HANWARE HEIGHTS
RG-MH-68185 · RERA P51900019260 · Last updated on MahaRERA portal: 31 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- Litigation declared, 7 cases
- 2 complaints at MahaRERA
- Completion date moved by 42 months
- 3 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HANWARE HEIGHTS is a Others project by HANWARE REALTY in DHARAVI, MUMBAI, 400017, registered with MahaRERA as P51900019260 on 14 Jan 2019. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 42 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameHANWARE HEIGHTS
- TypeOthers
- Location
- 60 FEET ROAD
- DHARAVI
- MUMBAI
- 400017
- Pincode400017
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900019260
- ReraGenie IDRG-MH-68185
Builder
- NameHANWARE REALTY
- Entity typePartnership
- PartnersMASOOD ISMAIL SARANG, KIRAN KAPOORCHAND KOTHARI, MOHAMMED ARIF ABDUL HAMID TANWAR, KETAN CHHAGANLAL PATEL
- PartnerNIYAZ AHMED ABDULLAH HANWARE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jan 2019
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed111 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HANWARE HEIGHTS | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
HANWARE HEIGHTS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 31 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| FITNESS CENTRE | Yes | 100% |
Parking filed47
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | N M MAHALE OF MAHALE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| HANWARE REALTY | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterREASON FOR DELAY ARE 1) COVID-19 LOCKDOWN 2) SHORTAGE OF LABOUR DUE TO MIGRATION OF LABOURS TO THEIR NATIVE PLACES. 3) SHORTAGE OF CONSTRUCTION MATERIALS DUE TO COVID-19 LOCKDOWN 4) INCREASED COVID-19 CASES IN DHARAVI WHERE OUR PROJECT IS SITUATED.
Reason as filed by the promoterSHORTAGE OF LABOURS AND BUILDING MATERIALS DUE TO COVID 19
Reason as filed by the promoterConstruction work is stopped in the Covid 19 period due to the increased cases in Dharavi area where project is situated. After that construction work got slow for few months due to migration of labours in their villages because of Covid 19 lockdown. The our allottees are aware of all our problems and they are co-operating with us and have given their consents for extension. We request the authority to please give us further extension to complete the project.
Litigation declared7
| Case | Court | Status |
|---|---|---|
| 904/2010 | BOMBAY HIGH COURT | SUIT IS PENDING |
| 5380/2012 | CITY CIVIL COURT MUMBAI | SUIT IS PENDING |
| 847/2013 | BOMBAY HIGH COURT | SUIT IS PENDING |
| 1873/2013 | CITY CIVIL COURT MUMBAI | SUIT IS FOR FRAMING OF ISSUES |
| 102049/2021 | CITY CIVIL COURT MUMBAI | SUIT IS PENDING |
| 547/2023 | CITY CIVIL COURT MUMBAI | SUIT IS PENDING |
| 904/904 | HIGH COURT | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000171526 | Pramila Fernando | Hanware Realty | 13/11/2019 |
| CC12400304 | Shankar Yadav | HANWARE REALTY | 02/10/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Dec 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Dec 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 May 2024
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: PLAN 1_compressed.pdf | 31 May 2024 |
| Building Plan Approval (IOD)File: PLAN 1_compressed.pdf | 31 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE MARCH -2024.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEER CERTIFICATE MARCH 2024.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SITE SUPERVISOR - FORM 2A.pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD AND BOOKED INVENTORY_compressed.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 3 - MARCH - 2024_compressed.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - CA CERTIFICATE_compressed.pdf | 31 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CERTIFICATE PART.pdf | 2 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC GROUND AND FIRST FLOOR DHARAVI.pdf | 2 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2ND TO 18TH FLOOR OCCUPATION CERTIFICATE.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: BOOK SOLD DEC 2023.pdf | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2022.pdf | 14 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 2022.pdf | 14 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEPT 2022.pdf | 14 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DEC 2022.pdf | 14 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2023.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1 MARCH 2022.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH 2022.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUNE 2022.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEPT 2022.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC 2022.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH 2023.pdf | 14 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 2022.pdf | 14 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3 JUNE 2022.pdf | 14 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3 SEPT 2022.pdf | 14 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3 DEC 2022.pdf | 14 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 2023.pdf | 14 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - 2021-2022.pdf | 14 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORMAT 5 - 2022-23.pdf | 14 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2023.pdf | 26 Jun 2023 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 24 Jun 2023 |
| Form 2AFile: FORM 2A 2023.pdf | 24 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOK INVENTORY.pdf | 24 Jun 2023 |
| Building plan approvalFile: AMENDED PLAN LETTER DATED 03-04-2023.pdf | 13 Apr 2023 |
| Building plan approvalFile: TYPICAL FLOOR PLAN.pdf | 13 Apr 2023 |
| Building Plan Approval (IOD)File: AMENDED PLAN LETTER DATED 03-04-2023.pdf | 13 Apr 2023 |
| Building Plan Approval (IOD)File: TYPICAL FLOOR PLAN.pdf | 13 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: DHARAVI COMMENCEMENT CERTIFICATE.pdf | 13 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22).pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY DEC 2022.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE.pdf | 19 Jan 2023 |
| CERSAI detailsFile: CERSAI Reports 1.pdf | 9 Jul 2022 |
| CERSAI detailsFile: CERSAI Reports 2.pdf | 9 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-2020.pdf | 9 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-2021.pdf | 9 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNITS.pdf | 1 Jul 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE DETAILS.pdf | 30 Jun 2022 |
| Declaration about Commencement CertificateFile: DECLARATION FOR COMMENCEMENT CERTIFICATE.pdf | 30 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SITE SUPERVISOR CERTIFICATE.pdf | 30 Jun 2022 |
| CERSAI detailsFile: ENCUMBRANCE DETAILS.pdf | 30 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA (Form 5) 2018-2019.pdf | 30 Jun 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA ACCOUNT DETAILS.pdf | 30 Jun 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT FOR ALLOTMENT.pdf | 30 Jun 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT FOR AGREEMENT.pdf | 30 Jun 2022 |
| Form 2AFile: FORM 2A OCT 2021.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 4 Jun 2021 |
| Building plan approvalFile: Ground flr plan Feb 2021.pdf | 21 May 2021 |
| Building plan approvalFile: 1st flr plan Feb 2021.pdf | 21 May 2021 |
| Building Plan Approval (IOD)File: Ground flr plan Feb 2021.pdf | 21 May 2021 |
| Building Plan Approval (IOD)File: 1st flr plan Feb 2021.pdf | 21 May 2021 |
| OtherFile: Amendment cum OC letter.pdf | 21 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER COMMENCEMENT CERTIFICATE.pdf | 7 Apr 2021 |
| Details of Restarting of Construction work post lockdownFile: AMENDED PLAN CUM OC.pdf | 7 Apr 2021 |
| OtherFile: AMENDED PLAN CUM OC.pdf | 7 Apr 2021 |
| Building plan approvalFile: REVISED GROUND FLOOR PLAN.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 2.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 3.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 4.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 5.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 6.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 7.pdf | 27 Nov 2020 |
| Building plan approvalFile: REVISED APPROVED PLAN 8.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED GROUND FLOOR PLAN.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 2.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 3.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 4.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 5.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 6.pdf | 27 Nov 2020 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 7.pdf | 27 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HANWARE HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHARAVI, MUMBAI
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
BKC EDGE
Labdhi Bliss Private Limited
CRD Aura
CRD Blue Ocean LLP
PRINCE TOWER
Punith Buildtech Private Limited
SAMATA B SRA CHS LTD
NEETA BUILDERS
F.W.TOWER
crystal construction corporation
AKASH
Kay Bee Developers Pvt. Ltd.
Builder: HANWARE REALTY
HANWARE REALTY has 1 registration on MahaRERA, including HANWARE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What does it mean that HANWARE HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HANWARE HEIGHTS is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HANWARE HEIGHTS?
The registered promoter entity is HANWARE REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HANWARE HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HANWARE HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HANWARE HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HANWARE HEIGHTS?
The professionals named in the filing: Architect: N M MAHALE OF MAHALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HANWARE HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback