Home / Browse projects / Dakshina Kannada, Karnataka / Altitude
Altitude
By LAND TRADES BUILDERS & DEVELOPERS
RG-KA-75116 · RERA PRM/KA/RERA/1257/334/PR/291125/008291 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Altitude is a Residential/Group Housing project by LAND TRADES BUILDERS & DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/291125/008291 on 29 Nov 2025. Possession is promised by 31 Dec 2029. 13 of the 28 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameAltitude
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- 575002
- Pincode575002
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/291125/008291
- ReraGenie IDRG-KA-75116
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on29 Nov 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed203 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Altitude | - | - | - | 28 | 0 | 28 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 90%.
Building: 19% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 85% |
| Foundation footing work | 90% |
| Upto Plinth Level | 80% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 60% |
| RCC or MS Framed structure | 20% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Manjusha Shrinath Hebbar | - | - |
| Manjusha Shrinath Hebbar | - | - |
| Manjusha Shrinath Hebbar | - | - |
| K Shrinath Hebbar | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 60.64 cr | Rs 2.91 cr |
| On-site expenditure-Site Overhead | Rs 56.73 lakh | - |
| On-site expenditure-Consultants Fees | Rs 6.09 lakh | - |
Certifying professionals and partners5
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Saurabh Chatterjee |
| Engineer | Shantilal Hastimal Jain |
| Engineer | Gokulraj |
| Engineer | Anik K hegde |
| Chartered Accountant | Laxmisha Rao K |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed203
As listed on the registration, under the names the promoter filed them with; the newest 80 of 203 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/291125/008291 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Altitude Q2 26-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Altitude Q2 26-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Altitude Q2 26-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Notarized Non Litigation AffidavitFile: Non Litigation Affidavit Altitude.pdf | 13 Oct 2026 |
| sources of additional funds to complete the project and Supporting DocumentsFile: Sources Of Fund to Complte the Project.pdf | 13 Oct 2026 |
| all Modified Approved Building planFile: Modified Approved Building Plan Merged.pdf | 13 Oct 2026 |
| Approved Building plan order letterFile: Modified Approved Building Order Altitude.pdf | 13 Oct 2026 |
| sold and unsold units detais with signature.File: Altitude sold and Unsold Units Details Till Date.pdf | 13 Oct 2026 |
| engineer licence who has signed the engineer certifiacte and Revised Form 6File: Form 6 Altitude with Engineer Licence.pdf | 13 Oct 2026 |
| Structral Engineer Licence along with Renewed Stability CertificateFile: Strutral Engineer Certificate and Renewed Licence.pdf | 13 Oct 2026 |
| 2/3rd consent forms of 11 CustomerFile: 11 Conset Letter Merged_compressed.pdf | 13 Oct 2026 |
| Modified Site PlanFile: Approved Site Plan Altittude.pdf | 13 Oct 2026 |
| Mofified Basement and Lower Ground Floor PlanFile: Basement and Lower Ground Floor Altitude.pdf | 13 Oct 2026 |
| Modified Building ElevationFile: Building Elevation Plan.pdf | 13 Oct 2026 |
| Modified Floor PlanFile: Floor Plan Altitude.pdf | 13 Oct 2026 |
| Modified Upper Ground Floor PlanFile: Upper Ground Floor Altitude.pdf | 13 Oct 2026 |
| Terrace Floor PlanFile: Terrace Floor Plan.pdf | 13 Oct 2026 |
| Clarification on NOC and new land added and other PointsFile: Clarifications for Nocs and Other Points.pdf | 13 Oct 2026 |
