ReraGenieLog inGet a buyer report

Home / Browse projects / GULMOHAR SKYPARK

Registered No litigation declared Others project

GULMOHAR SKYPARK

By LEO CONSTRUCTION

RG-MH-27706 · RERA P52100045998 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 15.00 crore secured on the land, in favour of The Vishweshwar Sahakari bank Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2027Possession promisedno revision filed
18 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
58 of 181Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 181 documents Report an error

GULMOHAR SKYPARK is a Others project by LEO CONSTRUCTION in DHANORI, 411015, registered with MahaRERA as P52100045998 on 15 Jun 2022. Possession is promised by 30 Jun 2027. 123 of the 181 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete.

At a glance

Project

  • NameGULMOHAR SKYPARK
  • TypeOthers
  • Location
    • DHANORI
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045998
  • ReraGenie IDRG-MH-27706

Builder

  • NameLEO CONSTRUCTION
  • Entity typePartnership
  • GSTIN27AADFL1024E1ZW
  • PartnersMOHIT HARISH AURORA, HARISH PRELHADRAI AURORA, ANAND BHAURAO SARVADE

Key dates

this monthRegisteredJun 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed181 files

Current status

68%123 of 181 units booked
93.7%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GULMOHAR SKYPARK WING CNA141271071
GULMOHAR SKYPARK WING BNA131152961
GULMOHAR SKYPARK WING ANA111142749

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

GULMOHAR SKYPARK WING C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
GULMOHAR SKYPARK WING B74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
GULMOHAR SKYPARK WING A63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes40%
Street LightingYes75%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes25%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes25%
Open ParkingYes30%

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered144
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
GULMOHAR SKYPARK WING C601070
GULMOHAR SKYPARK WING B47552
GULMOHAR SKYPARK WING A37542

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofThe Vishweshwar Sahakari bank Ltd
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on25 Sep 2024

Approvals and building plan

Sanctioning authorityPune Municipal Corporation (PMC)
Permissible FSI17259.63
Proposed, not sanctioned14,385 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch174, DHOLE PATIL ROAD, NEAR KAPILA HOTEL, PUNE 411001
Estimated costRs 42.50 cr
Cost incurredRs 39.84 cr
Work done93.74%
BuildingWingEstimatedIncurred
GULMOHAR SKYPARK WING CNARs 14.50 crRs 14.50 cr
GULMOHAR SKYPARK WING BNARs 12.00 crRs 12.00 cr
GULMOHAR SKYPARK WING ANARs 10.00 crRs 10.00 cr
-NARs 6.00 crRs 3.34 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwati Mangale
Engineershirole constructions
Chartered AccountantK G Jhamvar & Co
Chartered AccountantSameer Birla
PartnerRole in project
LEO CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed181

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf26 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf26 May 2026
Withdrawal Update Form 3File: CA Certificate.pdf26 May 2026
Form 2A (FY 2022-2023)File: Form 2A - March 2023.pdf20 May 2026
Form 2A (FY 2023-2024)File: Form 2A - March 2024.pdf20 May 2026
Form 2A (FY 2024-2025)File: Form 2A - March 2025.pdf20 May 2026
Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf20 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf24 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf24 Apr 2026
Form 5 (FY 2022-2023)File: Form 5 FY 2022-23.pdf13 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Certificate.pdf24 Feb 2026
Withdrawal Update Form 2File: Engineers Certificate.pdf24 Feb 2026
Withdrawal Update Form 3File: CA Certificate.pdf24 Feb 2026
Form 5 (FY 2024-2025)File: Form 5.pdf1 Oct 2025
Form 1File: Architect Certificate.pdf22 Aug 2025
Form 2File: Engineers Certificate.pdf22 Aug 2025
Form 3File: CA Certificate.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf22 Aug 2025
Form 1File: Architect Certificate.pdf22 Aug 2025
Form 2File: Engineers Certificate.pdf22 Aug 2025
Form 3File: CA Certificate.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf22 Aug 2025
Withdrawal Update Form 1File: Architect Certificate.pdf22 Aug 2025
Withdrawal Update Form 2File: Engineers Certificate.pdf22 Aug 2025
Withdrawal Update Form 3File: CA Certificate.pdf22 Aug 2025
Withdrawal Update Form 1File: Architect Certificate.pdf14 Aug 2025
Withdrawal Update Form 2File: Engineerrs Certificate.pdf14 Aug 2025
Withdrawal Update Form 3File: CA Certificate.pdf14 Aug 2025
Layout approvalFile: 1-12.pdf30 Jul 2025
Building plan approvalFile: 2-12.pdf30 Jul 2025
Building plan approvalFile: 3-12.pdf30 Jul 2025
Building plan approvalFile: 4-12.pdf30 Jul 2025
Building plan approvalFile: 5-12.pdf30 Jul 2025
Building plan approvalFile: 6-12.pdf30 Jul 2025
Building plan approvalFile: 7-12.pdf30 Jul 2025
Building plan approvalFile: 8-12.pdf30 Jul 2025
Building plan approvalFile: 9-12.pdf30 Jul 2025
Building plan approvalFile: 10-12.pdf30 Jul 2025
Building plan approvalFile: 11-12.pdf30 Jul 2025
Building plan approvalFile: 12-12.pdf30 Jul 2025
Commencement certificateFile: C C- 0007.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Jan 2025
Building plan approvalFile: 1-12.pdf21 Nov 2024
Building plan approvalFile: 2-12.pdf21 Nov 2024
Building plan approvalFile: 3-12.pdf21 Nov 2024
Building plan approvalFile: 4-12.pdf21 Nov 2024
Building plan approvalFile: 5-12.pdf21 Nov 2024
Building plan approvalFile: 6-12.pdf21 Nov 2024
Building plan approvalFile: 7-12.pdf21 Nov 2024
Building plan approvalFile: 8-12.pdf21 Nov 2024
Building plan approvalFile: 9-12.pdf21 Nov 2024
Building plan approvalFile: 10-12.pdf21 Nov 2024
Building plan approvalFile: 11-12.pdf21 Nov 2024
Building plan approvalFile: 12-12.pdf21 Nov 2024
Building plan approvalFile: 1-12.pdf21 Nov 2024
Building plan approvalFile: 2-12.pdf21 Nov 2024
Building plan approvalFile: 3-12.pdf21 Nov 2024
Building plan approvalFile: 4-12.pdf21 Nov 2024
Building plan approvalFile: 5-12.pdf21 Nov 2024
Building plan approvalFile: 6-12.pdf21 Nov 2024
Building plan approvalFile: 7-12.pdf21 Nov 2024
Building plan approvalFile: 8-12.pdf21 Nov 2024
Building plan approvalFile: 9-12.pdf21 Nov 2024
Building plan approvalFile: 10-12.pdf21 Nov 2024
Building plan approvalFile: 11-12.pdf21 Nov 2024
Building plan approvalFile: 12-12.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 1-12.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-12.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-12.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-12.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-12.pdf21 Nov 2024

Keep GULMOHAR SKYPARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

2 kmGULMOHAR SKYPARKCompleted 37Lapsed / revoked 11Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: LEO CONSTRUCTION

LEO CONSTRUCTION has 1 registration on MahaRERA, including GULMOHAR SKYPARK. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if GULMOHAR SKYPARK is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GULMOHAR SKYPARK?

The registered promoter entity is LEO CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AADFL1024E1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GULMOHAR SKYPARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GULMOHAR SKYPARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GULMOHAR SKYPARK?

The professionals named in the filing: Architect: Swati Mangale; Engineer: shirole constructions; Chartered Accountant: K G Jhamvar & Co; Chartered Accountant: Sameer Birla. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GULMOHAR SKYPARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GULMOHAR SKYPARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GULMOHAR SKYPARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.