Home / Browse projects / Aurangabad, Maharashtra / Green Space Residency (Project-1) A Building

Registration lapsed No litigation declared Others project

Green Space Residency (Project-1) A Building

By Marathwada Constructions Pvt Ltd

RG-MH-00514 · RERA P51500009980 · Last updated on MahaRERA portal: 6 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

Green Space Residency (Project-1) A Building is a Others project by Marathwada Constructions Pvt Ltd in Aurangabad, Maharashtra, registered with MahaRERA as P51500009980 on 23 Aug 2017. Possession was promised by 29 Jun 2024 and is now 28 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameGreen Space Residency (Project-1) A Building
  • TypeOthers
  • Location
    • MIT College to Khandoba Mandir Road
    • Satara Parisar
    • Satara (CT)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500009980
  • ReraGenie IDRG-MH-00514

Builder

  • NameMarathwada Constructions Pvt Ltd
  • Entity typeCompany
  • ChairpersonPratik Pramod Khairnar
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

28 months past promisethis monthRegisteredAug 2017First promiseJun 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Aug 2017
  • Promised completion29 Jun 2024
  • Revised completionRevised to 29 Jun 2024 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A Building: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 6 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Solar Water HeaterYes100%
LiftYes100%
CCTVYes100%
BattYes100%

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered43
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,535 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Nikhil Praful JedheAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI7526.82
Proposed, not sanctioned4,258 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchStation Road, Kanchan Chambers, Kranti Chowj, Station Road, Aurangabad 431005

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajaram Sahebrao Jadhav
EngineerRavindra Yashvant Bansode
PartnerRole in project
Marathwada Constructions Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500016790Jun 2023 → Jun 2024

Reason as filed by the promoterMahaRERA Authority Mumbai, Maharashtra Subject: Request for Project Extension - Green Space Residency Project 1 A Building Dear Sir/Madam, I am writing to formally request an extension for the completion date of the Green Space Residency Project 1 A Building, as per the guidelines and regulations set by MahaRERA. The original completion date was set for 30th June 2023, and we are seeking an extension until 29th June 2024. The reason for the delay in the project's completion is as follows: We have successfully completed the entire building and the common facilities and amenities in the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Nov 2024

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_6_24.pdf6 Dec 2024
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_24.pdf6 Dec 2024
Certificates of CA (Form 5)File: Form5_CA_certificate_GSR_31_3_24.pdf6 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_March24.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_June24.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_24.pdf24 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_24.pdf20 Nov 2024
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_3_24.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_9_24.pdf20 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Architect Certificaite_GSR_A.pdf19 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC GSR_7_11_24.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_3_24.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_6_24.pdf4 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Oc GSR Inward_5_6_24.pdf4 Jul 2024
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_23.pdf12 Apr 2024
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_23.pdf12 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_23.pdf29 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_12_23.pdf29 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_9_23.pdf29 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_12_23.pdf29 Feb 2024
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_3_23.pdf23 Nov 2023
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_6_23.pdf23 Nov 2023
Certificates of CA (Form 5)File: Form5_CA_certificate_GSR_31_3_23.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_6_23.pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_6_23.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_June23.pdf6 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A_GSR (A build) Eng Cert 2020.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A_GSR (A build) Eng Cert 2021.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_GSR (A build) Eng Cert 2022.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A_GSR (A build) Eng Cert 2023.pdf29 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_23.pdf14 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_3_23.pdf1 Jun 2023
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_22.pdf1 Jun 2023
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_22.pdf1 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_March23.pdf24 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_12_22.pdf17 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_9_22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_12_22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_Sept22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_Dec22.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_CA_Certificate_GSR_31_3_21.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_CA_Certificate_GSR_31_3_22.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18019.pdf7 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf7 Feb 2023
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_6_22.pdf22 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_6_22.pdf18 Sep 2022
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_3_22.pdf18 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_6_22.pdf1 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_June22.pdf1 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_22.pdf4 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_3_22.pdf4 Jul 2022
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_21.pdf6 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_March22.pdf21 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_Dec21.pdf5 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_12_21.pdf2 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_12_21.pdf2 Feb 2022
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_21.pdf26 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_21.pdf14 Oct 2021
Declaration about Commencement CertificateFile: GSR_MahaRERA_commencement_cert_formD.pdf13 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_Sept21.pdf13 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg_Certificate_GSR_30_9_21.pdf11 Oct 2021
Certificates of CA (Form 3)File: Form 2_Engg_Certificate_GSR_30_6_21.pdf31 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory_GSR_Aug-21.pdf26 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_6_21.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg_Certificate_GSR_30_6_21.pdf11 Aug 2021
Certificates of CA (Form 3)File: Form3_CA_certificate_HPR_30_6_20.pdf28 Jun 2021
Certificates of CA (Form 3)File: Form3_CA_certificate_HPR_30_9_20.pdf28 Jun 2021
Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_20.pdf28 Jun 2021
Certificates of CA (Form 3)File: Form 2_Engg_Certificate_GSR_31_3_21.pdf28 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_21.pdf21 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg_Certificate_GSR_31_3_21.pdf20 Apr 2021
Building plan approvalFile: GSR_Drawing_B Block_166_2021_1.pdf24 Feb 2021
Building plan approvalFile: GSR_Drawing_B Block_166_2021_2.pdf24 Feb 2021
Building plan approvalFile: GSR_Drawing_B Block_166_2021_3.pdf24 Feb 2021
Building Plan Approval (IOD)File: GSR_Drawing_B Block_166_2021_1.pdf24 Feb 2021
Building Plan Approval (IOD)File: GSR_Drawing_B Block_166_2021_2.pdf24 Feb 2021
Building Plan Approval (IOD)File: GSR_Drawing_B Block_166_2021_3.pdf24 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: GSR_CC_B Block_166_2020.pdf24 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_HPR_30_6_20.pdf4 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_20.pdf4 Jan 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shrihari SafalyaCTS 4598 Aurangpura Mahatma Phule Chowk Aurangabad 431000118CompletedDec 2015Dec 2015
Shri Ram Hari ComplexSN 8 Jadhav Wadi Pisa Devi Road Aurangabad- 43100148CompletedSep 2013Sep 2013

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 12 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Green Space Residency (Project-1) A Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara Parisar1,400+ in Aurangabad

2 kmGreen Space Residency (PCompleted 43Lapsed / revoked 30Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: Marathwada Constructions Pvt Ltd

Marathwada Constructions Pvt Ltd has 3 registrations on MahaRERA, including Green Space Residency (Project-1) A Building and GREEN SPACE RESIDENCY PROJECT 1 B BLOCK. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that Green Space Residency (Project-1) A Building shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Green Space Residency (Project-1) A Building is delayed beyond 29 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Space Residency (Project-1) A Building?

The registered promoter entity is Marathwada Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Space Residency (Project-1) A Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Space Residency (Project-1) A Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Space Residency (Project-1) A Building?

The professionals named in the filing: Architect: Rajaram Sahebrao Jadhav; Engineer: Ravindra Yashvant Bansode. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Space Residency (Project-1) A Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Space Residency (Project-1) A Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Space Residency (Project-1) A Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.