ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / GREEN ORIGIN

Registered No litigation declared Residential / Group Housing project

GREEN ORIGIN

By SHREEJI REALTIES PRIVATE LIMITED

RG-MH-06271 · RERA P51800052282 · Last updated on MahaRERA portal: 30 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2029Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 10%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

GREEN ORIGIN is a Residential / Group Housing project by SHREEJI REALTIES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052282 on 9 Aug 2023. Possession is promised by 15 Aug 2029.

At a glance

Project

  • NameGREEN ORIGIN
  • TypeResidential / Group Housing
  • Location
    • AT BAL RAJESHAR ROAD
    • MULUND WEST
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • RERA no.P51800052282
  • ReraGenie IDRG-MH-06271

Builder

  • NameSHREEJI REALTIES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSANJAY SAMPATKUMAR JAIN, KAVITA SANJAY JAIN, KRISHNA SANJAY KUMAR JAIN, YASHVI SANJAY JAIN
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2023PromisedAug 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion15 Aug 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GREEN ORIGIN - A WINGNA100000
GREEN ORIGIN - B WINGNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

GREEN ORIGIN - A WING46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GREEN ORIGIN - B WING46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered124
BuildingClosed/CoveredTotal
GREEN ORIGIN - A WING6262
GREEN ORIGIN - B WING6262

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,237 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VENUS TILES AND MARBLES MANUFACTURING PVT LTDMulundMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI9375.61
Proposed, not sanctioned3,000 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRustomjee, central park, B Wing, Ground Floor, Andheri Kurla road, chakala, andheri east, mumbai 400059

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. NASA Architectural Consultants Pvt Ltd.
EngineerMADHUSUDAN D. SHAH
Chartered AccountantAGRAWAL RINKU AND ASSOCIATES
PartnerRole in project
SHREEJI REALTIES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Aug 2029

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.PDF30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.PDF30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.PDF30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.PDF30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.PDF30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.PDF30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Invnentory disclosure.PDF1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.PDF20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.PDF19 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate 2A.PDF19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.PDF19 Jun 2024
Details of encumbrances concerned to FinanceFile: RERA Encumbrance.PDF7 Jun 2024
Details of encumbrances concerned to LegalFile: RERA Encumbrance.PDF7 Jun 2024
Proforma of Agreement for saleFile: Draft Sale Agreement with AU Clause (1).pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30th Sept Updated.PDF23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.PDF23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.PDF23 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure 30 sept.PDF23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30 sept uodated.PDF23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.PDF23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Sep 23.PDF22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23.PDF19 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory.PDF25 Sep 2023
Layout approvalFile: Proposed Plan (As per CFO)_1-1.pdf15 Sep 2023
Layout approvalFile: Proposed Plan (As per CFO)_2-3.pdf15 Sep 2023
Layout approvalFile: Proposed Plan (As per CFO)_4-end.pdf15 Sep 2023
Copy of Layout Approval (in case of layout)File: Proposed Plan (As per CFO)_1-1.pdf15 Sep 2023
Copy of Layout Approval (in case of layout)File: Proposed Plan (As per CFO)_2-3.pdf15 Sep 2023
Copy of Layout Approval (in case of layout)File: Proposed Plan (As per CFO)_4-end.pdf15 Sep 2023
Proforma of Agreement for saleFile: FINAL AGREEMENT - GREEN ORIGIN.pdf24 Jul 2023
Layout approvalFile: drawing--1--1-1_Compressed.pdf6 Jul 2023
Layout approvalFile: Drawing (1)_2-2.pdf6 Jul 2023
Layout approvalFile: Drawing (1)_3-3.pdf6 Jul 2023
Layout approvalFile: Drawing (1)_4-end.pdf6 Jul 2023
Copy of Layout Approval (in case of layout)File: drawing--1--1-1_Compressed.pdf6 Jul 2023
Copy of Layout Approval (in case of layout)File: Drawing (1)_2-2.pdf6 Jul 2023
Copy of Layout Approval (in case of layout)File: Drawing (1)_3-3.pdf6 Jul 2023
Copy of Layout Approval (in case of layout)File: Drawing (1)_4-end.pdf6 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.PDF6 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report NEW CHANGES.PDF6 Jul 2023
Building plan approvalFile: IOD LETTER.pdf5 Jul 2023
PAN CardFile: company pan.pdf5 Jul 2023
Copy of the legal title reportFile: Title Certificate Rera Mulund.PDF5 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance (2).PDF5 Jul 2023
Details of encumbrances concerned to LegalFile: No Encumbrance (2).PDF5 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD LETTER.pdf5 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf5 Jul 2023
Declaration about Commencement CertificateFile: CC DECLARATION NEW.PDF5 Jul 2023
Declaration in FORM BFile: FORM B Developer.PDF5 Jul 2023
CERSAI detailsFile: Cersai Undertaking.PDF5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mulund Rera CA Certificate Final.PDF5 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf5 Jul 2023
Proforma of Allotment letterFile: allotment letter (2).pdf5 Jul 2023
Deviation Report with respect to Allotment letterFile: No Deviation.PDF5 Jul 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GREEN ORIGIN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

Builder: SHREEJI REALTIES PRIVATE LIMITED

Shreeji Realties Private Limited has 3 registrations on MahaRERA, including Kisna and Sanjay Building. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GREEN ORIGIN is delayed beyond 15 Aug 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GREEN ORIGIN?

The registered promoter entity is SHREEJI REALTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GREEN ORIGIN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GREEN ORIGIN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GREEN ORIGIN?

The professionals named in the filing: Architect: M/s. NASA Architectural Consultants Pvt Ltd.; Engineer: MADHUSUDAN D. SHAH; Chartered Accountant: AGRAWAL RINKU AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN ORIGIN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN ORIGIN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN ORIGIN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.