ASHTAPAD PHASE VII
By ARKK BUILDERS AND DEVELOPERS
RG-MH-23642 · RERA P51600078954 · Last updated on MahaRERA portal: 23 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ASHTAPAD PHASE VII is a Residential / Group Housing project by ARKK BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600078954 on 24 Jan 2025. Possession is promised by 31 Dec 2029. 18 of the 80 units on this registration are recorded sold or booked, and 28 of 77 construction stages are filed complete.
At a glance
Project
- NameASHTAPAD PHASE VII
- TypeResidential / Group Housing
- Location
- Deolali
- Belatgavhan
- Nashik
- 422401
- Pincode422401
- RERA no.P51600078954
- ReraGenie IDRG-MH-23642
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings7 building records
- Documents filed101 files
Current status
Figures as on 23 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 3 | 3 | 12 | 0 | 12 |
| BUILDING B | NA | 3 | 3 | 12 | 0 | 12 |
| BUILDING C | NA | 3 | 3 | 12 | 0 | 12 |
| BUILDING D | NA | 3 | 3 | 12 | 0 | 12 |
| BUILDING E | NA | 3 | 3 | 12 | 0 | 12 |
| BUILDING F | NA | 3 | 3 | 12 | 0 | 12 |
| BUILDING G | NA | 3 | 3 | 8 | 0 | 8 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
28 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 20%.
BUILDING A38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING D38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING E38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING F38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING G38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 45% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 40% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed84
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 12 | 12 |
| BUILDING B | 12 | 12 |
| BUILDING C | 12 | 12 |
| BUILDING D | 12 | 12 |
| BUILDING E | 12 | 12 |
| BUILDING F | 12 | 12 |
| BUILDING G | 12 | 12 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A | NA | Rs 1.41 cr | Rs 47.71 lakh |
| BUILDING B | NA | Rs 1.41 cr | Rs 47.71 lakh |
| BUILDING C | NA | Rs 1.41 cr | Rs 47.71 lakh |
| BUILDING D | NA | Rs 1.41 cr | Rs 47.71 lakh |
| BUILDING E | NA | Rs 1.41 cr | Rs 47.71 lakh |
| BUILDING F | NA | Rs 1.41 cr | Rs 47.71 lakh |
| BUILDING G | NA | Rs 1.41 cr | Rs 47.71 lakh |
| - | NA | Rs 35.00 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FAROOQUE IBRAHIM KHATRI |
| Engineer | KESHAV ADKE |
| Chartered Accountant | BHUSHAN GOSAR |
| Chartered Accountant | PIYUSH LALIT VERMA |
| Partner | Role in project |
|---|---|
| ARKK BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 AP VII JUN 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: FORM 1 APVII SEP 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: FORM 1 APVII DEC 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: FORM 1 AP VII MAR 26_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 APVII JUN 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 AP VII SEP 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 AP VII DEC 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 AP VII MAR 26_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: FORM 3 AP VII JUN 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: FORM 3 AP VII SEP 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: FORM 3 AP VII DEC 25_0001.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: FORM 3 APVII MAR 26_0001.pdf | 23 May 2026 |
| Form 5 (FY 2024-2025)File: Ashtapad Phase VII.pdf | 2 Oct 2025 |
| Form 1File: AP VII FORM 1.pdf | 11 Jun 2025 |
| Form 2File: AP VII FORM 2.pdf | 11 Jun 2025 |
| Form 3File: AP VII FORM 3.pdf | 11 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold March 2025.pdf | 11 Jun 2025 |
| Building plan approvalFile: Updated building plan.pdf | 25 Jan 2025 |
| Building plan approvalFile: Updated building plan.pdf | 25 Jan 2025 |
| Building plan approvalFile: Updated building plan.pdf | 25 Jan 2025 |
| Building plan approvalFile: Updated building plan.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Declaration in FORM BFile: Form B Decleration_0001.pdf | 25 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf | 25 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf | 25 Jan 2025 |
| CERSAI detailsFile: No Charge Letter_0001.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf | 25 Jan 2025 |
| Declaration in FORM BFile: Form B Decleration_0001.pdf | 25 Jan 2025 |
