Home / Browse projects / Jalna, Maharashtra / GURUKRUPA RESIDENCY

Registered No litigation declared Residential / Group Housing project

GURUKRUPA RESIDENCY

By VIGHNAHARTA BUILDCON PRIVATE LIMITED

RG-MH-14722 · RERA P51400049509 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
0 of 110Construction stages doneacross 10 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

GURUKRUPA RESIDENCY is a Residential / Group Housing project by VIGHNAHARTA BUILDCON PRIVATE LIMITED in Jalna, Maharashtra, registered with MahaRERA as P51400049509 on 15 Feb 2023. Possession is promised by 21 Nov 2026.

At a glance

Project

  • NameGURUKRUPA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • AMBAD ROAD
    • ---
    • Jalna (M Cl)
    • Jalna
    • 431203
  • Pincode431203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51400049509
  • ReraGenie IDRG-MH-14722

Builder

  • NameVIGHNAHARTA BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsROHIT RAMESH KAPOOR, SANDESH JIVANLAL KAKKAD

Key dates

this monthRegisteredFeb 2023PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion21 Nov 2026
  • Revised completionNone
  • Buildings10 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A-1 TO A-9NA20000
WING A-10 TO A-21NA20000
WING A- 22 TO A- 33NA20000
WING A-34 TO A-42NA20000
WING A-43 TO A-50NA20000
WING B-1 TO B-5NA20000
WING B-6 TO B-16NA20000
WING B-17 TO B- 25NA20000
WING C-1 TO C-7NA20000
WING C-8 TO C-18NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Excavation, at 0%.

WING A-1 TO A-90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A-10 TO A-210%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A- 22 TO A- 330%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A-34 TO A-420%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A-43 TO A-500%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B-1 TO B-50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B-6 TO B-160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B-17 TO B- 250%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C-1 TO C-70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C-8 TO C-180%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Open Space5
BuildingOpen SpaceTotal
WING B-1 TO B-511
WING B-6 TO B-1611
WING B-17 TO B- 2511
WING C-1 TO C-711
WING C-8 TO C-1811

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
SHIVAJI CHANDRAKANTRAO PANGARKARJalna (M Cl)Jalna
SUNANDA SANJAY KHONDEAurangabad (M Corp.)Aurangabad
RAJESH CHANDRAKANT PANGARKARJalna (M Cl)Jalna
SANJAY CHANDRAKANT PANGARKARJalna (M Cl)Jalna
RAMESH CHANDRAKANT PANGARKARJalna (M Cl)Jalna
SURYKANT CHANDRAKANT PANGARAKARJalna (M Cl)Jalna
CHANDRAKANT GANPATRAO PANGARKARJalna (M Cl)Jalna
MANOJ CHANDRAKANT PANGARKARJalna (M Cl)Jalna

Approvals and building plan

Sanctioning authorityMUNCIPAL COULCIL JALNA
Permissible FSI8311.6
Proposed, not sanctioned8,312 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJALNA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShrikant M Mahajan M MAHAJAN
EngineerKiran P Kakde P KAKDE
Chartered AccountantChaitanya Bawkar & Associates Rajendra Bawkar
PartnerRole in project
VIGHNAHARTA BUILDCON PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 21 Nov 2026

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf14 May 2026
Form 2File: Form 2.pdf14 May 2026
Form 3File: Form 3.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD B0OKED INVENTORY.pdf14 May 2026
Self-declaration of Quarterly ProgressFile: Self Decleration.pdf14 May 2026
Form 1File: Form 1.pdf6 May 2026
Form 2File: Form 2.pdf6 May 2026
Form 3File: Form 3.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: booked sold inventory.pdf6 May 2026
Self-declaration of Quarterly ProgressFile: self declaration.pdf6 May 2026
Form 1File: Adobe Scan 31 Jul 2025 (5).pdf4 Aug 2025
Form 2File: form 2_30 june 2025.pdf4 Aug 2025
Form 3File: Adobe Scan 31 Jul 2025 (2).pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold_Book inventory 31 Jul 2025 (4).pdf4 Aug 2025
Self-declaration of Quarterly ProgressFile: Self declaration 31 Jul 2025 (3).pdf4 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A_31 Jul 2025 (1).pdf4 Aug 2025
Form 1File: FORM -1 31-03-2023.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: Form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT 31-03-2023.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration 31-03-2023.PDF1 Jul 2025
Form 1File: FORM -1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: Form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT 30-06-2023.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration.PDF1 Jul 2025
Form 1File: FORM- 1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: Form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT 30-09-2023.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration.PDF1 Jul 2025
Form 1File: FORM - 1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: Form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.PDF1 Jul 2025
Form 1File: FORM- 1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: FORM 3_compressed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration.PDF1 Jul 2025
Form 1File: Form 1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: Form 3.PDF1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Decleration.PDF1 Jul 2025
Form 1File: FORM - 1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: FORM 3_compressed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration.PDF1 Jul 2025
Form 1File: Form 1.PDF1 Jul 2025
Form 2File: Form 2.PDF1 Jul 2025
Form 3File: Form 3_compressed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration.PDF1 Jul 2025
Form 1File: Form 1.PDF1 Jul 2025
Form 2File: Form 2.pdf1 Jul 2025
Form 3File: Form 3_compressed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKEDINVENT.PDF1 Jul 2025
Self-declaration of Quarterly ProgressFile: Self declaration.PDF1 Jul 2025
Form 2A (FY 2022-2023)1 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A.PDF1 Jul 2025
Form 5 (FY 2022-2023)File: Annual Report March 2023.PDF10 Jun 2025
Form 5 (FY 2023-2024)File: Annual Report March 2024.PDF10 Jun 2025
Form 5 (FY 2024-2025)File: Annual Report March 2025.PDF10 Jun 2025
Proforma of Agreement for saleFile: new ats RERA_GURUKRUPA RESIDENCY JALNA.pdf23 Jan 2023
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER_Gurukrupa Residency.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Acc Gurukrupa Residency.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 06 Jan 2023 (1).pdf7 Jan 2023
Declaration about Commencement CertificateFile: Format D Vighnaharta Buildcon.PDF5 Jan 2023
Declaration in FORM BFile: Form B Vighanaharta Buildcon_compressed.pdf5 Jan 2023
PAN CardFile: IMG-2168.pdf19 Dec 2022
Copy of the legal title reportFile: TITLE REPORT JALNA.pdf19 Dec 2022
Deviation Report with respect to Allotment letterFile: No devation.pdf19 Dec 2022
Deviation Report with respect to model copy of AgreementFile: No devation.pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf10 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Dec 2022
Building plan approvalFile: Building Plan.pdf6 Dec 2022
Layout approvalFile: Layout.pdf6 Dec 2022

How this compares with Jalna

8%of Jalna projects moved their completion datethis one has not
41%of Jalna registrations have lapsed or been cancelledthis one is on the register

Computed across the 100+ Jalna projects on ReraGenie, from their own filings.

Keep GURUKRUPA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ---100+ in Jalna

2 kmGURUKRUPA RESIDENCYCompleted 4Lapsed / revoked 5Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: VIGHNAHARTA BUILDCON PRIVATE LIMITED

VIGHNAHARTA BUILDCON PRIVATE LIMITED has 1 registration on MahaRERA, including GURUKRUPA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.

Frequently asked questions

What are my rights if GURUKRUPA RESIDENCY is delayed beyond 21 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURUKRUPA RESIDENCY?

The registered promoter entity is VIGHNAHARTA BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURUKRUPA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GURUKRUPA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURUKRUPA RESIDENCY?

The professionals named in the filing: Architect: Shrikant M Mahajan M MAHAJAN; Engineer: Kiran P Kakde P KAKDE; Chartered Accountant: Chaitanya Bawkar & Associates Rajendra Bawkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURUKRUPA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURUKRUPA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURUKRUPA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.