Home / Browse projects / Nashik, Maharashtra / ASHTAPAD PHASE VII

Registered No litigation declared Residential / Group Housing project

ASHTAPAD PHASE VII

By ARKK BUILDERS AND DEVELOPERS

RG-MH-23642 · RERA P51600078954 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
28 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 20%
62 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

ASHTAPAD PHASE VII is a Residential / Group Housing project by ARKK BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600078954 on 24 Jan 2025. Possession is promised by 31 Dec 2029. 18 of the 80 units on this registration are recorded sold or booked, and 28 of 77 construction stages are filed complete.

At a glance

Project

  • NameASHTAPAD PHASE VII
  • TypeResidential / Group Housing
  • Location
    • Deolali
    • Belatgavhan
    • Nashik
    • 422401
  • Pincode422401
  • RERA no.P51600078954
  • ReraGenie IDRG-MH-23642

Builder

  • NameARKK BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings7 building records
  • Documents filed101 files

Current status

22%18 of 80 units booked
32.7%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA3312012
BUILDING BNA3312012
BUILDING CNA3312012
BUILDING DNA3312012
BUILDING ENA3312012
BUILDING FNA3312012
BUILDING GNA33808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 20%.

BUILDING A38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING E38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING F38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING G38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes30%
Street LightingYes45%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84
BuildingClosed/CoveredTotal
BUILDING A1212
BUILDING B1212
BUILDING C1212
BUILDING D1212
BUILDING E1212
BUILDING F1212
BUILDING G1212

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDEOLALI CANTONMENT BOARD
Permissible FSI3130.44
Proposed, not sanctioned3,130 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO.4,MITHILA BUILDING,M G ROAD,NASHIK ROAD,NASHIK 422101
Estimated costRs 10.21 cr
Cost incurredRs 3.34 cr
Work done32.73%
BuildingWingEstimatedIncurred
BUILDING ANARs 1.41 crRs 47.71 lakh
BUILDING BNARs 1.41 crRs 47.71 lakh
BUILDING CNARs 1.41 crRs 47.71 lakh
BUILDING DNARs 1.41 crRs 47.71 lakh
BUILDING ENARs 1.41 crRs 47.71 lakh
BUILDING FNARs 1.41 crRs 47.71 lakh
BUILDING GNARs 1.41 crRs 47.71 lakh
-NARs 35.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFAROOQUE IBRAHIM KHATRI
EngineerKESHAV ADKE
Chartered AccountantBHUSHAN GOSAR
Chartered AccountantPIYUSH LALIT VERMA
PartnerRole in project
ARKK BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 AP VII JUN 25_0001.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1 APVII SEP 25_0001.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1 APVII DEC 25_0001.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1 AP VII MAR 26_0001.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 APVII JUN 25_0001.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 AP VII SEP 25_0001.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 AP VII DEC 25_0001.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 AP VII MAR 26_0001.pdf23 May 2026
Withdrawal Update Form 3File: FORM 3 AP VII JUN 25_0001.pdf23 May 2026
Withdrawal Update Form 3File: FORM 3 AP VII SEP 25_0001.pdf23 May 2026
Withdrawal Update Form 3File: FORM 3 AP VII DEC 25_0001.pdf23 May 2026
Withdrawal Update Form 3File: FORM 3 APVII MAR 26_0001.pdf23 May 2026
Form 5 (FY 2024-2025)File: Ashtapad Phase VII.pdf2 Oct 2025
Form 1File: AP VII FORM 1.pdf11 Jun 2025
Form 2File: AP VII FORM 2.pdf11 Jun 2025
Form 3File: AP VII FORM 3.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 2025.pdf11 Jun 2025
Building plan approvalFile: Updated building plan.pdf25 Jan 2025
Building plan approvalFile: Updated building plan.pdf25 Jan 2025
Building plan approvalFile: Updated building plan.pdf25 Jan 2025
Building plan approvalFile: Updated building plan.pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf25 Jan 2025
Declaration in FORM BFile: Form B Decleration_0001.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf25 Jan 2025
Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf25 Jan 2025
CERSAI detailsFile: No Charge Letter_0001.pdf25 Jan 2025
Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf25 Jan 2025
Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf25 Jan 2025
Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf25 Jan 2025
Declaration in FORM BFile: Form B Decleration_0001.pdf25 Jan 2025
CERSAI detailsFile: No Charge Letter_0001.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf25 Jan 2025
Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf25 Jan 2025
Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf25 Jan 2025
Declaration in FORM BFile: Form B Decleration_0001.pdf25 Jan 2025
CERSAI detailsFile: No Charge Letter_0001.pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf25 Jan 2025
Declaration in FORM BFile: Form B Decleration_0001.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf25 Jan 2025
Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf25 Jan 2025
CERSAI detailsFile: No Charge Letter_0001.pdf25 Jan 2025
Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf25 Jan 2025
Building plan approvalFile: Building plan final.pdf24 Jan 2025
Building plan approvalFile: Building plan final.pdf24 Jan 2025
Building plan approvalFile: Building plan final.pdf24 Jan 2025
Building plan approvalFile: Building plan final.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf24 Jan 2025
Other - TechnicalFile: Declaration of FSI New.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Mail From Corporation.pdf13 Dec 2024
Other - TechnicalFile: CC Mail From Corporation.pdf13 Dec 2024
Building plan approvalFile: Building plan final.pdf6 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf6 Dec 2024
Other - TechnicalFile: Phase VII Annexure A.pdf11 Nov 2024
Other - LegalFile: Sale Deed 1.pdf13 Aug 2024
Other - LegalFile: Sale Deed 2.pdf13 Aug 2024
Other - LegalFile: Anexure A - One plot one reg.pdf13 Aug 2024
Other - LegalFile: 7-12 Phase 7.pdf13 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Ashtapad Phase VII CA Certificate.pdf13 Aug 2024
Building plan approvalFile: Building Plan 2.pdf8 Aug 2024
Building plan approvalFile: ashtapad phase vii sanction stamp.pdf8 Aug 2024
Building plan approvalFile: Building plan final.pdf8 Aug 2024
Layout approvalFile: Sign on back side.pdf8 Aug 2024
Layout approvalFile: ashtapad vii sanction stamp.pdf8 Aug 2024
Layout approvalFile: Building Plan 2.pdf8 Aug 2024
Layout approvalFile: ashtapad phase vii sanction stamp.pdf8 Aug 2024
Layout approvalFile: Building Plan 1.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: Building Plan 1.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: ashtapad phase vii sanction stamp.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: Building Plan 2.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: ashtapad vii sanction stamp.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: Sign on back side.pdf8 Aug 2024
Proforma of Allotment letterFile: allotment letter Format revised.pdf8 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf8 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf8 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ARKK AVENUEBELATGAON DEVLALI86CompletedDec 2019Jul 2019

How this compares with Nashik

22%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHTAPAD PHASE VII on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Deolali4,100+ in Nashik

Builder: ARKK BUILDERS AND DEVELOPERS

ARKK BUILDERS AND DEVELOPERS has 7 registrations on MahaRERA, including CASABLANCA ROAD FRONT and ARKK AVENUE. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ASHTAPAD PHASE VII is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHTAPAD PHASE VII?

The registered promoter entity is ARKK BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHTAPAD PHASE VII?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHTAPAD PHASE VII?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHTAPAD PHASE VII?

The professionals named in the filing: Architect: FAROOQUE IBRAHIM KHATRI; Engineer: KESHAV ADKE; Chartered Accountant: BHUSHAN GOSAR; Chartered Accountant: PIYUSH LALIT VERMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHTAPAD PHASE VII?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHTAPAD PHASE VII. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHTAPAD PHASE VII to a free account