Home / Browse projects / Kolhapur, Maharashtra / CLYDE HOMES
CLYDE HOMES
RG-MH-09200 · RERA P53000000356 · Last updated on MahaRERA portal: 25 Apr 2025
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CLYDE HOMES is a Residential / Group Housing project by VARAD DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000000356 on 15 Jul 2017. The registration is recorded completed; possession was promised by 1 Jan 2021. 2 complaints are on record with the regulator.
At a glance
Project
- NameCLYDE HOMES
- TypeResidential / Group Housing
- Location
- KARANDE MALA
- TARABAI PARK
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000000356
- ReraGenie IDRG-MH-09200
Builder
- NameVARAD DEVELOPERS
- Entity typePartnership
- GSTIN27AAHFV1929J1ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSANJAY CHANDRAKANT CHAVAN, PREETI SANJAY CHAVAN, VIBHAVARI CHANDRAKANT CHAVAN, YASH SANJAY CHAVAN, BHAGYASHREE VINAYKUMAR DESHPANDE, GOURI VINAYKUMAR DESHPANDE, AISHWARYA VINAYKUMAR DESHPANDE, RAJ SANJAY CHAVAN, VINAYKUMAR SUDHAKAR DESHPANDE
- Other registrations13 more →
- Completed4 of 14
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2017
- Promised completion1 Jan 2021
- Revised completionNone
- Buildings2 building records
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CLYDE HOMES A WING | NA | 8 | 0 | 0 | 0 | 0 |
| CLYDE HOMES B WING | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
CLYDE HOMES A WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLYDE HOMES B WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prashant Kapadi |
| Engineer | Pranav Kulkarni |
| Engineer | Chetan J Patil |
| Chartered Accountant | SANJAY VHANBATTE & COMPANY |
| Partner | Role in project |
|---|---|
| VARAD DEVELOPERS | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022629 | Shamsundar Digambar Koragaonkar | Mrs Varad Developers Partanship firm through its partner Sanjay Chandrakant Chavan | 27/02/2019 |
| CC005000000340825 | Vinayak Raghunath Jadhav | M/S varad developers through its partner sanjay chandrakant chavan | 25/04/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Feb 2024
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement Certificates / NA Order for plotted developmentFile: Building Permission CH B.pdf | 25 Apr 2025 |
| Building plan approvalFile: 1 SITE PLAN 1ST TO 16TH FLOOR.pdf | 23 Apr 2025 |
| Building plan approvalFile: 2 B and C WING BASEMENT FLOOR 1_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 3 GROUND and STILT FLOOR_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 4 BASEMENT 2 FLOOR B WING_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 5 1 and 2 B WING_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 6 3 and 4 B WING_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 7 5TH and 6TH B WING_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 8 7TH and 8TH B WING_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 9 9TH and TERRACE B WING_11zon.pdf | 23 Apr 2025 |
| Building plan approvalFile: 10 SCHEMATIC SECTION B WING_11zon.pdf | 23 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC First 2016 and Second 2020_compressed (1).pdf | 23 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: All Bandhkam Parvana B C Wing.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 1 SITE PLAN 1ST TO 16TH FLOOR.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 2 B and C WING BASEMENT FLOOR 1_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 3 GROUND and STILT FLOOR_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 4 BASEMENT 2 FLOOR B WING_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 5 1 and 2 B WING_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 6 3 and 4 B WING_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 7 5TH and 6TH B WING_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 8 7TH and 8TH B WING_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 9 9TH and TERRACE B WING_11zon.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: 10 SCHEMATIC SECTION B WING_11zon.pdf | 23 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Clyde Home C wing Completion.pdf | 29 Feb 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 For CLYDE HOME.pdf | 29 Feb 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Clyde Wing A Index.pdf | 23 Feb 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Index (1).pdf | 22 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 209 A clyde homes.pdf | 22 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 209 B clyde homes.pdf | 22 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory CH.pdf | 31 May 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Clyde Homes A Wing Completion Certificate.pdf | 31 May 2021 |
| Certificates of CA (Form 3)File: Rera Form No 3.pdf | 6 Jan 2021 |
| Certificates of CA (Form 5)File: Rera Form 5.pdf | 6 Jan 2021 |
| Certificates of CA (Form 3)File: Rera F N 3.pdf | 20 Mar 2020 |
| Certificates of CA (Form 3)File: RERA FORM-3.pdf | 25 Dec 2019 |
| Certificates of CA (Form 5)File: RERA FORM-3.pdf | 25 Dec 2019 |
| Certificates of CA (Form 5)File: ANNUAL REPORT.pdf | 17 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 31-12 (2).pdf | 14 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 31-03-19.pdf | 14 Oct 2019 |
| Certificates of CA (Form 3)File: FORM.pdf | 14 Oct 2019 |
| Certificates of CA (Form 3)File: FORM-3.pdf | 14 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf | 4 Jan 2019 |
| Certificates of CA (Form 3)File: FORM-3.pdf | 4 Jan 2019 |
| Certificates of CA (Form 5)File: Form No 5.pdf | 11 Oct 2018 |
| PAN CardFile: Varad Pan Card.pdf | 13 Jul 2017 |
| Details of encumbrancesFile: TO WHOM SO EVER IT MAY CONCERN.pdf | 13 Jul 2017 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Jul 2017 |
| Layout approvalFile: A K-1 Layout Sanction Plan Drw - 1 .PDF | 11 Jul 2017 |
| Layout approvalFile: B K-2 Layout Sanction Plan Drw - 1 .PDF | 11 Jul 2017 |
| Building plan approvalFile: A Building Plan Approval (IOD) K-1 Drw- 1 .PDF | 11 Jul 2017 |
| Building plan approvalFile: Building Plan Approval (IOD) .PDF | 11 Jul 2017 |
| Copy of the legal title reportFile: Copy of the legal title report .pdf | 11 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: A K-1 Layout Sanction Plan Drw - 1 .PDF | 11 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: B K-2 Layout Sanction Plan Drw - 1 .PDF | 11 Jul 2017 |
| Building Plan Approval (IOD)File: A Building Plan Approval (IOD) K-1 Drw- 1 .PDF | 11 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan Approval (IOD) .PDF | 11 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates 1.pdf | 11 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates 2.pdf | 11 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 11 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Declaration in FORM B.pdf | 11 Jul 2017 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 11 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale .pdf | 11 Jul 2017 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| HERITAGE ENTICEP53000026113 | TARABAI PARK, Kolhapur | 33 | Aug 2020 | Completed | Aug 2024 | Jan 2023 |
| CLYDE HOMES phase2P53000026035 | TARABAI PARK, Kolhapur | 44 | Aug 2020 | Completed | Aug 2024 | Feb 2024 |
| Himmat Bhahadur Enclave | 23 | 39 | - | Completed | Dec 2013 | Late, Apr 2014 |
| VARAD RESIDENCY | 249 | 16 | - | Completed | Feb 2012 | Late, Aug 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 13 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep CLYDE HOMES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TARABAI PARK880+ in Kolhapur
Filed coordinates, straight-line distance. 156 registered projects within 2 km.
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: VARAD DEVELOPERS
VARAD DEVELOPERS has 14 registrations on MahaRERA, including CLYDE HOMES and VAISHNAVI - 2. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if CLYDE HOMES is delayed beyond 1 Jan 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CLYDE HOMES?
The registered promoter entity is VARAD DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAHFV1929J1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CLYDE HOMES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CLYDE HOMES?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CLYDE HOMES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CLYDE HOMES?
The professionals named in the filing: Architect: Prashant Kapadi; Engineer: Pranav Kulkarni; Engineer: Chetan J Patil; Chartered Accountant: SANJAY VHANBATTE & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CLYDE HOMES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback