GRUHAM
RG-MH-14222 · RERA P51600031815 · Last updated on MahaRERA portal: 4 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GRUHAM is a Others project by DEEPAK RAMCHANDRA BAGAD in Nashik, Maharashtra, registered with MahaRERA as P51600031815 on 12 Nov 2021. The registration is recorded completed; possession was promised by 31 Aug 2026. The completion date has moved by 24 months from the original filing. 8 of the 31 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameGRUHAM
- TypeOthers
- Location
- S No 839/1/3
- Srinivas Colony uttara nagar
- Nashik
- 422011
- Pincode422011
- RERA no.P51600031815
- ReraGenie IDRG-MH-14222
Builder
- NameDEEPAK RAMCHANDRA BAGAD
- Entity typeIndividual
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Nov 2021
- Promised completion31 Aug 2026
- Revised completionRevised to 31 Aug 2026 (originally 31 Aug 2024)
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 4 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gruham | NA | 8 | 8 | 26 | 5 | 31 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Gruham: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Chanda Madan Udawant | Nashik Road | Nashik |
| Ajay A Khamkar and Others | Nashik | Nashik |
| Vidya Aabasaheb Kamkar | Nashik | Nashik |
| Late. Aabasaheb Shivram Khamkar | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Gruham | NA | Rs 5.90 cr | Rs 5.90 cr |
| - | NA | Rs 45.00 lakh | Rs 45.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAVI AMRUTKAR and ASSOCIATES Amrutkar |
| Engineer | Vinayak Dayaram Kale |
| Engineer | Bapu Fatanagre |
| Chartered Accountant | A.S. KOTHAWADE AND CO. |
| Chartered Accountant | A R N R AND ASSOCIATES |
| Chartered Accountant | Rahul Nawandar |
| Partner | Role in project |
|---|---|
| DEEPAK RAMCHANDRA BAGAD | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, Maharera, Subject: Request to Consider Extension Application under Section 7(3) of RERA Act. We are writing to formally inform you of the delay in the completion of our project, Gruham, registered under RERA with the registration number P51600031815. We deeply regret the inconvenience caused to the homebuyers and assure you of our commitment to completing the project at the earliest possible time. A) Reason for the Delay: Market Conditions The real estate sector has been experiencing slow demand, leading to an accumulation of unsold inventory. This has directly impacted cash flows and slow
Reason as filed by the promoterMarket Conditions The real estate sector has been experiencing slow demand, leading to an accumulation of unsold inventory. This has directly impacted cash flows and slowed the pace of project completion. Financial Constraints Nearly 95% of the construction work is completed, but due to sluggish demand, only 45% of the project has been booked. This has resulted in a liquidity crunch, affecting the progress of the remaining construction activities. B) Planning Details for Completion of Balance Work: Current Status of Work The project is 95% completed, with the remaining 50% consisting of fini
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Gruham Occupancy Certificate.pdf | 4 Jul 2026 |
| Occupational CertificateFile: Gruham F4.pdf | 4 Jul 2026 |
| Occupational CertificateFile: Gruham F-3 Q4 2025-26_organized.pdf | 4 Jul 2026 |
| Withdrawal Update Form 1File: Gruham Architects Certificate Q4 2025-26.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Gruham F2 Q4 2025-26.pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Gruham F-3 Q4 2025-26_organized.pdf | 3 Jun 2026 |
| Form 2A (FY 2025-2026)File: Gruham F-2A 25-26 Q4.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Gruham F1 2025-26 Q3.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: Gruham F2 2025-26 Q3.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: Gruham F-3 25-26 Q3.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: Gruham- ARCHITECTu0027S CERTIFICATE Q2 - 2025-26.pdf | 28 Nov 2025 |
| Withdrawal Update Form 2File: Gruham F2 Q2 2025-26.pdf | 28 Nov 2025 |
| Withdrawal Update Form 3File: Gruham F-3 2025-26 Q2_compressed.pdf | 28 Nov 2025 |
| Form 5 (FY 2024-2025)File: Gruham Form -5 FY 2024-25.pdf | 2 Sep 2025 |
| Form 2A (FY 2024-2025)File: Engineer Form 2A Q4 2024-25.pdf | 27 Aug 2025 |
| Withdrawal Update Form 1File: Gruham Architect Certificate 2025-26 Q1.pdf | 26 Aug 2025 |
| Withdrawal Update Form 2File: Gruham Engineer Certificate 2025-26 Q1.pdf | 26 Aug 2025 |
| Withdrawal Update Form 3File: Gruham F-3 2025-26 Q1.pdf | 26 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4 2024-25.pdf | 31 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost.pdf | 31 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Form 3 Q4 2024 - 25.pdf | 31 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Q4 2024-25.pdf | 31 May 2025 |
| Disclosure of sold/ booked inventoryFile: Gruham Sold Unsold Q4 2024-25.pdf | 31 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Form 2A Q4 2024-25.pdf | 31 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_merged.pdf | 14 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE Q3 - 2024-25.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F3 30-6-23.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F3 Q3 24-25.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F3 31-3-24.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F3 31-12-23.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F3 Q2 23-24.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Q3 - 2024-25.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-06-2023.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-12-2024.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-09-2024.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-06-2024.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-03-2024.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-12-2023.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-09-2023.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-03-2023.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-12-2022.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-09-2022.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-06-2022.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-03-2022.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 31-12-2021.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary - 30-06-2021.pdf | 7 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2021-22.pdf | 7 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23.pdf | 7 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-24.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q4 22-23.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q1 23-24.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q2 23-24.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q3 23-24.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q4 23-24.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q1 24-25.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q2 24-25.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate Q3 22-23.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Enginners Certificate Q2 2024-25.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Enginners Certificate Q1 2024-25.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Enginners Certificate Q3 2023-24.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham F2 30-6-23.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Enginners Certificate Q4 2023-24.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham Q2 2024-25_compressed.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham Q1 24-25_compressed.pdf | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Gruham F5 31-3-24 Signed.pdf | 28 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham F2 31-3-23.pdf | 2 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F2 30-6-23.pdf | 2 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham F3 31-3-23.pdf | 17 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gruham F5 31-3-23.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate 07-07-2021.pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architecht Certificite 31-12-2021.pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architecht Certificite 31-03-2022.pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architecht Certificite 30-06-2022.pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gruham Architect Certificate 30-09-2022.pdf | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dt 05-07-2021.pdf | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Engineer Certificate 31-03-2022.pdf | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Engineer Certififate 30-06-2022.pdf | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Engineer Certificate 30-09-2022.pdf | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gruham Engineer Certificate 31-12-2022.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gruham Form 3 Dt - 31-12-2021_compressed.pdf | 17 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
Keep GRUHAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Srinivas Colony uttara nagar4,100+ in Nashik
Anandvan Housing Complex
Ravi Mahajan Buildcon LLP
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: DEEPAK RAMCHANDRA BAGAD
DEEPAK RAMCHANDRA BAGAD has 2 registrations on MahaRERA, including THE CAPITOL and GRUHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if GRUHAM is delayed beyond 31 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GRUHAM?
The registered promoter entity is DEEPAK RAMCHANDRA BAGAD, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GRUHAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GRUHAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GRUHAM?
The professionals named in the filing: Architect: RAVI AMRUTKAR and ASSOCIATES Amrutkar; Engineer: Vinayak Dayaram Kale; Engineer: Bapu Fatanagre; Chartered Accountant: A.S. KOTHAWADE AND CO.; Chartered Accountant: A R N R AND ASSOCIATES; Chartered Accountant: Rahul Nawandar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GRUHAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback