GURUSIDDHI KRUPA

By DEVIDAS RAMCHANDRA KULKARNI

RG-MH-34748 · RERA P51600050655 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 96%
6 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

GURUSIDDHI KRUPA is a Residential / Group Housing project by DEVIDAS RAMCHANDRA KULKARNI in Nashik, Maharashtra, registered with MahaRERA as P51600050655 on 21 Apr 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 8 of the 14 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameGURUSIDDHI KRUPA
  • TypeResidential / Group Housing
  • Location
    • ASHOKA MARG
    • WADALA
    • Nashik (M Corp.)
    • Nashik
    • 422011
  • Pincode422011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600050655
  • ReraGenie IDRG-MH-34748

Builder

  • NameDEVIDAS RAMCHANDRA KULKARNI
  • Entity typeIndividual
  • GSTIN27ABRPK1189N2ZU
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed96 files

Current status

57%8 of 14 units booked
57.7%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GURUSIDDHI KRUPANA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 96%.

GURUSIDDHI KRUPA: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered12
Open Space31

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area471 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Oct 2024

Approvals and building plan

Sanctioning authorityNASHIK MUNCIPAL CORPORATION
Permissible FSI1520.0
Proposed, not sanctioned1,520 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNASHIK ROAD
Estimated costRs 3.60 cr
Cost incurredRs 2.08 cr
Work done57.69%
BuildingWingEstimatedIncurred
GURUSIDDHI KRUPANARs 3.50 crRs 2.08 cr
-NARs 10.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHAM KULKARNI
EngineerYOGESH THATTE
EngineerSHUBHAM KULKARNI
Chartered AccountantSHUBHAM MUNDADA
Chartered AccountantDEVENDRA SOMNATH KULKARNI
Chartered AccountantTRIPTI KAINTH
Chartered AccountantTRIPTI AMIT KUKREJA
PartnerRole in project
DEVIDAS RAMCHANDRA KULKARNI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519133Dec 2025 → Mar 2027

Reason as filed by the promoterb. On account of personal health issues and mediocre sales of the units the development activities at the project were moving on a slow pace. Also the Promoter could not factor the time that would take for him to complete the project at the time of registration which is evident from the fact that the registration as first sought only for 31 months. Due to all such factors, the promoter has been able to complete more than 90% project by deploying additional labourers.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 15042026.pdf22 Jun 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 15042026.pdf22 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 24042026.pdf22 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf7 Mar 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf7 Mar 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf7 Mar 2026
Form 3File: form 3 q3 24-25.pdf30 Dec 2025
Form 2File: FORM 2 Q3 24-25.pdf30 Dec 2025
Form 1File: form 1 q3 24-25.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 31122024.pdf30 Dec 2025
Form 1File: form 1 q2 24-25.pdf30 Dec 2025
Form 2File: FORM 2 Q2 24-25.pdf30 Dec 2025
Form 3File: form 3 q2 24-25.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 30092024.pdf30 Dec 2025
Form 1File: form 1 q1 24-25.pdf30 Dec 2025
Form 2File: FORM 2 Q1 24-25.pdf30 Dec 2025
Form 3File: form 3 q1 24-25.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 30062024.pdf30 Dec 2025
Form 1File: architect q4 1.pdf30 Dec 2025
Form 2File: FORM 2 Q4.pdf30 Dec 2025
Form 3File: form 3 q4.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 31032024.pdf30 Dec 2025
Form 1File: form 1 q3.pdf30 Dec 2025
Form 2File: Drk Form 2 q3.pdf30 Dec 2025
Form 3File: Form 3 q1_compressed.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: unsold sold 31122023.pdf30 Dec 2025
Form 1File: form 1 q2.pdf30 Dec 2025
Form 2File: Drk form 2 q2.pdf30 Dec 2025
Form 3File: Drk form 3 q3_compressed.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 30092023.pdf30 Dec 2025
Form 1File: form 1 q1.pdf30 Dec 2025
Form 2File: DRK Form 2 q 1.pdf30 Dec 2025
Form 3File: DRK Form 3 Q1.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 30062023.pdf30 Dec 2025
Withdrawal Update Form 1File: form 1 q2 25-26.pdf30 Dec 2025
Withdrawal Update Form 2File: form 2 q2 25-26.pdf30 Dec 2025
Withdrawal Update Form 3File: form 3 q2 25-26.pdf30 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 31032024 signed.pdf30 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A 31032025 signed.pdf30 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 guru siddhi krupa.pdf30 Dec 2025
Form 5 (FY 2023-2024)File: Form 5.pdf30 Dec 2025
Form 1File: form 1 q1 25-26.pdf3 Nov 2025
Form 2File: form 2 Q1 25-26.pdf3 Nov 2025
Form 3File: form 3 q1 25-26.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold_inventory.pdf3 Nov 2025
Form 1File: form 1 q2 25-26.pdf3 Nov 2025
Form 2File: form 2 q2 25-26.pdf3 Nov 2025
Form 3File: form 3 q2 25-26.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold_inventory q2 25-26.pdf3 Nov 2025
Form 1File: form 1 q4 24-25.pdf20 Jun 2025
Form 2File: Form - 2 q4 24-25.pdf20 Jun 2025
Form 3File: form 3 24-25 q4.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold_inventory.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q1 24-25.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q2 24-25.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q3 24-25.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 q1 24-25.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 q2 24-25.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 q3 24-25.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1 24-25.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 24-25.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 24-25.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect q4 1.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 q4.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 q4.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q1.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q2.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q3.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DRK Form 2 q 1.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Drk form 2 q2.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Drk Form 2 q3.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 q1_compressed.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Drk form 3 q2_compressed.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Drk form 3 q3_compressed.pdf30 Jan 2024
Declaration in FORM BFile: Adobe Scan Apr 12, 2023 (2).pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Drk form 3 (1)_compressed.pdf7 Apr 2023
CERSAI detailsFile: Cersai declaration.pdf3 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Drk seperate bank.pdf29 Mar 2023
Layout approvalFile: Layout HIGHLIGHTED-merged.pdf20 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
YOGIRAJ KRUPAP51600019730NEW KALA NAGAR, Nashik14Mar 2019CompletedFeb 2022Late, Mar 2022

How this compares with Nashik

57%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 15 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GURUSIDDHI KRUPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADALA4,100+ in Nashik

2 kmGURUSIDDHI KRUPACompleted 82Lapsed / revoked 22Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: DEVIDAS RAMCHANDRA KULKARNI

DEVIDAS RAMCHANDRA KULKARNI has 2 registrations on MahaRERA, including YOGIRAJ KRUPA and GURUSIDDHI KRUPA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if GURUSIDDHI KRUPA is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURUSIDDHI KRUPA?

The registered promoter entity is DEVIDAS RAMCHANDRA KULKARNI, an individual as per the filing. Its GSTIN 27ABRPK1189N2ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURUSIDDHI KRUPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GURUSIDDHI KRUPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURUSIDDHI KRUPA?

The professionals named in the filing: Architect: SHUBHAM KULKARNI; Engineer: YOGESH THATTE; Engineer: SHUBHAM KULKARNI; Chartered Accountant: SHUBHAM MUNDADA; Chartered Accountant: DEVENDRA SOMNATH KULKARNI; Chartered Accountant: TRIPTI KAINTH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURUSIDDHI KRUPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURUSIDDHI KRUPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURUSIDDHI KRUPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.