| CERSAI detailsFile: No Charge Letter_0001.pdf | 25 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf | 25 Jan 2025 |
| Declaration in FORM BFile: Form B Decleration_0001.pdf | 25 Jan 2025 |
| CERSAI detailsFile: No Charge Letter_0001.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Declaration in FORM BFile: Form B Decleration_0001.pdf | 25 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Updated building plan.pdf | 25 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D Decleration_0001.pdf | 25 Jan 2025 |
| CERSAI detailsFile: No Charge Letter_0001.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Non encumbrance_0001.pdf | 25 Jan 2025 |
| Building plan approvalFile: Building plan final.pdf | 24 Jan 2025 |
| Building plan approvalFile: Building plan final.pdf | 24 Jan 2025 |
| Building plan approvalFile: Building plan final.pdf | 24 Jan 2025 |
| Building plan approvalFile: Building plan final.pdf | 24 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf | 24 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf | 24 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf | 24 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf | 24 Jan 2025 |
| Other - TechnicalFile: Declaration of FSI New.pdf | 20 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Mail From Corporation.pdf | 13 Dec 2024 |
| Other - TechnicalFile: CC Mail From Corporation.pdf | 13 Dec 2024 |
| Building plan approvalFile: Building plan final.pdf | 6 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf | 6 Dec 2024 |
| Other - TechnicalFile: Phase VII Annexure A.pdf | 11 Nov 2024 |
| Other - LegalFile: Sale Deed 1.pdf | 13 Aug 2024 |
| Other - LegalFile: Sale Deed 2.pdf | 13 Aug 2024 |
| Other - LegalFile: Anexure A - One plot one reg.pdf | 13 Aug 2024 |
| Other - LegalFile: 7-12 Phase 7.pdf | 13 Aug 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Ashtapad Phase VII CA Certificate.pdf | 13 Aug 2024 |
| Building plan approvalFile: Building Plan 2.pdf | 8 Aug 2024 |
| Building plan approvalFile: ashtapad phase vii sanction stamp.pdf | 8 Aug 2024 |
| Building plan approvalFile: Building plan final.pdf | 8 Aug 2024 |
| Layout approvalFile: Sign on back side.pdf | 8 Aug 2024 |
| Layout approvalFile: ashtapad vii sanction stamp.pdf | 8 Aug 2024 |
| Layout approvalFile: Building Plan 2.pdf | 8 Aug 2024 |
| Layout approvalFile: ashtapad phase vii sanction stamp.pdf | 8 Aug 2024 |
| Layout approvalFile: Building Plan 1.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Building Plan 1.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: ashtapad phase vii sanction stamp.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Building Plan 2.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: ashtapad vii sanction stamp.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Sign on back side.pdf | 8 Aug 2024 |
| Proforma of Allotment letterFile: allotment letter Format revised.pdf | 8 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf | 8 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan final.pdf | 8 Aug 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ARKK AVENUE | BELATGAON DEVLALI | 86 | Completed | Dec 2019 | Jul 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ASHTAPAD PHASE VII on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Deolali4,100+ in Nashik
Meru Heritage
Amit Builders and Developers
SAI PARK
Jay Developers
Sai Nisarg
Devraj Builders & Land Developers
Ayodhya Residency
Akshay Subhash Khalkar
TULASI BAUG
RISHIKESH BUILDERS AND DEVELOPERS
EKDANTA HEIGHTS
SUKHAKARTA BUILDERS
See every Nashik project, with the district possession charts
Builder: ARKK BUILDERS AND DEVELOPERS
ARKK BUILDERS AND DEVELOPERS has 7 registrations on MahaRERA, including CASABLANCA ROAD FRONT and ARKK AVENUE. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if ASHTAPAD PHASE VII is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ASHTAPAD PHASE VII?
The registered promoter entity is ARKK BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ASHTAPAD PHASE VII?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ASHTAPAD PHASE VII?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ASHTAPAD PHASE VII?
The professionals named in the filing: Architect: FAROOQUE IBRAHIM KHATRI; Engineer: KESHAV ADKE; Chartered Accountant: BHUSHAN GOSAR; Chartered Accountant: PIYUSH LALIT VERMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ASHTAPAD PHASE VII?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback