ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / GUNDECHA GREENS PHASE 1

Completed No litigation declared Residential / Group Housing project

GUNDECHA GREENS PHASE 1

By KASHTAMANDUP DEVELOPERS PVT LTD

RG-MH-20758 · RERA P51800001863 · Last updated on MahaRERA portal: 27 Jun 2023

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

GUNDECHA GREENS PHASE 1 is a Residential / Group Housing project by KASHTAMANDUP DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001863 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 3 complaints are on record with the regulator.

At a glance

Project

  • NameGUNDECHA GREENS PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Thakur Village Road
    • NG Suncity Phase-III
    • Janupada
    • Huzefa Nagar
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001863
  • ReraGenie IDRG-MH-20758

Builder

  • NameKASHTAMANDUP DEVELOPERS PVT LTD
  • Entity typeCompany
  • ChairpersonPARAS DEVRAJ GUNDECHA
  • Managing DirectorsDEEPAK PARAS GUNDECHA, POONAM PARAS GUNDECHA

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GUNDECHA GREENSNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GUNDECHA GREENS: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area917 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10355.55
Proposed, not sanctioned10,356 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSagar Avenue Ground Floor S V Road Andheri West Mumbai 400058

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTARUN MOTTA
PartnerRole in project
KASHTAMANDUP DEVELOPERS PVT LTD-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000090163Range Forest Officer TulsiKashtamandup Developers Pvt. Ltd.08/08/2019
CC006000000196751NAVEEN KOILA RAOKashtamandup developers pvt. ltd22/04/2021
CC006000000196788Krishna ParabKashtamandup Developers Pvt. Ltd.25/04/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Mar 2021

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: G G C WING.pdf27 Jun 2023
Disclosure of sold/ booked inventoryFile: Gundecha Greens B wing.pdf27 Jun 2023
Certificates of CA (Form 5)File: FORM 5.pdf27 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf27 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part O C.pdf4 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1.pdf30 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2.pdf30 Nov 2020
Certificates of CA (Form 3)File: CA Form 3.pdf30 Nov 2020
Certificates of CA (Form 5)File: CA Form 5.pdf30 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERT.pdf27 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERT.pdf27 Aug 2020
Certificates of CA (Form 3)File: FORM 3 CA CERT.pdf27 Aug 2020
Certificates of CA (Form 5)File: FORM 5 CA CERT.pdf27 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch From 1.pdf24 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Form 2.pdf24 Jun 2020
Certificates of CA (Form 3)File: CA Form 3.pdf24 Jun 2020
Certificates of CA (Form 5)File: CA Form 5.pdf24 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificte form1.pdf28 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate form2.pdf28 Jan 2020
Certificates of CA (Form 3)File: CA Certificate form3.pdf28 Jan 2020
Certificates of CA (Form 5)File: CA Certificate form5.pdf28 Jan 2020
OtherFile: OC Submission Sheet.pdf10 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gundecha Greens Licensed Surveyor Cert Form 1.pdf31 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gundecha Greens Engineer's Cert form 2.pdf31 Oct 2019
Certificates of CA (Form 3)File: Gundecha Greens CA Cert Form 3.pdf31 Oct 2019
Certificates of CA (Form 5)File: Gundecha Greens CA Cert Form 5.pdf31 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gundecha Greens License Suryeor wing Cert Form 1.pdf25 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gundecha Greens Engg Cert wing Form 2.pdf25 Jul 2019
Certificates of CA (Form 3)File: Gundecha Greens CA Cert Form 3.pdf25 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 (Engineer).pdf30 Apr 2019
Certificates of CA (Form 3)File: Form 3 CA.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gundecha Greens Licensed Suryour's Cert Form-1.pdf29 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gundecha Greens B AND C Wing Engineers Cert Form 2.pdf29 Jan 2019
Form 2AFile: Gundecha Greens B AND C Wing Quality Assurance Cert Form 2A.pdf29 Jan 2019
Certificates of CA (Form 3)File: Gundecha Greens CA Cert Form3.pdf29 Jan 2019
Certificates of CA (Form 5)File: Gundecha Greens CA Cert Form5.pdf29 Jan 2019
Certificates of CA (Form 5)File: Form 5 CA certificate.pdf7 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cert - KDPL.pdf31 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate - KDPL.pdf31 Oct 2018
Certificates of CA (Form 3)File: Gundecha Greens CA certificate.pdf31 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gundecha Greens Arch_cert Form 1.pdf27 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gundecha Greens Eng cert form 2.pdf27 Jul 2018
Certificates of CA (Form 3)File: Gundecha Green CA Cert Form 3.PDF27 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gundecha Greens B C Wing Architect Cert Form1.pdf24 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gundecha Greens B C Eng Cert Form 2.pdf24 Apr 2018
Certificates of CA (Form 3)File: Gundecha Greens CA Cert Form3.pdf24 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC - Greens.pdf10 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gundecha Greens Architect Cert Form1.pdf30 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gundecha Greens Engineers Cert Form2.pdf30 Jan 2018
Certificates of CA (Form 3)File: Gundecha Greens CA Cert Form3.pdf30 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate form1.pdf26 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate form2.pdf26 Oct 2017
Certificates of CA (Form 3)File: CA form 3.pdf26 Oct 2017
Details of encumbrancesFile: decl of encumbrance.pdf1 Aug 2017
Details of encumbrancesFile: ICICI BANK LTD.pdf1 Aug 2017
Details of encumbrancesFile: ICICI HOME FINANCE.pdf1 Aug 2017
Declaration in FORM BFile: form b pg 1.pdf1 Aug 2017
Declaration in FORM BFile: form b pg 2.pdf1 Aug 2017
Declaration in FORM BFile: form b pg 3.pdf1 Aug 2017
Layout approvalFile: COPY OF LAYOUT PLAN.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 7.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 8.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 9.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 10.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 11.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 6.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 2.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 3.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 4.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 5.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 1.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 12.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens 13.pdf25 Jul 2017
Building plan approvalFile: G Greens Proposed Entire Project Plan.pdf25 Jul 2017
Building plan approvalFile: G Greens Proposed Project Plan Phase I.pdf25 Jul 2017
Building plan approvalFile: Gundecha Greens IOD.pdf25 Jul 2017
Copy of the legal title reportFile: Chitnis Vaithy.pdf25 Jul 2017
Details of encumbrancesFile: DETAILS OF ENCUMBRANCE.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: COPY OF LAYOUT PLAN.pdf25 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GUNDECHA GREENS PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NG Suncity Phase-III, Janupada, Huzefa Nagar6,700+ in Mumbai Suburban

2 kmGUNDECHA GREENS PHASE 1Completed 13Lapsed / revoked 11Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: KASHTAMANDUP DEVELOPERS PVT LTD

KASHTAMANDUP DEVELOPERS PVT LTD has 1 registration on MahaRERA, including GUNDECHA GREENS PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GUNDECHA GREENS PHASE 1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GUNDECHA GREENS PHASE 1?

The registered promoter entity is KASHTAMANDUP DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GUNDECHA GREENS PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GUNDECHA GREENS PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GUNDECHA GREENS PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GUNDECHA GREENS PHASE 1?

The professionals named in the filing: Architect: TARUN MOTTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GUNDECHA GREENS PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GUNDECHA GREENS PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GUNDECHA GREENS PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.