Home / Browse projects / Aurangabad, Maharashtra / HAPPY HOMES

Registered No litigation declared Residential / Group Housing project

HAPPY HOMES

By GAYATRI ASHOK MULE

RG-MH-29972 · RERA P51500051755 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
8 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 75%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

HAPPY HOMES is a Residential / Group Housing project by GAYATRI ASHOK MULE in Aurangabad, Maharashtra, registered with MahaRERA as P51500051755 on 27 Jun 2023. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameHAPPY HOMES
  • TypeResidential / Group Housing
  • Location
    • MITMITA ROAD
    • MITMITA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500051755
  • ReraGenie IDRG-MH-29972

Builder

  • NameGAYATRI ASHOK MULE
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO 01 TO 06NA10000
ROW HOUSE NO 07 TO 12NA10000
ROW HOUSE NO 13 TO 18NA10000
ROW HOUSE NO 19 TO 24NA10000
HAPPY APARTMENTNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 75%.

ROW HOUSE NO 01 TO 0636%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 07 TO 1229%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 13 TO 1823%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 19 TO 2411%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HAPPY APARTMENT0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
CCTV MAINT GATE AND COMPOUND WALLYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19
BuildingClosed/CoveredTotal
ROW HOUSE NO 01 TO 0666
ROW HOUSE NO 07 TO 1266
ROW HOUSE NO 13 TO 1866
HAPPY APARTMENT11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,413 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
APPASAHEB KADUBA MULEAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAURANGABAD MAHANAGARPALIKA , AURANGABAD
Permissible FSI3256.47
Proposed, not sanctioned3,256 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAMARTH NAGAR, AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAJJAD LODHI
EngineerMOHAMMAD FAIZUDDIN
Chartered AccountantR A B & ASSOCIATES
Chartered AccountantBANGAD PARJANE & CO
PartnerRole in project
GAYATRI ASHOK MULE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AC Happy Home.pdf12 May 2026
Form 2File: EC 31-03-2026.pdf12 May 2026
Form 3File: CA Happy Home.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-03-2026.pdf12 May 2026
Form 1File: FORM 1 HAPPY HOMES QTR 3.pdf7 Apr 2026
Form 2File: FORM 2 QTR 3_compressed.pdf7 Apr 2026
Form 3File: form 3 of happy homes qtr 31-12-25.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Scanned Document.pdf7 Apr 2026
Form 1File: AC 30-09-2025.pdf26 Feb 2026
Form 2File: EC 30-09-2025.pdf26 Feb 2026
Form 3File: Form 3 for 30-9-25.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2025 (2).pdf26 Feb 2026
Form 1File: AC 30-06-2023.pdf24 Feb 2026
Form 2File: EC 30-06-2023.pdf24 Feb 2026
Form 3File: FORM 3 30-06-2023.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2023 (2).pdf24 Feb 2026
Form 1File: AC 30-09-2023.pdf24 Feb 2026
Form 2File: EC 30-09-2023.pdf24 Feb 2026
Form 3File: FORM 3 30-09-2023.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2023 (2).pdf24 Feb 2026
Form 1File: AC 31-12-2023.pdf24 Feb 2026
Form 2File: EC 31-12-2023.pdf24 Feb 2026
Form 3File: FORM 3 31-12-2023.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2023 (2).pdf24 Feb 2026
Form 1File: AC 31-03-2024.pdf24 Feb 2026
Form 2File: EC 31-03-2024.pdf24 Feb 2026
Form 3File: FORM 3 31-03-2024.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2024 (2).pdf24 Feb 2026
Form 1File: AC 30-06-2024.pdf24 Feb 2026
Form 2File: EC 30-06-2024.pdf24 Feb 2026
Form 3File: FORM 3 30-06-2024_.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2024 (2).pdf24 Feb 2026
Form 1File: AC 30-09-2024.pdf24 Feb 2026
Form 2File: EC 30-09-2024.pdf24 Feb 2026
Form 3File: FORM 3 30-09-2024.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2024 (2).pdf24 Feb 2026
