Home / Browse projects / Nashik, Maharashtra / HARI KUNJ MAYFLOWER

Registration lapsed No litigation declared Others project

HARI KUNJ MAYFLOWER

By KBC GLOBAL LIMITED

RG-MH-63013 · RERA P51600020249 · Last updated on MahaRERA portal: 12 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 33 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

HARI KUNJ MAYFLOWER is a Others project by KBC GLOBAL LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600020249 on 29 Mar 2019. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 33 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHARI KUNJ MAYFLOWER
  • TypeOthers
  • Location
    • NASHIK
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600020249
  • ReraGenie IDRG-MH-63013

Builder

  • NameKBC GLOBAL LIMITED
  • Entity typeCompany
  • CINL45400MH2007PLC174194
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorNaresh Jagumal Karda
  • Other registrations19 more →
  • Completed6 of 20
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

34 months past promisethis monthRegisteredMar 2019First promiseMar 2021Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Mar 2019
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 31 Mar 2021)
  • Buildings5 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA70000
Building BNA70000
Building CNA70000
Building DNA70000
Building ENA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 12 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building ANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building BNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building CNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building DNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building ENot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered5
Open Space49
BuildingClosed/CoveredOpen SpaceTotal
Building A11819
Building B189
Building C189
Building D178
Building E189

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,440 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Alka SuryavanshiPune (M Corp.)Pune

Approvals and building plan

Permissible FSI12999.0
Proposed, not sanctioned6,123 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNASHIK RAOD, NASHIK-422101

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Kumath
PartnerRole in project
DHARAN INFRA-EPC LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600002460Mar 2021 → Dec 2023

Reason as filed by the promoterTo change the completion date of project to December, 31, 2023. As per requirements of Real Estate (Regulation and Development) Act, 2016 we have taken consent from majority of allottees having booked their apartment in the project.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC001000000030271SWAPNIL SARODE AND OTHER 54 HARI KUNJ MAYFLOWERM/s. KARDA CONSTRUCTION LTD.30/07/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: HARI KUNJ MAYFLOWER MAR.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: HARI KUNJ MAYFLOWER JUNE.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: HARI KUNJ MAYFLOWER SEPT.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: HARI KUNJ MAYFLOWER DEC.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: HARI KUNJ MAYFLOWER.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Kunj Mayflower.pdf26 Apr 2024
Details of encumbrancesFile: Encumbrance certificate (1)_page-0001.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance_page-0001.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate finance_page-0001.pdf23 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank acc details_page-0001.pdf23 Feb 2024
Deviation Report with respect to Allotment letterFile: Encumbrance certificate-model allotment letter_page-0001.pdf23 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Encumbrance certificate-model agreement_page-0001.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Kunj mayflower.pdf24 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: hari KunjMay Flower.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Kunj Mayflower.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Hari Kunj Mayflower.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: H Kunj Mayflower.pdf15 Jul 2023
Disclosure of sold/ booked inventoryFile: Mayflower.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Kunj Mayflower.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Kunj Mayflower.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Kunj Mayflower.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Kunj Mayflower.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Kunj Mayflower.pdf5 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Kunj Mayflower.pdf24 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Kunj Mayflower.pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: HARI KUNJ MAYFLOWER.pdf29 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari Kunj Mayflower.pdf21 Apr 2022
Building plan approvalFile: scan0347 (2).pdf28 Mar 2022
Building plan approvalFile: scan0348_(2).pdf28 Mar 2022
Building plan approvalFile: scan0349_(2).pdf28 Mar 2022
Building plan approvalFile: scan0350_(2).pdf28 Mar 2022
Building plan approvalFile: scan0351_(2).pdf28 Mar 2022
Building plan approvalFile: scan0353_(2).pdf28 Mar 2022
Building Plan Approval (IOD)File: scan0347 (2).pdf28 Mar 2022
Building Plan Approval (IOD)File: scan0348_(2).pdf28 Mar 2022
Building Plan Approval (IOD)File: scan0349_(2).pdf28 Mar 2022
Building Plan Approval (IOD)File: scan0350_(2).pdf28 Mar 2022
Building Plan Approval (IOD)File: scan0351_(2).pdf28 Mar 2022
Building Plan Approval (IOD)File: scan0353_(2).pdf28 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: mayflower 2A.pdf12 Feb 2022
Disclosure of sold/ booked inventoryFile: Hari Kunj Mayflower.pdf12 Feb 2022
Disclosure of sold/ booked inventoryFile: MAYFLOWER.pdf15 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mayflower.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mayflower.pdf14 Oct 2021
Form 2AFile: Mayflower.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mayflower.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mayflower.pdf13 Oct 2021
Disclosure of sold/ booked inventoryFile: maflowe.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: hari kunj- may flower.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: Kunj Mayf;lower.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: Mayflower (4).pdf7 Oct 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-KUNJ.pdf15 Aug 2021
Building plan approvalFile: KUNJ-1.pdf15 Apr 2021
Building plan approvalFile: KUNJ-2.pdf15 Apr 2021
Building plan approvalFile: KUNJ-3.pdf15 Apr 2021
Building plan approvalFile: KUNJ-4.pdf15 Apr 2021
Building Plan Approval (IOD)File: KUNJ-1.pdf15 Apr 2021
Building Plan Approval (IOD)File: KUNJ-2.pdf15 Apr 2021
Building Plan Approval (IOD)File: KUNJ-3.pdf15 Apr 2021
Building Plan Approval (IOD)File: KUNJ-4.pdf15 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement 26-3-2021.pdf15 Apr 2021
Building plan approvalFile: New Revised Plan (1)-2_compressed.pdf15 Dec 2020
Building plan approvalFile: New Revised Plan (1)-1.pdf15 Dec 2020
Building Plan Approval (IOD)File: New Revised Plan (1)-1.pdf15 Dec 2020
Building Plan Approval (IOD)File: New Revised Plan (1)-2_compressed.pdf15 Dec 2020
Building plan approvalFile: Plans -1.pdf19 Oct 2020
Building plan approvalFile: Plans -2.pdf19 Oct 2020
Building plan approvalFile: Plans -3.pdf19 Oct 2020
Building Plan Approval (IOD)File: Plans -1.pdf19 Oct 2020
Building Plan Approval (IOD)File: Plans -2.pdf19 Oct 2020
Building Plan Approval (IOD)File: Plans -3.pdf19 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Hari Kunj MayFlower_compressed.pdf30 Sep 2020
Form 2AFile: Form 2A mayflower.pdf24 Dec 2019
Annual Audit Report of Statutory CA (Form 5)File: Form 5 - Hari Kunj Mayflower_compressed.pdf30 Sep 2019
Form 2AFile: Kunj mayflower-FORM 2A.pdf15 May 2019
Declaration in FORM BFile: Form B PROMOTER.pdf26 Mar 2019
Layout approvalFile: Layout.pdf14 Mar 2019
Building plan approvalFile: Building Plan-1-2.pdf14 Mar 2019
Building plan approvalFile: Building Plan-3-4-1.pdf14 Mar 2019
Building plan approvalFile: Building Plan-3-4-2.pdf14 Mar 2019

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise10 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hari ShrushtiOpp IT Park Wadala Road indira Nagar Nashik 42221450CompletedJul 2015Late, Aug 2015
Hari Sneh Phase IIBehind Ashoka Universal School near IT park Nashik 42201150CompletedMay 2015Late, Jun 2015
Hari AmrutLokhande Mala Old Saikheda road Jail road Nashik 42221469CompletedJul 2014Late, Jul 2014
Hari SparshBarnes School Deolali camp Nashik-42250276CompletedMay 2014Apr 2014
Hari OmPhase INear Guru Givind Singh polytechnic college Indira Nagar Nashik 422009216CompletedOct 2013Late, Nov 2013
Hari Aangan Phase IJachak Mala Jai Bhavani Road Deolali24CompletedApr 2013Late, May 2013
Hari Sneh IBehind Ashoka universal School near IT park Nashik42201150CompletedDec 2012Sep 2012
Hari SankalpNear Serene Meadows Gangapur Road 42201337CompletedOct 2012Late, Nov 2012
Hari KunjJai Bhavani Road Nashik Road36CompletedSep 2012Late, Oct 2012
Hari Vandan Phase IINear Aarambh Maha Vidyalaya Sane Guruji nagar Jail Road Nashik 42210128CompletedAug 2012Late, Oct 2012
Hari Sankul Phase INear Ashoka Universal School behind Fame Multiplex Ashoka Marg Nashik 42200693CompletedDec 2011Late, May 2012
Hari NiwasBehind Muktidham near hotel Orange Tree Datta Mandir Nashik Road Nashik 42210193CompletedJul 2011Late, Sep 2011

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 33 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HARI KUNJ MAYFLOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmHARI KUNJ MAYFLOWERCompleted 154Lapsed / revoked 38Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: KBC GLOBAL LIMITED

KBC GLOBAL LIMITED has 20 registrations on MahaRERA, including HARI SPARSH II and HARI VATIKA. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 12 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that HARI KUNJ MAYFLOWER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HARI KUNJ MAYFLOWER is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARI KUNJ MAYFLOWER?

The registered promoter entity is KBC GLOBAL LIMITED, a company as per the filing. Its CIN L45400MH2007PLC174194 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARI KUNJ MAYFLOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HARI KUNJ MAYFLOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HARI KUNJ MAYFLOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARI KUNJ MAYFLOWER?

The professionals named in the filing: Architect: Sumit Kumath. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI KUNJ MAYFLOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI KUNJ MAYFLOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI KUNJ MAYFLOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.