Grande Edifice
RG-MH-40895 · RERA P51800005896 · Last updated on MahaRERA portal: 26 Nov 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Grande Edifice is a Others project by V6 ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005896 on 14 Aug 2017. Possession is promised by 30 Dec 2026.
At a glance
Project
- NameGrande Edifice
- TypeOthers
- Location
- AKURLI ROAD
- KANDIVALI EAST
- Akurli
- Borivali
- Mumbai Suburban
- 400101
- Pincode400101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005896
- ReraGenie IDRG-MH-40895
Builder
- NameV6 ENTERPRISES
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GRANDE EDIFICE | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.
GRANDE EDIFICE: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 26 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed83
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shri Yomesh Rao |
| Engineer | Shri Nikhil Shanghvi - Shanghvi & Associates consultants (P) Ltd. |
| Partner | Role in project |
|---|---|
| V6 ENTERPRISES | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 153/2015 | Mumbai High Court | disposed off |
| 194/2015 | Mumbai High Court | disposed off |
| 864/2016 | Mumbai High Court | Dismissed |
| 422/2017 | Mumbai High Court | Pre admission |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Jul 2023
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Proforma of Agreement for saleFile: 6a - Agreement for Sale - draft -.pdf | 26 Nov 2024 |
| Copy of the legal title reportFile: Title Certificate.pdf | 22 Nov 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 5 Jun 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Grande Edifice Reg certificate.pdf | 5 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Annual Report 2022- 2023.pdf | 22 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual Report 2022- 2023.pdf | 22 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Grande Edifice -Inventory - till June, 2023.pdf | 13 Oct 2023 |
| OtherFile: Other legal.pdf | 11 Aug 2023 |
| Building plan approvalFile: Occupation Plan.pdf | 28 Jul 2023 |
| Copy of the legal title reportFile: Title Certificate.pdf | 28 Jul 2023 |
| Building Plan Approval (IOD)File: Occupation Plan.pdf | 28 Jul 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 27 Jul 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation cum building completion Certificate.pdf | 27 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 45 - YMS ARCHITECH CERTIFICATE JAN- MARCH -23.pdf | 24 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2.pdf | 24 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER FORM 2A.pdf | 24 Jul 2023 |
| Certificates of CA (Form 3)File: V6-CA CERTFICIATE UPTO MARCH.pdf | 24 Jul 2023 |
| Building plan approvalFile: Amend plan letter.pdf | 3 Apr 2023 |
| Building plan approvalFile: Amend Plan 1.pdf | 3 Apr 2023 |
| Building plan approvalFile: Amend Plan 2.pdf | 3 Apr 2023 |
| Building plan approvalFile: Amend Plan 3.pdf | 3 Apr 2023 |
| Building Plan Approval (IOD)File: Amend plan letter.pdf | 3 Apr 2023 |
| Building Plan Approval (IOD)File: Amend Plan 1.pdf | 3 Apr 2023 |
| Building Plan Approval (IOD)File: Amend Plan 2.pdf | 3 Apr 2023 |
| Building Plan Approval (IOD)File: Amend Plan 3.pdf | 3 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: C C 8th floor LMR OHT.pdf | 3 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Grande Edifice Inventory.pdf | 27 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1.pdf | 10 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Form 2 till Dec 2022.pdf | 10 Mar 2023 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 till Dec 2022.pdf | 10 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 17 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 17 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 1 - FORM 5 FY 2017-2018_compressed.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2- FORM 5 FY 2019-2020_compressed.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 3 - FORM 5 FY 2020-2021_compressed.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 4 - FORM 5 FY 2021-2022_compressed.pdf | 10 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect cert Form 1.pdf | 23 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert FORM 2.pdf | 23 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificate FORM 3.pdf | 23 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale Draft.pdf | 23 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 11 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 11 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 11 Jan 2023 |
| Declaration about Commencement CertificateFile: 1a - Declaration cc - Form - D.pdf | 22 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Form 1.pdf | 22 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2.pdf | 22 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Form 2A.pdf | 22 Aug 2022 |
| CERSAI detailsFile: 2 - CERSAI Report.pdf | 22 Aug 2022 |
| Certificates of CA (Form 3)File: CA Certificate - Form 3.pdf | 22 Aug 2022 |
| OtherFile: Declaration Name other informatin.pdf | 22 Aug 2022 |
| Copy of the legal title reportFile: Title Certificate.pdf | 5 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 22 Feb 2022 |
| Proforma of Allotment letterFile: Agreement for sale.pdf | 22 Feb 2022 |
| Copy of the legal title reportFile: Title Certificate -Grande Edifice11_Compressed.pdf | 20 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 3 Dec 2021 |
| Building plan approvalFile: Amended plan drawing 02.pdf | 21 Sep 2021 |
| Building plan approvalFile: Amended Plan approval letter.pdf | 21 Sep 2021 |
| Building plan approvalFile: Amended plan drawing - 1.pdf | 21 Sep 2021 |
| Building plan approvalFile: Amended plan drawing - 3.pdf | 21 Sep 2021 |
| Building Plan Approval (IOD)File: Amended Plan approval letter.pdf | 21 Sep 2021 |
| Building Plan Approval (IOD)File: Amended plan drawing - 1.pdf | 21 Sep 2021 |
| Building Plan Approval (IOD)File: Amended plan drawing 02.pdf | 21 Sep 2021 |
| Building Plan Approval (IOD)File: Amended plan drawing - 3.pdf | 21 Sep 2021 |
| Declaration about Commencement CertificateFile: Amended plan drawing - 3.pdf | 21 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate.pdf | 6 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate.pdf | 6 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate_compressed_compressed.pdf | 6 Aug 2021 |
| Building plan approvalFile: Amended letter.pdf | 4 Mar 2021 |
| Building plan approvalFile: Amended Plan-1.pdf | 4 Mar 2021 |
| Building plan approvalFile: Amended Plan-2.pdf | 4 Mar 2021 |
| Building plan approvalFile: Amended Plan-3.pdf | 4 Mar 2021 |
| Building Plan Approval (IOD)File: Amended letter.pdf | 4 Mar 2021 |
| Building Plan Approval (IOD)File: Amended Plan-1.pdf | 4 Mar 2021 |
| Building Plan Approval (IOD)File: Amended Plan-2.pdf | 4 Mar 2021 |
| Building Plan Approval (IOD)File: Amended Plan-3.pdf | 4 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 10 Jan 2020 |
| Building plan approvalFile: Amended building Plan 1 of 4.pdf | 28 Sep 2019 |
| Building plan approvalFile: Amended building Plan 2 of 4.pdf | 28 Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Grande Edifice on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANDIVALI EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 391 registered projects within 2 km.
Sheetal Uptown
SIDHESHWAR LIFESPACES PRIVATE LIMITED
ENSO SANZA
Sai Aastha Developers
SPRINGWOODS
PRATIK CONSTRUCTION
Godrej Nest
Shivam Megastructures Pvt Ltd
PATON TOWERS
PRAVIN VIRAM SATRA
Godrej Bliss
SHIVAM DEVELOPERS
See every Mumbai Suburban project, with the district possession charts
Builder: V6 ENTERPRISES
V6 ENTERPRISES has 1 registration on MahaRERA, including Grande Edifice. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Grande Edifice is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Grande Edifice?
The registered promoter entity is V6 ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Grande Edifice?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Grande Edifice?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Grande Edifice?
The professionals named in the filing: Architect: Shri Yomesh Rao; Engineer: Shri Nikhil Shanghvi - Shanghvi & Associates consultants (P) Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Grande Edifice?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback