Home / Browse projects / Kolhapur, Maharashtra / CLYDE HOMES phase2

Completed No litigation declared Residential / Group Housing project

CLYDE HOMES phase2

By VARAD DEVELOPERS

RG-MH-16470 · RERA P53000026035 · Last updated on MahaRERA portal: 11 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 72%
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

CLYDE HOMES phase2 is a Residential / Group Housing project by VARAD DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000026035 on 11 Aug 2020. The registration is recorded completed; possession was promised by 1 Aug 2024.

At a glance

Project

  • NameCLYDE HOMES phase2
  • TypeResidential / Group Housing
  • Location
    • KARANDE MALA
    • TARABAI PARK
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • RERA no.P53000026035
  • ReraGenie IDRG-MH-16470

Builder

  • NameVARAD DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAHFV1929J1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSANJAY CHANDRAKANT CHAVAN, PREETI SANJAY CHAVAN, VIBHAVARI CHANDRAKANT CHAVAN, YASH SANJAY CHAVAN, BHAGYASHREE VINAYKUMAR DESHPANDE, GOURI VINAYKUMAR DESHPANDE, AISHWARYA VINAYKUMAR DESHPANDE, RAJ SANJAY CHAVAN, VINAYKUMAR SUDHAKAR DESHPANDE
  • Other registrations13 more →
  • Completed4 of 14
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredAug 2020PromisedAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2020
  • Promised completion1 Aug 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 72%.

C WING: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure72%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes85%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered70
Open Space18

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,720 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14040.0
Proposed, not sanctioned12,840 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAYANTARA COMPLEX, E WARD, NAGALA PARK, KOLHAPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Kapadi
EngineerPrasad Kulkarni
Chartered AccountantSanjay Vhanbatte & Company
PartnerRole in project
VARAD DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2024

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Clyde Home C wing 2023-2024.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Clyde Home C wing 2023-2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CH C WING Period Ending.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CH C WING Period Ending.pdf6 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Clyde Home C wing Completion.pdf17 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 C H C wing.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate(Period ending june C wing.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Sep C wing.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 30 09 2022.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 30 09 2022.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 30 06 22.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 30 09 2022.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 31 12 22.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CH FORM 3 31 03 23.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CH FORM 5_0001.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CH FORM 2A As 2023_0001.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: CH - C Sold unsold_0001.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: sold inv 31122022.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: sold inv 31032023.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: sold inv 30062023.pdf24 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Varad.pdf23 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep 2021 Form 3_compressed.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 2021 Form 3_compressed.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar 2022 Form 3_compressed.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2022_compressed.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: CLYDE HOME C WING SU.pdf6 Oct 2022
Disclosure of sold/ booked inventoryFile: clyde home c wing-compressed.pdf15 Jun 2022
CERSAI detailsFile: Clyde homes CERSAI_Search_Report_200227490466_For_Asset_Based_Search_05_01_2022_19_47_04_17 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 2020 -2021 clyde home c wing.pdf1 Dec 2021
Declaration about Commencement CertificateFile: Declaration of CC under circular 32.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 1.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 2.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 3.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers's Certificate - 4.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Booked inventory.pdf29 Nov 2021
Proforma of Allotment letterFile: Engineers's Certificate - 2.pdf29 Nov 2021
Building plan approvalFile: Clyde Homes C- Wing 1_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 2_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 10_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 11_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 12_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 13_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 14_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 15_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 16_11zon.pdf15 Oct 2021
Building plan approvalFile: Clyde Homes C- Wing 17_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 1_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 2_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 10_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 11_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 12_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 13_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 14_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 15_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 16_11zon.pdf15 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Clyde Homes C- Wing 17_11zon.pdf15 Oct 2021
Declaration about Commencement CertificateFile: Clyde Homes C-Wing Declaration about Commencement Certificate.pdf13 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement Certificate Clyde Homes C-Wing_compressed.pdf5 Oct 2021
OtherFile: Clyde Home C Wing Consent of Allottees-compressed.pdf5 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec 20.pdf23 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar 21.pdf23 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun 21.pdf23 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory- C WING.pdf31 May 2021
Building plan approvalFile: 1 PLAN.pdf14 Aug 2020
Building plan approvalFile: 10 PLAN.pdf14 Aug 2020
Building plan approvalFile: 11 PLAN.pdf14 Aug 2020
Building plan approvalFile: 12 PLAN.pdf14 Aug 2020
Building plan approvalFile: 13 PLAN.pdf14 Aug 2020
Building plan approvalFile: 14 PLAN.pdf14 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 1 PLAN.pdf14 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 10 PLAN.pdf14 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 11 PLAN.pdf14 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 12 PLAN.pdf14 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 13 PLAN.pdf14 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 14 PLAN.pdf14 Aug 2020
Building plan approvalFile: 2 PLAN.pdf6 Aug 2020

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HERITAGE ENTICEP53000026113TARABAI PARK, Kolhapur33Aug 2020CompletedAug 2024Jan 2023
CLYDE HOMESP53000000356TARABAI PARK, Kolhapur48Jul 2017CompletedNov 2017Late, Aug 2019
Himmat Bhahadur Enclave2339-CompletedDec 2013Late, Apr 2014
VARAD RESIDENCY24916-CompletedFeb 2012Late, Aug 2012

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep CLYDE HOMES phase2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARABAI PARK880+ in Kolhapur

Builder: VARAD DEVELOPERS

VARAD DEVELOPERS has 14 registrations on MahaRERA, including CLYDE HOMES and VAISHNAVI - 2. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if CLYDE HOMES phase2 is delayed beyond 1 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CLYDE HOMES phase2?

The registered promoter entity is VARAD DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAHFV1929J1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CLYDE HOMES phase2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CLYDE HOMES phase2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CLYDE HOMES phase2?

The professionals named in the filing: Architect: Prashant Kapadi; Engineer: Prasad Kulkarni; Chartered Accountant: Sanjay Vhanbatte & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CLYDE HOMES phase2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CLYDE HOMES phase2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CLYDE HOMES phase2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.