Home / Browse projects / Mumbai City, Maharashtra / HARI TARA HEIGHTS
HARI TARA HEIGHTS
RG-MH-63398 · RERA P51900014699 · Last updated on MahaRERA portal: 26 May 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 52 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HARI TARA HEIGHTS is a Others project by RAMDEV CONSTRUCTION in Mumbai City, Maharashtra, registered with MahaRERA as P51900014699 on 26 Dec 2017. Possession was promised by 29 Jun 2022 and is now 52 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameHARI TARA HEIGHTS
- TypeOthers
- Location
- N C KELKAR ROAD
- DADAR WEST
- GNorth-400028
- Ward GNorth
- Mumbai City
- 400028
- Pincode400028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900014699
- ReraGenie IDRG-MH-63398
Builder
- NameRAMDEV CONSTRUCTION
- Entity typePartnership
- PartnersNARESH VELJI GOGARI, MANOJ VELJI GOGARI, HARILAL VIRAM CHHADWA
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Dec 2017
- Promised completion29 Jun 2022
- Revised completionRevised to 29 Jun 2022 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HARI TARA HEIGHTS | NA | 21 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
HARI TARA HEIGHTS: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 26 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAUSHALCHOUHAN |
| Partner | Role in project |
|---|---|
| RAMDEV CONSTRUCTION | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delay in getting approvals and shortage of labours, We would request you to please grant us extension for one year.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFACTE 24 05 2023 RC.pdf | 26 May 2023 |
| Certificates of CA (Form 3)File: Ramdev construction (1) (1).pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: Signed Ca Certificate Ramdev Construction Sept'22.pdf | 1 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFACTE 22 10 2022 (1).pdf | 27 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hari Tara 2 Aug 2022 22-12.pdf | 3 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARI TARA FORM 2.pdf | 17 May 2022 |
| Certificates of CA (Form 3)File: Signed Ca Certificate Ramdev Construction New Format.pdf | 12 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RAMDEV FORM 2A.pdf | 11 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 29 Jan 2022 |
| Certificates of CA (Form 3)File: Ca Certificate Ramdev Construction New.pdf | 27 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HARI TARA HEIGHTS FORM 1.pdf | 18 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RAM FORM 1.pdf | 21 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARI TARA.pdf | 21 Oct 2021 |
| Form 2AFile: RAMDEV FORM 2A.pdf | 19 Oct 2021 |
| Form 2AFile: FORM 2A.pdf | 14 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARHITECT FORM 1.pdf | 27 Apr 2021 |
| Form 2AFile: 2A (1).pdf | 16 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect CERtificate RAMDEV HARITARA.pdf | 19 Jan 2021 |
| Form 2AFile: FORM 2A RAMDEV HARITARA.pdf | 19 Jan 2021 |
| Certificates of CA (Form 3)File: SEPT-REVISED.pdf | 3 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RAMDEV ARCH.pdf | 21 Oct 2020 |
| Form 2AFile: 2A RAMDEV .pdf | 21 Oct 2020 |
| Certificates of CA (Form 3)File: RAMDEV CA.pdf | 21 Oct 2020 |
| Proforma of Allotment letterFile: HARI TARA AGREEMENT.pdf | 17 Sep 2020 |
| Details of encumbrancesFile: HARI TARA NO ENCUMBRANCE LATEST.pdf | 14 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH MARCH.pdf | 31 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH JUNE.pdf | 31 Jul 2020 |
| Form 2AFile: FORM 2A JUNE.pdf | 31 Jul 2020 |
| Form 2AFile: FORM 2A MARCH.pdf | 31 Jul 2020 |
| Certificates of CA (Form 3)File: CA MARCH.pdf | 31 Jul 2020 |
| Certificates of CA (Form 3)File: CA JUNE.pdf | 31 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RAMDEV ARCHITECT.pdf | 16 Jan 2020 |
| Form 2AFile: FORM-2A.pdf | 16 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 16 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: HARI TARA HEIGHTS.pdf | 4 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: HARI TARA HEIGHTS.pdf | 22 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HARI TARA HEIGHTS_compressed.pdf | 23 Oct 2019 |
| Form 2AFile: HARI TARA HEIGHTS.pdf | 17 Oct 2019 |
| Certificates of CA (Form 3)File: HARI TARA HEIGHTS.pdf | 15 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HARI TARA HEIGHTS.pdf | 30 Jul 2019 |
| Form 2AFile: HARI TARA HEIGHTS FORM 2A_compressed.pdf | 30 Jul 2019 |
| Certificates of CA (Form 3)File: HARI TARA HEIGHTS.PDF | 25 Jul 2019 |
| Building plan approvalFile: IOD.pdf | 17 Jun 2019 |
| Building plan approvalFile: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-6.pdf | 17 Jun 2019 |
| Building plan approvalFile: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-5.pdf | 17 Jun 2019 |
| Building plan approvalFile: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-4.pdf | 17 Jun 2019 |
| Building plan approvalFile: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-3.pdf | 17 Jun 2019 |
| Building plan approvalFile: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-2.pdf | 17 Jun 2019 |
| Building plan approvalFile: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-1.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: IOD.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-6.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-5.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-4.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-3.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-2.pdf | 17 Jun 2019 |
| Building Plan Approval (IOD)File: Amended Floor Plans-Hari Tara Heights-Dadar Property_compressed-1.pdf | 17 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: hari tara heights.pdf | 24 May 2019 |
| Form 2AFile: HARI TARA HEIGHTS.pdf | 23 May 2019 |
| Certificates of CA (Form 3)File: Hari Tara Height.pdf | 18 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf | 28 Jan 2019 |
| Form 2AFile: form 2a.pdf | 28 Jan 2019 |
| Certificates of CA (Form 3)File: ca.pdf | 28 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: cc compressed.pdf | 15 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf | 29 Oct 2018 |
| Certificates of CA (Form 5)File: hari tara form 5.pdf | 29 Oct 2018 |
| Certificates of CA (Form 3)File: CA HARI TARA.pdf | 22 Oct 2018 |
| Certificates of CA (Form 3)File: hari tara heights ca.pdf | 3 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: old arc compressed.pdf | 5 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: new arc compressed.pdf | 5 Jul 2018 |
| Certificates of CA (Form 3)File: Hari Tara Heights.pdf | 19 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: ramdev constrruction cc.pdf | 2 Apr 2018 |
| Proforma of Allotment letterFile: agreement letter.pdf | 22 Dec 2017 |
| Layout approvalFile: layout plan.pdf | 21 Dec 2017 |
| Building plan approvalFile: IOD NEW.pdf | 21 Dec 2017 |
| PAN CardFile: pan ramdev construction.pdf | 21 Dec 2017 |
| Copy of the legal title reportFile: Title certificate.pdf | 21 Dec 2017 |
| Details of encumbrancesFile: no encumbrance certificate.pdf | 21 Dec 2017 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 21 Dec 2017 |
| Building Plan Approval (IOD)File: IOD NEW.pdf | 21 Dec 2017 |
| Declaration in FORM BFile: affidavit cum declaration.pdf | 21 Dec 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HARI TARA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DADAR WEST780+ in Mumbai City
Filed coordinates, straight-line distance. 247 registered projects within 2 km.
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
See every Mumbai City project, with the district possession charts
Builder: RAMDEV CONSTRUCTION
RAMDEV CONSTRUCTION has 3 registrations on MahaRERA, including HARI TARA HEIGHTS and SHYAM PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that HARI TARA HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HARI TARA HEIGHTS is delayed beyond 29 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HARI TARA HEIGHTS?
The registered promoter entity is RAMDEV CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HARI TARA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HARI TARA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HARI TARA HEIGHTS?
The professionals named in the filing: Architect: KAUSHALCHOUHAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HARI TARA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback