Home / Browse projects / Nashik, Maharashtra / HARI NISARG
HARI NISARG
RG-MH-08380 · RERA P51600018648 · Last updated on MahaRERA portal: 28 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HARI NISARG is a Residential / Group Housing project by KBC GLOBAL LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600018648 on 22 Nov 2018. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 17 of the 38 units on this registration are recorded sold or booked, and 13 of 44 construction stages are filed complete.
At a glance
Project
- NameHARI NISARG
- TypeResidential / Group Housing
- Location
- Nashik
- 422401
- Pincode422401
- RERA no.P51600018648
- ReraGenie IDRG-MH-08380
Builder
- NameKBC GLOBAL LIMITED
- Entity typeCompany
- CINL45400MH2007PLC174194
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorNaresh Jagumal Karda
- Other registrations19 more →
- Completed6 of 20
- No longer live13 lapsed, de-registered or revoked
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Nov 2018
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings4 building records
- Documents filed56 files
Current status
Figures as on 28 Mar 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A TYPE | NA | 3 | 2 | 12 | 0 | 12 |
| BUILDING B TYPE | NA | 3 | 0 | 12 | 0 | 12 |
| BUILDING C TYPE | NA | 3 | 0 | 12 | 0 | 12 |
| BUILDING D TYPE | NA | 2 | 0 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 28 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
BUILDING A TYPE27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B TYPE91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING C TYPE0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING D TYPE0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 25% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 25% |
| Solid Waste Management And Disposal | Yes | 25% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed38
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING A TYPE | 0 | 12 | 12 |
| BUILDING B TYPE | 0 | 12 | 12 |
| BUILDING C TYPE | 0 | 12 | 12 |
| BUILDING D TYPE | 2 | 0 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHAVIR SHERIAR IRANI | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dharam Papneja |
| Chartered Accountant | HSB & Go. |
| Partner | Role in project |
|---|---|
| DHARAN INFRA-EPC LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: HARI NISARG JUNE.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: HARI NISARG SEPT.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: HARI NISARG DEC.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: HARI NISARG.pdf | 29 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Nisarg.pdf | 26 Apr 2024 |
| Details of encumbrancesFile: Encumbrance certificate (1) (1)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance (1)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate finance (1)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank acc details_page-0001_page-0001.pdf | 23 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Encumbrance certificate-model allotment letter (1)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Encumbrance certificate-model agreement (1)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 24 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: hari Nisarg.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Nisarg.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Nisarg.pdf | 15 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 15 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Nisarg.pdf | 17 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: HARI NISARG.pdf | 6 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 6 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 5 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 5 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Nisarg.pdf | 20 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Nisarg.pdf | 20 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: H Nisarg.pdf | 16 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: HARI NISARG.pdf | 29 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: hari nisarg.pdf | 5 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: H Nisarg.pdf | 12 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: NISARG.pdf | 22 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nisarg.pdf | 13 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 9 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: hari nisarg.pdf | 9 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: NIsarg 19-20.pdf | 7 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari Nisarg.pdf | 7 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nisarg 20-21.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Hari Nisarg.pdf | 7 Oct 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-Nisarg.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Hari Nisarga-18-19.pdf | 1 Oct 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Hari Nisarga_compressed.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: Form 5 - Hari Nisarg_compressed.pdf | 30 Sep 2019 |
| Proforma of Allotment letterFile: Nisarg-Draft agreement.pdf | 20 Feb 2019 |
| Copy of the legal title reportFile: nisarg-title report.pdf | 15 Nov 2018 |
| Details of encumbrancesFile: Encumbrances.pdf | 15 Nov 2018 |
| Declaration in FORM BFile: Nisarg-Promoter Form-B.pdf | 22 Oct 2018 |
| Building plan approvalFile: Nisarg-Plan 1.pdf | 19 Oct 2018 |
| Building plan approvalFile: Nisarg-Plan 2.pdf | 19 Oct 2018 |
| Layout approvalFile: Nisarg-Layout-1.pdf | 19 Oct 2018 |
| Layout approvalFile: Nisarg-Layout-2.pdf | 19 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: Nisarg-Layout-1.pdf | 19 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: Nisarg-Layout-2.pdf | 19 Oct 2018 |
| Building Plan Approval (IOD)File: Nisarg-Plan 1.pdf | 19 Oct 2018 |
| Building Plan Approval (IOD)File: Nisarg-Plan 2.pdf | 19 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Nisarg-commencement certificate (2).pdf | 19 Oct 2018 |
| Certificates of CA (Form 3)File: Nisarg-CA Certificate.pdf | 19 Oct 2018 |
| Proforma of Allotment letterFile: Nisarg-Performa of Allotment.pdf | 19 Oct 2018 |
| PAN CardFile: KCL.pdf | 15 Aug 2017 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hari Shrushti | Opp IT Park Wadala Road indira Nagar Nashik 422214 | 50 | Completed | Jul 2015 | Late, Aug 2015 |
| Hari Sneh Phase II | Behind Ashoka Universal School near IT park Nashik 422011 | 50 | Completed | May 2015 | Late, Jun 2015 |
| Hari Amrut | Lokhande Mala Old Saikheda road Jail road Nashik 422214 | 69 | Completed | Jul 2014 | Late, Jul 2014 |
| Hari Sparsh | Barnes School Deolali camp Nashik-422502 | 76 | Completed | May 2014 | Apr 2014 |
| Hari OmPhase I | Near Guru Givind Singh polytechnic college Indira Nagar Nashik 422009 | 216 | Completed | Oct 2013 | Late, Nov 2013 |
| Hari Aangan Phase I | Jachak Mala Jai Bhavani Road Deolali | 24 | Completed | Apr 2013 | Late, May 2013 |
| Hari Sneh I | Behind Ashoka universal School near IT park Nashik422011 | 50 | Completed | Dec 2012 | Sep 2012 |
| Hari Sankalp | Near Serene Meadows Gangapur Road 422013 | 37 | Completed | Oct 2012 | Late, Nov 2012 |
| Hari Kunj | Jai Bhavani Road Nashik Road | 36 | Completed | Sep 2012 | Late, Oct 2012 |
| Hari Vandan Phase II | Near Aarambh Maha Vidyalaya Sane Guruji nagar Jail Road Nashik 422101 | 28 | Completed | Aug 2012 | Late, Oct 2012 |
| Hari Sankul Phase I | Near Ashoka Universal School behind Fame Multiplex Ashoka Marg Nashik 422006 | 93 | Completed | Dec 2011 | Late, May 2012 |
| Hari Niwas | Behind Muktidham near hotel Orange Tree Datta Mandir Nashik Road Nashik 422101 | 93 | Completed | Jul 2011 | Late, Sep 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 19 other registrations, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HARI NISARG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Meru Heritage
Amit Builders and Developers
SAI PARK
Jay Developers
ASHTAPAD PHASE VII
ARKK BUILDERS AND DEVELOPERS
Sai Nisarg
Devraj Builders & Land Developers
Ayodhya Residency
Akshay Subhash Khalkar
TULASI BAUG
RISHIKESH BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: KBC GLOBAL LIMITED
KBC GLOBAL LIMITED has 20 registrations on MahaRERA, including HARI SPARSH II and HARI VATIKA. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 12 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that HARI NISARG shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HARI NISARG is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HARI NISARG?
The registered promoter entity is KBC GLOBAL LIMITED, a company as per the filing. Its CIN L45400MH2007PLC174194 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HARI NISARG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HARI NISARG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HARI NISARG?
The professionals named in the filing: Architect: Dharam Papneja; Chartered Accountant: HSB & Go.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HARI NISARG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback