ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / HI SPIRITS

Registration approved No litigation declared Mixed Development project

HI SPIRITS

By JOACHIM LOUIS PINTO AND PHILOMENA ARANHA

RG-KA-57572 · RERA PRM/KA/RERA/1257/334/PR/150423/005869 · Last updated on RERA Karnataka portal: 5 Apr 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Feb 2022Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 91 documents Report an error

HI SPIRITS is a Mixed Development project by JOACHIM LOUIS PINTO AND PHILOMENA ARANHA in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/150423/005869 on 15 Apr 2023. Possession is promised by 28 Feb 2022.

At a glance

Project

  • NameHI SPIRITS
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575002
  • Pincode575002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/150423/005869
  • ReraGenie IDRG-KA-57572

Builder

  • NameJOACHIM LOUIS PINTO AND PHILOMENA ARANHA
  • Entity typeProprietorship Firm
  • GSTIN29ACXPP4229MIZL
  • Authorized SignatoryJOACHIM LOUIS PINTO

Key dates

Registered
15 Apr 2023
Promised
28 Feb 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Apr 2023
  • Promised completion28 Feb 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HI SPIRITS-----8

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 5 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 5 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyYes-
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area559 sq m
Named landowners2
LandownerVillageDistrict
PHILOMENA ARANHA--
JOACHIM LOUIS PINTO--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.12 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 4.12 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAVEEN SALDANHA
EngineerVIMAL ANIL
Chartered AccountantRUDOLPH MARIAN CHARLES RODRIGUES

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed91

As listed on the registration, under the names the promoter filed them with; the newest 80 of 91 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/150423/005869 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
VILLAGE MAPFile: VILLAGE MAP UPDATED .jpeg5 Apr 2023
CDP MAPFile: CDP MAP UPDATED.jpeg5 Apr 2023
SANCTION PLANFile: PLAN 1.PDF5 Apr 2023
CARPET AREA CALCULATIONFile: carpet area calculation.pdf5 Apr 2023
CLARIFICATIONFile: CLARIFICATION.pdf5 Apr 2023
COMPLETION CERTIFICATEFile: CC.pdf5 Apr 2023
Proprietorship registration certificateFile: GST Certificate.pdf28 Mar 2023
FORM 1File: FORM reg 1.pdf28 Mar 2023
FORM 3File: Form 3.pdf28 Mar 2023
FORM 6File: form 6 CC.pdf28 Mar 2023
AFFIDAVIT EXISITING BANK ACCOUNTFile: AFFIDAVIT FOR EXISTING BANK.pdf28 Mar 2023
GUIDANCE VALUEFile: GUIDANCE VALUE NEW.pdf28 Mar 2023
SANCTION PLANFile: PLAN 1.PDF28 Mar 2023
CARPET AREA CALCULATIONFile: carpet area calculation.pdf28 Mar 2023
CDPFile: cdp map.jpeg28 Mar 2023
VILLAGE MAPFile: village map.jpeg28 Mar 2023
Certificate from Registered Engineer indicating the structural safety of the building.File: stability certificate.pdf28 Mar 2023
project specification by incorporating with the project name and address.File: Specification with project address and name.pdf28 Mar 2023
copy of fee receipt paid towards power supply NOC.File: mescom with reciept.pdf28 Mar 2023
correct scanned copy of section 3(1) notarized affidavit.File: NOTORIZED AFFIDAVIT.pdf28 Mar 2023
STP/Septic Tank, Soak pit and sewer line demarcation drawing.File: DRAINAGE DRAWING.pdf28 Mar 2023
INCOME TAX MEMOFile: INCOME TAX MEMO.pdf28 Mar 2023
ITRFile: ITR 2022.pdf28 Mar 2023
UNSOLD UNITSFile: UNSOLD UNITS.xlsx28 Mar 2023
CLARIFICATIONFile: clarification.pdf28 Mar 2023
RTC, survey 417/P3-
Mutation, survey 417/P3-
Encumbrance Certificate, survey 417/P3-
Conversion/Alienation Order, survey 417/P3-
Sale/Title/Gift Deed, survey 417/P3-
Khatha, survey 417/P3-
Registration CertificateFile: GST Certificate.pdf-
Certificate issued by CA Form 1File: form 1.pdf-
Certificate issued by Architect Form 2File: FORM 2.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non litigation affidavith.pdf-
Certificate from Chartered AccountFile: form 1.pdf-
Balance Sheet 2021 - 2022File: BS 2022.pdf-
Balance Sheet 2020 - 2021File: BS 2021.pdf-
Balance Sheet 2019 - 2020File: BS 2020.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL 2022.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PL 2021.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL 2020.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2020.pdf-
LICENSE WITH PLAN-
NOC MESCOM-
PLAN-
PLAN-
PLAN-
PLAN-
PLAN 1-
Specification-
PLAN2-
PLAN-
Legal Opinion -
single site-
conversion comm and residential-
AOS-
Allottment_compressed-
form B_compressed-
Notorized affidavit-
NOC MESCOM-
Unnamed document-
Unnamed document-
Fire NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep HI SPIRITS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmHI SPIRITSOther 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 72 registered projects within 2 km.

Builder: JOACHIM LOUIS PINTO AND PHILOMENA ARANHA

JOACHIM LOUIS PINTO AND PHILOMENA ARANHA has 1 registration on RERA Karnataka, including HI SPIRITS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if HI SPIRITS is delayed beyond 28 Feb 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of HI SPIRITS?

The registered promoter entity is JOACHIM LOUIS PINTO AND PHILOMENA ARANHA, a proprietorship firm as per the filing. Its GSTIN 29ACXPP4229MIZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in HI SPIRITS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at HI SPIRITS?

The professionals named in the filing: Architect: PRAVEEN SALDANHA; Engineer: VIMAL ANIL; Chartered Accountant: RUDOLPH MARIAN CHARLES RODRIGUES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HI SPIRITS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HI SPIRITS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HI SPIRITS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.