Home / Browse projects / Aurangabad, Maharashtra / GURUCHHAYA APARTMENT

Completed No litigation declared Residential / Group Housing project

GURUCHHAYA APARTMENT

By UNIQUE BUILDERS

RG-MH-15466 · RERA P51500049582 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

GURUCHHAYA APARTMENT is a Residential / Group Housing project by UNIQUE BUILDERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500049582 on 15 Feb 2023. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameGURUCHHAYA APARTMENT
  • TypeResidential / Group Housing
  • Location
    • RAILWAY STATION
    • JALAN NAGAR
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500049582
  • ReraGenie IDRG-MH-15466

Builder

  • NameUNIQUE BUILDERS
  • Entity typePartnership
  • PartnersPRAMOD KASTURCHAND MUTHA, SUWALAL GOPIRAM YADAV, PAWAN PANDITRAO WARHADE, DEVILAL KALYAN YADAV
  • Other registrations3 more →
  • Completed4 of 4

Key dates

this monthRegisteredFeb 2023PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2023
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GURUCHHAYA APARTMENTNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GURUCHHAYA APARTMENT: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Compound wall and entrance gateYes100%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered11
Open Space20

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area591 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SUSHILKUMAR K. MANSINGKA & ASHA S. MANSINGKAAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI2128.32
Proposed, not sanctioned1,833 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW OSMANPURA COLONY AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMIL ARCHITECTS
EngineerMILIND MADHUKARRAO WADEKAR
Chartered AccountantSAURABH S GANGWAL
Chartered AccountantPRASAD HARALE
PartnerRole in project
UNIQUE BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2024

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oct to Dec 24 Architect Form1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Oct to Dec 2024 Engineer Form2.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form4UB.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Guruchhaya Apartment OC Certificate.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Guruchhaya Apartment OC Dwg upload.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17102024 Architect Certiificate July to Sep 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17102024 Engineer Certificate July to Sep 2024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 10082024 CA FORM NO5 FY 202324).pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15072024 Form1 Architect Certificate Up To April To June2024.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15072024 Form2 Engineer Certificate Up To April To June2024.pdf18 Jul 2024
Copy of the legal title reportFile: 15052024 Title Search Report.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A QUALITY ASSURANCE CERTIFICATE UP TO MARCH 2024.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17042024 Form1 Architect Certificate Up To January To March2024.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17042024 Form2 Engineer Certificate Up To January To March2024.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UBAC.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UBEC.pdf20 Jan 2024
Building plan approvalFile: 1 2 ok.pdf23 Nov 2023
Building plan approvalFile: 2 2 ok.pdf23 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 2 ok.pdf23 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 2 ok.pdf23 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 08112023 Revised Permission Cmmencement Certificate.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 31082023 CA FORM NO 5 FY 202223.pdf1 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A QUALITY ASSURANCE CERTIFICATE UP TO MARCH 2023.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17072023 Form1 Architect Certificate Up To April To June 2023.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17072023 Form2 Engineer Certificate Up To April To June 2023.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01042023 Form1 Architect Certificate Up To March2023.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01042023 Form2 Engineer Certificate Up To March2023.pdf5 Jul 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES OK.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES OK.pdf9 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05012023 CA Form No3 ok.pdf6 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Discloser of Interest in other real estater project SGY.pdf6 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Discloser of Interest in other real estater project PPW.pdf6 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Discloser of Interest in other real estater project DKY.pdf6 Feb 2023
Proforma of Allotment letterFile: 23012023 ANNEXURE 1 Allotment Letter.pdf27 Jan 2023
Layout approvalFile: Approval Plan.pdf25 Jan 2023
Building plan approvalFile: Approval Plan.pdf25 Jan 2023
Building plan approvalFile: Approval Section Plan.pdf25 Jan 2023
PAN CardFile: Pan Card.pdf25 Jan 2023
Copy of the legal title reportFile: 28122022 FORMAT A Title Search Report.pdf25 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf25 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbrance.pdf25 Jan 2023
Copy of Layout Approval (in case of layout)File: Approval Plan.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approval Section Plan.pdf25 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf25 Jan 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf25 Jan 2023
Declaration in FORM BFile: 10012023 Form B.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01122022 Form1 Architect Certificate.pdf25 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01122022 Form2 Engineer Certificate.pdf25 Jan 2023
CERSAI detailsFile: 25012023 CERSAI Search Report.pdf25 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Discloser of Interest in other real estater project.pdf25 Jan 2023
Proforma of Agreement for saleFile: 25012023 Agreement To Sale Draft.pdf25 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 25012023 Format A Declaration About Seprate Bank Account.pdf25 Jan 2023
Deviation Report with respect to Allotment letterFile: 25012023 Deviation Report with Model copy of Allotment Letter.pdf25 Jan 2023
Deviation Report with respect to model copy of AgreementFile: 25012023 Deviation Report with Model Agreement To Sale.pdf25 Jan 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep GURUCHHAYA APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JALAN NAGAR1,400+ in Aurangabad

2 kmGURUCHHAYA APARTMENTCompleted 17Lapsed / revoked 13Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: UNIQUE BUILDERS

UNIQUE BUILDERS has 4 registrations on MahaRERA, including SHRIRAM PARK and UNIQUE PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if GURUCHHAYA APARTMENT is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURUCHHAYA APARTMENT?

The registered promoter entity is UNIQUE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURUCHHAYA APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GURUCHHAYA APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURUCHHAYA APARTMENT?

The professionals named in the filing: Architect: SAMIL ARCHITECTS; Engineer: MILIND MADHUKARRAO WADEKAR; Chartered Accountant: SAURABH S GANGWAL; Chartered Accountant: PRASAD HARALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURUCHHAYA APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURUCHHAYA APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURUCHHAYA APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.