Home / Browse projects / Kolhapur, Maharashtra / HERITAGE ENTICE

Completed No litigation declared Residential / Group Housing project

HERITAGE ENTICE

By VARAD DEVELOPERS

RG-MH-16500 · RERA P53000026113 · Last updated on MahaRERA portal: 20 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

HERITAGE ENTICE is a Residential / Group Housing project by VARAD DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000026113 on 19 Aug 2020. The registration is recorded completed; possession was promised by 1 Aug 2024.

At a glance

Project

  • NameHERITAGE ENTICE
  • TypeResidential / Group Housing
  • Location
    • HIMMAT BAHADUR PARISAR
    • TARABAI PARK
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • RERA no.P53000026113
  • ReraGenie IDRG-MH-16500

Builder

  • NameVARAD DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAHFV1929J1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSANJAY CHANDRAKANT CHAVAN, PREETI SANJAY CHAVAN, VIBHAVARI CHANDRAKANT CHAVAN, YASH SANJAY CHAVAN, BHAGYASHREE VINAYKUMAR DESHPANDE, GOURI VINAYKUMAR DESHPANDE, AISHWARYA VINAYKUMAR DESHPANDE, RAJ SANJAY CHAVAN, VINAYKUMAR SUDHAKAR DESHPANDE
  • Other registrations13 more →
  • Completed4 of 14
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredAug 2020PromisedAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2020
  • Promised completion1 Aug 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA90000
A WINGNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes75%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered27
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
B WING17825
A WING10010

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,759 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5700.0
Proposed, not sanctioned5,700 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAYANTARA COMPLEX, E WARD, NAGALA PARK

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Kapdi
EngineerPrasad Kulkarni
Chartered AccountantSanjay Vhanbatte
PartnerRole in project
VARAD DEVELOPERS-

Litigation declared1

CaseCourtStatus
201790/2012/2012CIVIL COURT SENIOR DIVISION KOLHAPURARGUMENTS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Apr 2023

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HEritage Intice Completion Certificate.pdf20 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 varad.pdf20 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: HEritage Intice Declaration.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Heritage Entice A WING.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: Heritage Entice B WING.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: Clyde Home C.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: Clyde Home C 2.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Heritage Entice Form 5 HE 2022.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec Heritage Entice Form.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mar Heritage Entice Form.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mar Heritage Entice Form.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sep Heritage Entice.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ann Heritage Entice Form 21-22.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: HERITAGE E SOLD UNSOLD.pdf6 Oct 2022
Disclosure of sold/ booked inventoryFile: HERITGE E B WING SOLD UNSOLD.pdf6 Oct 2022
Disclosure of sold/ booked inventoryFile: A WING - Copy.pdf15 Jun 2022
Disclosure of sold/ booked inventoryFile: BWING - Copy.pdf15 Jun 2022
CERSAI detailsFile: HERITAGE CERSAI_Search_Report_200227471678_For_Asset_Based_Search_05_01_2022_17_27_30_419.5 Jan 2022
Disclosure of sold/ booked inventoryFile: HERITAGE A WING SOLD UNSOLD INV.pdf5 Jan 2022
Disclosure of sold/ booked inventoryFile: HERITAGE B WING SOLD UNSOLD INV.pdf5 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form - 5.pdf1 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form - 5.pdf1 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Decration About -Carad Developers.pdf29 Nov 2021
Declaration about Commencement CertificateFile: Decration of CC under circular 32.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate - 1.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate 2.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate 2.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate - 3.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate 4.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate 5.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate - 1.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate 2.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate - 3.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate 4.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: 2 Discolsure of Sold booked inventory.pdf29 Nov 2021
Building plan approvalFile: Heritage Entice Plan 1_compressed_11zon (1).pdf15 Oct 2021
Building plan approvalFile: Heritage Entice Plan 2_compressed_11zon.pdf15 Oct 2021
Building plan approvalFile: Heritage Entice Plan 3_compressed_11zon.pdf15 Oct 2021
Building plan approvalFile: Heritage Entice Plan 4_compressed_11zon.pdf15 Oct 2021
Building plan approvalFile: Heritage Entice Plan 5_compressed_11zon.pdf15 Oct 2021
Building plan approvalFile: Heritage Entice Plan 6_compressed_11zon.pdf15 Oct 2021
Building plan approvalFile: Heritage Entice Plan 7_compressed_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 1_compressed_11zon (1).pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 2_compressed_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 3_compressed_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 4_compressed_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 5_compressed_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 6_compressed_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Heritage Entice Plan 7_compressed_11zon.pdf15 Oct 2021
Declaration about Commencement CertificateFile: Heritage Entice Declaration about Commencement Certificate.pdf13 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Heritage Entice_compressed.pdf5 Oct 2021
OtherFile: Heritage Entice Consent of Allottees-compressed.pdf5 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: b1_compressed.pdf23 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B2_compressed.pdf23 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B3.pdf23 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 21_compressed.pdf23 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory- heritage.pdf2 Jun 2021
Layout approvalFile: Layout.pdf13 Aug 2020
Copy of Layout Approval (in case of layout)File: Layout.pdf13 Aug 2020
Building plan approvalFile: HPSC0648.pdf12 Aug 2020
Building plan approvalFile: HPSC0649.pdf12 Aug 2020
Building plan approvalFile: HPSC0650.pdf12 Aug 2020
PAN CardFile: PAN Card.pdf12 Aug 2020
Copy of the legal title reportFile: SEARCH REPORT.pdf12 Aug 2020
Details of encumbrancesFile: SELF DELARATION.pdf12 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0648.pdf12 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0649.pdf12 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0650.pdf12 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf12 Aug 2020
Declaration in FORM BFile: AFFIDAVITE.pdf12 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHTICATE FORM.pdf12 Aug 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf12 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf12 Aug 2020
Proforma of Allotment letterFile: agrement-converted.pdf12 Aug 2020
OtherFile: Proposed SIXTH FLOOR.pdf12 Aug 2020
OtherFile: proposed SEVENTH FLOOR.pdf12 Aug 2020

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
CLYDE HOMES phase2P53000026035TARABAI PARK, Kolhapur44Aug 2020CompletedAug 2024Feb 2024
CLYDE HOMESP53000000356TARABAI PARK, Kolhapur48Jul 2017CompletedNov 2017Late, Aug 2019
Himmat Bhahadur Enclave2339-CompletedDec 2013Late, Apr 2014
VARAD RESIDENCY24916-CompletedFeb 2012Late, Aug 2012

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep HERITAGE ENTICE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARABAI PARK880+ in Kolhapur

Builder: VARAD DEVELOPERS

VARAD DEVELOPERS has 14 registrations on MahaRERA, including CLYDE HOMES and VAISHNAVI - 2. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if HERITAGE ENTICE is delayed beyond 1 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HERITAGE ENTICE?

The registered promoter entity is VARAD DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAHFV1929J1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HERITAGE ENTICE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HERITAGE ENTICE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HERITAGE ENTICE?

The professionals named in the filing: Architect: Prashant Kapdi; Engineer: Prasad Kulkarni; Chartered Accountant: Sanjay Vhanbatte. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HERITAGE ENTICE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HERITAGE ENTICE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HERITAGE ENTICE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.