| Fire Noc Uploaded Once againFile: Revised Fire NOC.pdf | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Altitude Form 4 Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Altitude Form 5 Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: ALTITUDE Form 6 Q126-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q1 2026-27 Fire and Safety | 14 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 25-26 Altitude Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Altitude Form 5 Q4 25-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Altitude Form 6 25-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 Q3 Altitude 25-26.pdf | 3 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q3 Altitude 25-26.pdf | 3 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Altitude Form 6 Q325-26.pdf | 3 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 3 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 3 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 3 Feb 2026 |
| Q3 2025-26 Fire and Safety | 3 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 3 Feb 2026 |
| structural stability certificate duly signed by structural engineer whose having valid structural enFile: Structural Stability Certificate Vimal Anil.pdf | 26 Nov 2025 |
| Certificate issued by local authorityFile: Certificate anil hegde issued by local authority.pdf | 26 Nov 2025 |
| PRM/KA/RERA/1257/334/PR/190823/002818 Anual Audit and quaterly report clarificationFile: Celena heights Reply.pdf | 21 Nov 2025 |
| bank affidavit in the prescribed formatFile: Bank Affidavit 1.pdf | 21 Nov 2025 |
| Bank 100%, account pass sheets or statements, the bank account name should be as per tFile: 6 Bank statements100.pdf | 21 Nov 2025 |
| Bank 70%, account pass sheets or statements, the bank account name should be as per tFile: 6 Bank statements70.pdf | 21 Nov 2025 |
| Bank 30%, account pass sheets or statements, the bank account name should be as per tFile: 6 Bank statements30.pdf | 21 Nov 2025 |
| sources of funds to complete the project? With supporting documentsFile: Sources of Fund to Complete the Project.pdf | 21 Nov 2025 |
| structural stability certificate duly signed by structural engineer whose having valid structural enFile: Revised structual Stability.pdf | 21 Nov 2025 |
| Letter annual audit report and quarterly report of previous projectsFile: 2 Letter on Anual Audit REPORT and Quaterly Report of Previous Project.pdf | 4 Nov 2025 |
| chartered accountant certificate (CA) in prescribed format form -01File: Form 1 CA Certificate.pdf | 4 Nov 2025 |
| Architect CertificateFile: Architect Certificate Altitude.pdf | 4 Nov 2025 |
| Engineer CertificateFile: Form no 3 Engineer.pdf | 4 Nov 2025 |
| Certified Cost by EngineerFile: Altitude costing for area purpose (1).pdf | 4 Nov 2025 |
| profit and loss account and balance sheet for the year 2024-25 CA certification with schedulesFile: 4 Letter on BS And P&L and Provisional BS 24-25.pdf | 4 Nov 2025 |
| BANK STATEMENT 100%File: 6 Bank statements-100%.pdf | 4 Nov 2025 |
| BANK STATEMENT 70%File: 6 Bank statements-70%.pdf | 4 Nov 2025 |
| BANK STATEMENT 30%File: 6 Bank statements-30%.pdf | 4 Nov 2025 |
| Bank AffidavitFile: Bank Affidavit 1.pdf | 4 Nov 2025 |
| Sources of fundFile: Sources of Fund to Complete the Project.pdf | 4 Nov 2025 |
| clearly visible, defect free EC from 1-4-2010 to till date continuous, single documentFile: EC.pdf | 4 Nov 2025 |
| JDA between promoter and current land ownerFile: GPA Altitude.pdf | 4 Nov 2025 |
| notarized affidavit regarding all pending or cleared litigations /non-litigationFile: Non ltitgation Affidavit 2.pdf | 4 Nov 2025 |
| Akharband for all snos.File: Akharband for all syno.pdf | 4 Nov 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Certified Sketch.pdf | 4 Nov 2025 |
| Location details of the projectFile: 2 Location details of the Project.pdf | 4 Nov 2025 |
| commencement certificateFile: Commencement certificate Affidavit_rotated.pdf | 4 Nov 2025 |
| Demarcation of proposed land in Approved Master plan Certified by the competent authority.File: Demacration of the LAND in Master Plan.pdf | 4 Nov 2025 |
| Demarcation of proposed land in original Village map certified by the competent authorityFile: Village MAP.pdf | 4 Nov 2025 |
| KSPCB NOCFile: 6 KSPCB NOC.pdf | 4 Nov 2025 |
| Details of facilities provided thereof including emergency servicesFile: Deatils on Emergency Services.pdf | 4 Nov 2025 |
| Details of facilities provided thereof including drinking water facilities,File: Drinking water facilities.pdf | 4 Nov 2025 |
Promoter's earlier projects16
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Mahalaxmi | MAHALAXMI, Survey No.R.S.No.679 -T.S. No. -520 (520/P8),R.S.No.679 -T.S. No. 520 (520/P1),R.S.No.688-B3-T.S. No. 530-B3 (530/B3P5) , R.S.No.679-T.S. No.520 (520/P9),"R.S.No.688-B3- T.S. No. 530-B3P4 ,R.S.No.688-B3- T.S. No 530-B3 (530-B3P1) ,R.S.No.679- T.S. No. 520/* (520/P),"R.S.No.679 -T.S. No.520 (520/P2) , Mangalore , Dakshina Kannada, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Pristine | Chilimbi, boloor Village Mangalore | Ongoing | May 2028 | Not due yet |
| Shivabagh | Kadri Shivabagh, Mangalore | Ongoing | Dec 2027 | Not due yet |
| Laxmi Govind | Laxmi Govind 87/1A1 , Kadri Kaibattal , Alvares Road , Mangalore , Dakshina Kannada, Karnataka | Ongoing | Apr 2027 | Not due yet |
| Altura | Bendorewell, Mangalore | Ongoing | Oct 2025 | Not delivered |
| SYNERGY | SYNERGY, Survey no. 46/1P2, Airport Road, Padav Village , Yeyyadi , Mangalore , Dakshina Kannada, Karnataka | Ongoing | Apr 2024 | Not delivered |
| Vikram Trade Centre | KRR Road Kodialbail mangalore | Completed | - | No date filed |
| Solitaire | Hathill, Chilimbi Mangalore | Completed | - | No date filed |
| Nakshatra | Gandhinagar Mangalore | Completed | - | No date filed |
| Milestone 25 | Balmatta Mangalore | Completed | - | No date filed |
| Lenhil Ferns | Near City hospital Kadri Mangalore | Completed | - | No date filed |
| Kamath Garden | Ullala Mangalore | Completed | - | No date filed |
| Indus | Near Arya Samaj Road, Mallikatte Kadri, Mangalore | Completed | - | No date filed |
| INSIGNIA | Valencia Church road, near valencia church valencia | Completed | - | No date filed |
| Emarald Bay | Surathkal Mangalore | Completed | - | No date filed |
| Anantessh | Carstreet Mangalore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep Altitude on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 67 registered projects within 2 km.
Shivabagh
Land Trades Builders and Developers
SMRITHI HEIGHTS
Nidhi Land Infrastructure Developers India
BLOOM NEXUS
PARADISE CITADEL PROJECTS
INLAND BUENOS AIRES
M/S IN-LAND BUILDERS
WALK IN NIRVANA
WALK IN BUILDERS AND DEVELOPERS
ROHAN GARDEN
PROPERTY REAL ESTATE & DEVELOPERS
See every Dakshina Kannada project, with the district possession charts
Builder: LAND TRADES BUILDERS & DEVELOPERS
LAND TRADES BUILDERS & DEVELOPERS has 3 registrations on RERA Karnataka, including Land Trades Durga Mahal and Expertise Enclave. Its filings declare 18 earlier projects, 11 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if Altitude is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Altitude?
The registered promoter entity is LAND TRADES BUILDERS & DEVELOPERS, a proprietorship as per the filing. Its GSTIN 29AAJPH6778H1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Altitude?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Altitude?
The professionals named in the filing: Architect: Saurabh Chatterjee; Engineer: Shantilal Hastimal Jain; Engineer: Gokulraj; Engineer: Anik K hegde; Chartered Accountant: Laxmisha Rao K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Altitude?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback