedMar 2014Late, Jun 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 30 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hill Shire - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmHill Shire - Phase 1Completed 38Lapsed / revoked 21Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: Guardian Promoters & Developers Private Limited

Guardian Promoters & Developers Private Limited has 5 registrations on MahaRERA, including Hill Shire Phase-2 and Guardian Anantam. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Hill Shire - Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Hill Shire - Phase 1 is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hill Shire - Phase 1?

The registered promoter entity is Guardian Promoters & Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hill Shire - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hill Shire - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hill Shire - Phase 1?

The professionals named in the filing: Architect: Vikas Achalkar; Engineer: Delcon Consultants India Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hill Shire - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hill Shire - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hill Shire - Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.