Form 1File: AC 31-12-2024.pdf24 Feb 2026
Form 2File: EC 31-12-2024.pdf24 Feb 2026
Form 3File: FORM 3 31-12-2024.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2024 (2).pdf24 Feb 2026
Form 1File: AC 31-03-2025.pdf24 Feb 2026
Form 2File: EC 31-03-2025.pdf24 Feb 2026
Form 3File: FORM 3 31-03-2025.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2025 (2).pdf24 Feb 2026
Form 1File: AC 30-06-2025.pdf24 Feb 2026
Form 2File: EC 30-06-2025.pdf24 Feb 2026
Form 3File: FORM 3 30-06-2025.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2025 (2).pdf24 Feb 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 - CA CERTIFICATE HAPPY HOMES 20062023.pdf21 Jun 2023
Details of encumbrances concerned to FinanceFile: DECLARATION - LEGAL ENCUMBRANCE - HAPPY HOMES.pdf16 Jun 2023
Details of encumbrances concerned to FinanceFile: DECLARATION - FINANCIAL ENCUMBRANCE - HAPPY HOMES.pdf16 Jun 2023
Details of encumbrances concerned to LegalFile: DECLARATION - LEGAL ENCUMBRANCE - HAPPY HOMES.pdf16 Jun 2023
Details of encumbrances concerned to LegalFile: DECLARATION - FINANCIAL ENCUMBRANCE - HAPPY HOMES.pdf16 Jun 2023
Declaration about Commencement CertificateFile: DECLARATION - COMMENCEMENT CERTIFICATE - HAPPY HOMES.pdf16 Jun 2023
CERSAI detailsFile: UNDERTAKING - NO SECURITY INT - CERSAI - HAPPY HOMES.pdf16 Jun 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT LETTER - HAPPY HOMES.pdf16 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - AGREEMENT TO SALE - HAPPY HOMES.pdf16 Jun 2023
Proforma of Allotment letterFile: FORMAT - ALLOTMENT LETTER - HAPPY HOMES.pdf12 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER CERTIFICATE - HAPPY HOMES.pdf30 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - HAPPY HOMES.pdf29 May 2023
CERSAI detailsFile: CERSAI REPORT - APPASAHEB MULE.pdf29 May 2023
Declaration in FORM BFile: FORM B - GAYATRI MULEY - HAPPY HOMES.pdf26 May 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF BOOKED, SOLD INVENTORY - HAPPY HOMES.pdf26 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTH REAL EST ORG - HAPPY HOMES.pdf26 May 2023
Proforma of Agreement for saleFile: FORMAT - AGREEMENT TO SALE.pdf26 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION - SEPERATE BANK ACC - HAPPY HOMES.pdf26 May 2023
Layout approvalFile: LAND LAYOUT - HAPPY HOMES.pdf23 May 2023
Building plan approvalFile: Building Plan - Happy Homes.pdf23 May 2023
PAN CardFile: PAN - GAYATRI MULE.pdf23 May 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - HAPPY HOMES PR.pdf23 May 2023
Copy of Layout Approval (in case of layout)File: LAND LAYOUT - HAPPY HOMES.pdf23 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Happy Homes.pdf23 May 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - HAPPY HOMES.pdf23 May 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep HAPPY HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MITMITA1,400+ in Aurangabad

2 kmHAPPY HOMESCompleted 5Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: GAYATRI ASHOK MULE

GAYATRI ASHOK MULE has 1 registration on MahaRERA, including HAPPY HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if HAPPY HOMES is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HAPPY HOMES?

The registered promoter entity is GAYATRI ASHOK MULE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HAPPY HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HAPPY HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HAPPY HOMES?

The professionals named in the filing: Architect: SAJJAD LODHI; Engineer: MOHAMMAD FAIZUDDIN; Chartered Accountant: R A B & ASSOCIATES; Chartered Accountant: BANGAD PARJANE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HAPPY HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HAPPY HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HAPPY HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.