Home / Browse projects / Nashik, Maharashtra / Ayodhya Residency

Registered No litigation declared Residential / Group Housing project

Ayodhya Residency

By Akshay Subhash Khalkar

RG-MH-23552 · RERA P51600078864 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
45 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Ayodhya Residency is a Residential / Group Housing project by Akshay Subhash Khalkar in Nashik, Maharashtra, registered with MahaRERA as P51600078864 on 17 Jan 2025. Possession is promised by 31 Dec 2029. 13 of the 58 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameAyodhya Residency
  • TypeResidential / Group Housing
  • Location
    • Vihitgaon Village
    • Deolali
    • VIHITGAON
    • Nashik
    • 422401
  • Pincode422401
  • RERA no.P51600078864
  • ReraGenie IDRG-MH-23552

Builder

  • NameAkshay Subhash Khalkar
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed54 files

Current status

22%13 of 58 units booked
28.7%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA66202
Wing A and Wing BNA111156056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Wing C41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A and Wing B45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered117
BuildingClosed/CoveredTotal
Wing C99
Wing A and Wing B108108

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,601 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Subhash Bhikaji KhalkarDeolali (CB)Nashik
Sunita Subhash KhalkarDeolali (CB)Nashik
Rajesh Mulchand RohraUlhasnagar (M Corp.)Thane
Sushil Mulchand RohraUlhasnagar (M Corp.)Thane
Lajwanti Mulchand RohraUlhasnagar (M Corp.)Thane
Mulchand Gurumukhdas Rohra (HUF)Ulhasnagar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI4995.1
Proposed, not sanctioned4,995 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO.4,MITHILA BUILDING,M G ROAD,NASHIK ROAD,NASHIK 422101
Estimated costRs 10.37 cr
Cost incurredRs 2.98 cr
Work done28.74%
BuildingWingEstimatedIncurred
Wing A and Wing BNARs 9.00 crRs 2.73 cr
Wing CNARs 1.00 crRs 25.00 lakh
-NARs 37.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT DUGAD
EngineerMILIND RATHI
Chartered AccountantCA Paresh Prakash Sabadra
Chartered AccountantPIYUSH VERMA
Chartered AccountantBHUSHAN GOSAR
PartnerRole in project
Akshay Subhash Khalkar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECTS Sept 25.pdf4 Jul 2026
Withdrawal Update Form 1File: ARCHITECTS Dec 25.pdf4 Jul 2026
Withdrawal Update Form 1File: ARCHITECTS Mar 26.pdf4 Jul 2026
Withdrawal Update Form 2File: STRUCTURES ER Sept 25.pdf4 Jul 2026
Withdrawal Update Form 2File: STRUCTURES ER Dec 25.pdf4 Jul 2026
Withdrawal Update Form 2File: STRUCTURES ER Mar 26.pdf4 Jul 2026
Withdrawal Update Form 3File: Form 3 Sept 25.pdf4 Jul 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf4 Jul 2026
Withdrawal Update Form 3File: Form 3 Mar 26.pdf4 Jul 2026
Form 1File: Form 1 March 25.pdf3 Feb 2026
Form 2File: Form 2 March 25.pdf3 Feb 2026
Form 3File: Form 3 March 2025.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 25.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 June 25.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 June 25.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 June 2025.pdf3 Feb 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASK Buildcon_ Initial_Signed.pdf10 Jan 2025
Other - LegalFile: Succession certificate-Page No 51, 52, 55-29-56.pdf1 Jan 2025
Other - LegalFile: Succession certificate-Page No 51, 52, 55-1-28.pdf1 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf1 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Finance.pdf1 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: cc mail .pdf19 Dec 2024
Building plan approvalFile: ASK Plan No 2.pdf5 Dec 2024
Building plan approvalFile: ASK Plan No 1.pdf5 Dec 2024
Layout approvalFile: ASK Plan No 2.pdf5 Dec 2024
Layout approvalFile: ASK Plan No 1.pdf5 Dec 2024
Copy of the legal title reportFile: Title Report for RERA.pdf5 Dec 2024
Copy of Layout Approval (in case of layout)File: ASK Plan No 1.pdf5 Dec 2024
Copy of Layout Approval (in case of layout)File: ASK Plan No 2.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate new.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: ASK Plan No 1.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: ASK Plan No 2.pdf5 Dec 2024
Other - LegalFile: One plot one registration (2).pdf5 Dec 2024
Other - LegalFile: POA.pdf5 Dec 2024
Other - FinanceFile: POA-ASK.pdf5 Dec 2024
Other - TechnicalFile: One plot one registration (2).pdf5 Dec 2024
Other - TechnicalFile: Clarification Letter.pdf5 Dec 2024
Proforma of Agreement for saleFile: Agreement for sale- ASK Buildcon.pdf5 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf5 Dec 2024
PAN CardFile: Pan card.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: No emcumbrances concerned to Legal .pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: EC finance.pdf4 Dec 2024
Proforma of Allotment letterFile: Allotment letter1_compressed.pdf4 Dec 2024
Declaration in FORM BFile: FORM B 1.pdf4 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Dec 2024
Other - LegalFile: विहीतगांव_32_2ब_प्लॉट_1_2_Satbara (5).pdf4 Dec 2024
Declaration about Commencement CertificateFile: CC declaration (2).pdf4 Dec 2024
CERSAI detailsFile: CERSAI Reports.pdf4 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: No emcumbrances concerned to Legal .pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: EC finance.pdf4 Dec 2024
Deviation Report with respect to model copy of AgreementFile: AFS.pdf4 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf4 Dec 2024

How this compares with Nashik

22%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ayodhya Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Deolali4,100+ in Nashik

Builder: Akshay Subhash Khalkar

AKSHAY SUBHASH KHALKAR has 2 registrations on MahaRERA, including SAI SAMRUDDHI and Ayodhya Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Ayodhya Residency is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ayodhya Residency?

The registered promoter entity is Akshay Subhash Khalkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ayodhya Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ayodhya Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ayodhya Residency?

The professionals named in the filing: Architect: HEMANT DUGAD; Engineer: MILIND RATHI; Chartered Accountant: CA Paresh Prakash Sabadra; Chartered Accountant: PIYUSH VERMA; Chartered Accountant: BHUSHAN GOSAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ayodhya Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ayodhya Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ayodhya Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.