Grove Towers
By Ornate Spaces Private Limited
RG-MH-26963 · RERA P51900009142 · Last updated on MahaRERA portal: 3 Dec 2019
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 23 months past the filed date
- 4 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Grove Towers is a Others project by Ornate Spaces Private Limited in 400014, registered with MahaRERA as P51900009142 on 19 Aug 2017. Possession was promised by 29 Nov 2024 and is now 23 months past that date. 4 complaints are on record with the regulator.
At a glance
Project
- NameGrove Towers
- TypeOthers
- Location
- 400014
- Pincode400014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900009142
- ReraGenie IDRG-MH-26963
Builder
- NameOrnate Spaces Private Limited
- Entity typeCompany
- Managing DirectorsVijay Machindar, Komal Machindar
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion29 Nov 2024
- Revised completionNone
- Buildings2 building records
- Documents filed30 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | NA | 40 | 0 | 0 | 0 | 0 |
| Tower 2 | NA | 48 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 92%.
Tower 18%
| Activity | Progress |
|---|---|
| Excavation | 92% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 28%
| Activity | Progress |
|---|---|
| Excavation | 92% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed857
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower 1 | 190 | 190 |
| Tower 2 | 667 | 667 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sandeep Shikre & Asssociates |
| Partner | Role in project |
|---|---|
| Ornate Spaces Private Limited | - |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192184 | UTI EMPLOYEE SAI SAMRUDDHI CO-OPERATIVE HOUSING SOCIETY LTD | ORNATE SPACES PRIVATE LIMITED | 14/01/2020 |
| CC006000000141135 | PNB Housing Finance Limited | Ornate Spaces Private Limited | 03/10/2019 |
| CC006000000194078 | Aarif Ahsan Khan | Ornate Spaces Pvt. Ltd | 18/09/2020 |
| CC006000000199087 | Mr Mohammed Aarif Khan | Ornate Spaces Pvt Ltd | 19/11/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed30
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrancesFile: ornate spaces.pdf | 3 Dec 2019 |
| Details of encumbrancesFile: CERTIFICATE OF REGISTRATION OF CHARGE.PDF | 26 Nov 2019 |
| Details of encumbrancesFile: Index II - PNB Loan.pdf | 26 Nov 2019 |
| Building plan approvalFile: Declaration_.pdf | 6 Nov 2018 |
| Building plan approvalFile: SP-A-TYPICAL FLOOR_LOWER LEVEL-Model.pdf | 6 Nov 2018 |
| Building plan approvalFile: SP-A-TYPICAL FLOOR_UPPER LEVEL-Model.pdf | 6 Nov 2018 |
| Building plan approvalFile: SP-A-REFUGE FLOOR_UPPER LEVEL-Model.pdf | 6 Nov 2018 |
| Building plan approvalFile: SP-A-REFUGE FLOOR_LOWER LEVEL-Model.pdf | 6 Nov 2018 |
| Building plan approvalFile: SP-A-GROUND LEVEL- RETAIL-Model.pdf | 6 Nov 2018 |
| Building plan approvalFile: SP-A-GROUND LEVEL- RETAIL-Model.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: Declaration_.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: SP-A-TYPICAL FLOOR_LOWER LEVEL-Model.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: SP-A-TYPICAL FLOOR_UPPER LEVEL-Model.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: SP-A-REFUGE FLOOR_UPPER LEVEL-Model.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: SP-A-REFUGE FLOOR_LOWER LEVEL-Model.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: SP-A-GROUND LEVEL- RETAIL-Model.pdf | 6 Nov 2018 |
| Building Plan Approval (IOD)File: SP-A-GROUND LEVEL- RETAIL-Model.pdf | 6 Nov 2018 |
| Layout approvalFile: Declaration for Layout.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Declaration for Layout.pdf | 30 Jul 2017 |
| Building plan approvalFile: AMENDED REPORT.pdf | 29 Jul 2017 |
| PAN CardFile: OSPL PAN CARD.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Report - DV Associates.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Piramal Mortgage - Index II.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: AMENDED REPORT.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Issued Copy.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B compressed.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: compressed_Form 1 _Architect Certificate_Ornate Spaces.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: Form_3_-_CA_Certificate_compressed.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Agreement for Sale Declaration.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 30 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Grove Towers on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 55 registered projects within 2 km.
Monopoli
Mathuresh Infrapro Private Ltd
The Baya Sunrise
RENAISSANCE SPACES
RA RESIDENCES
R A ASSOCIATES
PANCHRATNA-NX
SUDHIR KISHOR DESAI
Ratan Infinia
Shree Shankheshwar Enterprises
EL MEJOR
ARTH REALTECH SPACES PVT LTD
Builder: Ornate Spaces Private Limited
Ornate Spaces Private Limited has 1 registration on MahaRERA, including Grove Towers. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that Grove Towers shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Grove Towers is delayed beyond 29 Nov 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Grove Towers?
The registered promoter entity is Ornate Spaces Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Grove Towers?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Grove Towers?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Grove Towers?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Grove Towers?
The professionals named in the filing: Architect: Sandeep Shikre & Asssociates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Grove Towers?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.