Home / Browse projects / Kolhapur, Maharashtra / CLYDE HOMES phase2
CLYDE HOMES phase2
RG-MH-16470 · RERA P53000026035 · Last updated on MahaRERA portal: 11 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CLYDE HOMES phase2 is a Residential / Group Housing project by VARAD DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000026035 on 11 Aug 2020. The registration is recorded completed; possession was promised by 1 Aug 2024.
At a glance
Project
- NameCLYDE HOMES phase2
- TypeResidential / Group Housing
- Location
- KARANDE MALA
- TARABAI PARK
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- RERA no.P53000026035
- ReraGenie IDRG-MH-16470
Builder
- NameVARAD DEVELOPERS
- Entity typePartnership
- GSTIN27AAHFV1929J1ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSANJAY CHANDRAKANT CHAVAN, PREETI SANJAY CHAVAN, VIBHAVARI CHANDRAKANT CHAVAN, YASH SANJAY CHAVAN, BHAGYASHREE VINAYKUMAR DESHPANDE, GOURI VINAYKUMAR DESHPANDE, AISHWARYA VINAYKUMAR DESHPANDE, RAJ SANJAY CHAVAN, VINAYKUMAR SUDHAKAR DESHPANDE
- Other registrations13 more →
- Completed4 of 14
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Aug 2020
- Promised completion1 Aug 2024
- Revised completionNone
- Buildings1 building record
- Documents filed94 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C WING | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 72%.
C WING: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 72% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 85% |
Parking filed88
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prashant Kapadi |
| Engineer | Prasad Kulkarni |
| Chartered Accountant | Sanjay Vhanbatte & Company |
| Partner | Role in project |
|---|---|
| VARAD DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Feb 2024
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Clyde Home C wing 2023-2024.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Clyde Home C wing 2023-2024.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CH C WING Period Ending.pdf | 6 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CH C WING Period Ending.pdf | 6 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Clyde Home C wing Completion.pdf | 17 Feb 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 C H C wing.pdf | 17 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate(Period ending june C wing.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Sep C wing.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 30 09 2022.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 30 09 2022.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 30 06 22.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 30 09 2022.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 31 12 22.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 31 03 23.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CH FORM 5_0001.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CH FORM 2A As 2023_0001.pdf | 4 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: CH - C Sold unsold_0001.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: sold inv 31122022.pdf | 24 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: sold inv 31032023.pdf | 24 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: sold inv 30062023.pdf | 24 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Varad.pdf | 23 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep 2021 Form 3_compressed.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 2021 Form 3_compressed.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar 2022 Form 3_compressed.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2022_compressed.pdf | 13 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: CLYDE HOME C WING SU.pdf | 6 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: clyde home c wing-compressed.pdf | 15 Jun 2022 |
| CERSAI detailsFile: Clyde homes CERSAI_Search_Report_200227490466_For_Asset_Based_Search_05_01_2022_19_47_04_1 | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 2020 -2021 clyde home c wing.pdf | 1 Dec 2021 |
| Declaration about Commencement CertificateFile: Declaration of CC under circular 32.pdf | 29 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 1.pdf | 29 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 2.pdf | 29 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 3.pdf | 29 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 4.pdf | 29 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold Booked inventory.pdf | 29 Nov 2021 |
| Proforma of Allotment letterFile: Engineers's Certificate - 2.pdf | 29 Nov 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 1_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 2_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 10_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 11_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 12_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 13_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 14_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 15_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 16_11zon.pdf | 15 Oct 2021 |
| Building plan approvalFile: Clyde Homes C- Wing 17_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 1_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 2_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 10_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 11_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 12_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 13_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 14_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 15_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 16_11zon.pdf | 15 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 17_11zon.pdf | 15 Oct 2021 |
| Declaration about Commencement CertificateFile: Clyde Homes C-Wing Declaration about Commencement Certificate.pdf | 13 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement Certificate Clyde Homes C-Wing_compressed.pdf | 5 Oct 2021 |
| OtherFile: Clyde Home C Wing Consent of Allottees-compressed.pdf | 5 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec 20.pdf | 23 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar 21.pdf | 23 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun 21.pdf | 23 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory- C WING.pdf | 31 May 2021 |
| Building plan approvalFile: 1 PLAN.pdf | 14 Aug 2020 |
| Building plan approvalFile: 10 PLAN.pdf | 14 Aug 2020 |
| Building plan approvalFile: 11 PLAN.pdf | 14 Aug 2020 |
| Building plan approvalFile: 12 PLAN.pdf | 14 Aug 2020 |
| Building plan approvalFile: 13 PLAN.pdf | 14 Aug 2020 |
| Building plan approvalFile: 14 PLAN.pdf | 14 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 PLAN.pdf | 14 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 PLAN.pdf | 14 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 11 PLAN.pdf | 14 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 12 PLAN.pdf | 14 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 13 PLAN.pdf | 14 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 14 PLAN.pdf | 14 Aug 2020 |
| Building plan approvalFile: 2 PLAN.pdf | 6 Aug 2020 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| HERITAGE ENTICEP53000026113 | TARABAI PARK, Kolhapur | 33 | Aug 2020 | Completed | Aug 2024 | Jan 2023 |
| CLYDE HOMESP53000000356 | TARABAI PARK, Kolhapur | 48 | Jul 2017 | Completed | Nov 2017 | Late, Aug 2019 |
| Himmat Bhahadur Enclave | 23 | 39 | - | Completed | Dec 2013 | Late, Apr 2014 |
| VARAD RESIDENCY | 249 | 16 | - | Completed | Feb 2012 | Late, Aug 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 13 other registrations, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
Keep CLYDE HOMES phase2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TARABAI PARK880+ in Kolhapur
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: VARAD DEVELOPERS
VARAD DEVELOPERS has 14 registrations on MahaRERA, including CLYDE HOMES and VAISHNAVI - 2. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if CLYDE HOMES phase2 is delayed beyond 1 Aug 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CLYDE HOMES phase2?
The registered promoter entity is VARAD DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAHFV1929J1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CLYDE HOMES phase2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CLYDE HOMES phase2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CLYDE HOMES phase2?
The professionals named in the filing: Architect: Prashant Kapadi; Engineer: Prasad Kulkarni; Chartered Accountant: Sanjay Vhanbatte & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CLYDE HOMES phase2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback