Home / Browse projects / Aurangabad, Maharashtra / Green Space Residency (Project-1) A Building
Green Space Residency (Project-1) A Building
By Marathwada Constructions Pvt Ltd
RG-MH-00514 · RERA P51500009980 · Last updated on MahaRERA portal: 6 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green Space Residency (Project-1) A Building is a Others project by Marathwada Constructions Pvt Ltd in Aurangabad, Maharashtra, registered with MahaRERA as P51500009980 on 23 Aug 2017. Possession was promised by 29 Jun 2024 and is now 28 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameGreen Space Residency (Project-1) A Building
- TypeOthers
- Location
- MIT College to Khandoba Mandir Road
- Satara Parisar
- Satara (CT)
- Aurangabad
- 431005
- Pincode431005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500009980
- ReraGenie IDRG-MH-00514
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Aug 2017
- Promised completion29 Jun 2024
- Revised completionRevised to 29 Jun 2024 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed136 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
A Building: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 6 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| Solar Water Heater | Yes | 100% |
| Lift | Yes | 100% |
| CCTV | Yes | 100% |
| Batt | Yes | 100% |
Parking filed47
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Nikhil Praful Jedhe | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajaram Sahebrao Jadhav |
| Engineer | Ravindra Yashvant Bansode |
| Partner | Role in project |
|---|---|
| Marathwada Constructions Pvt Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterMahaRERA Authority Mumbai, Maharashtra Subject: Request for Project Extension - Green Space Residency Project 1 A Building Dear Sir/Madam, I am writing to formally request an extension for the completion date of the Green Space Residency Project 1 A Building, as per the guidelines and regulations set by MahaRERA. The original completion date was set for 30th June 2023, and we are seeking an extension until 29th June 2024. The reason for the delay in the project's completion is as follows: We have successfully completed the entire building and the common facilities and amenities in the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Nov 2024
Documents filed136
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_6_24.pdf | 6 Dec 2024 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_24.pdf | 6 Dec 2024 |
| Certificates of CA (Form 5)File: Form5_CA_certificate_GSR_31_3_24.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_March24.pdf | 30 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_June24.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_24.pdf | 24 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_24.pdf | 20 Nov 2024 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_3_24.pdf | 20 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_9_24.pdf | 20 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Architect Certificaite_GSR_A.pdf | 19 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC GSR_7_11_24.pdf | 19 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_3_24.pdf | 4 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_6_24.pdf | 4 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Oc GSR Inward_5_6_24.pdf | 4 Jul 2024 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_23.pdf | 12 Apr 2024 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_23.pdf | 12 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_23.pdf | 29 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_12_23.pdf | 29 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_9_23.pdf | 29 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_12_23.pdf | 29 Feb 2024 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_3_23.pdf | 23 Nov 2023 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_6_23.pdf | 23 Nov 2023 |
| Certificates of CA (Form 5)File: Form5_CA_certificate_GSR_31_3_23.pdf | 22 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_6_23.pdf | 6 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_6_23.pdf | 6 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_June23.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A_GSR (A build) Eng Cert 2020.pdf | 29 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A_GSR (A build) Eng Cert 2021.pdf | 29 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_GSR (A build) Eng Cert 2022.pdf | 29 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A_GSR (A build) Eng Cert 2023.pdf | 29 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_23.pdf | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_3_23.pdf | 1 Jun 2023 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_22.pdf | 1 Jun 2023 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_22.pdf | 1 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_March23.pdf | 24 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_12_22.pdf | 17 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_9_22.pdf | 16 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_12_22.pdf | 16 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_Sept22.pdf | 16 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_Dec22.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_CA_Certificate_GSR_31_3_21.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_CA_Certificate_GSR_31_3_22.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18019.pdf | 7 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf | 7 Feb 2023 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_6_22.pdf | 22 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_6_22.pdf | 18 Sep 2022 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_3_22.pdf | 18 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_30_6_22.pdf | 1 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_A_June22.pdf | 1 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_22.pdf | 4 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_3_22.pdf | 4 Jul 2022 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_21.pdf | 6 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_March22.pdf | 21 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_Dec21.pdf | 5 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_12_21.pdf | 2 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg's_Certificate_GSR_31_12_21.pdf | 2 Feb 2022 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_30_9_21.pdf | 26 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_21.pdf | 14 Oct 2021 |
| Declaration about Commencement CertificateFile: GSR_MahaRERA_commencement_cert_formD.pdf | 13 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Inventory_GSR_Sept21.pdf | 13 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg_Certificate_GSR_30_9_21.pdf | 11 Oct 2021 |
| Certificates of CA (Form 3)File: Form 2_Engg_Certificate_GSR_30_6_21.pdf | 31 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory_GSR_Aug-21.pdf | 26 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_6_21.pdf | 11 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg_Certificate_GSR_30_6_21.pdf | 11 Aug 2021 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_HPR_30_6_20.pdf | 28 Jun 2021 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_HPR_30_9_20.pdf | 28 Jun 2021 |
| Certificates of CA (Form 3)File: Form3_CA_certificate_GSR_31_12_20.pdf | 28 Jun 2021 |
| Certificates of CA (Form 3)File: Form 2_Engg_Certificate_GSR_31_3_21.pdf | 28 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_31_3_21.pdf | 21 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg_Certificate_GSR_31_3_21.pdf | 20 Apr 2021 |
| Building plan approvalFile: GSR_Drawing_B Block_166_2021_1.pdf | 24 Feb 2021 |
| Building plan approvalFile: GSR_Drawing_B Block_166_2021_2.pdf | 24 Feb 2021 |
| Building plan approvalFile: GSR_Drawing_B Block_166_2021_3.pdf | 24 Feb 2021 |
| Building Plan Approval (IOD)File: GSR_Drawing_B Block_166_2021_1.pdf | 24 Feb 2021 |
| Building Plan Approval (IOD)File: GSR_Drawing_B Block_166_2021_2.pdf | 24 Feb 2021 |
| Building Plan Approval (IOD)File: GSR_Drawing_B Block_166_2021_3.pdf | 24 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: GSR_CC_B Block_166_2020.pdf | 24 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_HPR_30_6_20.pdf | 4 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ArchitectsCertificate_GSR_30_9_20.pdf | 4 Jan 2021 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shrihari Safalya | CTS 4598 Aurangpura Mahatma Phule Chowk Aurangabad 4310001 | 18 | Completed | Dec 2015 | Dec 2015 |
| Shri Ram Hari Complex | SN 8 Jadhav Wadi Pisa Devi Road Aurangabad- 431001 | 48 | Completed | Sep 2013 | Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 136 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Green Space Residency (Project-1) A Building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Satara Parisar1,400+ in Aurangabad
Filed coordinates, straight-line distance. 106 registered projects within 2 km.
One World Phase I
SIMAR PRIDE VENTURES LLP
The Solitairee Phase I
Dizzi Land Farms Private Limited
Neo Orbit
Piyush Infratech Pvt.Ltd.
180 and 51 Greens
A.M.PATEL INFRA PVT LTD
MILLENNIUM BUSINESS CENTER
MILLENNIUMPRO NEST LLP
The Solitairee Phase II
Dizzi Land Farms Private Limited
See every Aurangabad project, with the district possession charts
Builder: Marathwada Constructions Pvt Ltd
Marathwada Constructions Pvt Ltd has 3 registrations on MahaRERA, including Green Space Residency (Project-1) A Building and GREEN SPACE RESIDENCY PROJECT 1 B BLOCK. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that Green Space Residency (Project-1) A Building shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Green Space Residency (Project-1) A Building is delayed beyond 29 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green Space Residency (Project-1) A Building?
The registered promoter entity is Marathwada Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green Space Residency (Project-1) A Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Green Space Residency (Project-1) A Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green Space Residency (Project-1) A Building?
The professionals named in the filing: Architect: Rajaram Sahebrao Jadhav; Engineer: Ravindra Yashvant Bansode. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Space Residency (Project-1) A Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.