Red flags

  • Litigation declared, 4 cases
  • 57 complaints at MahaRERA
  • Completion date moved by 40 months
  • 1 extension taken
  • Rs 1,200.00 crore secured on the land, in favour of Beacon Trusteeship Limited as Trustee

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 40 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 1%
192 of 360Units unsoldnot recorded sold or booked
57Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Grand Slam and Game Point is a Residential / Group Housing project by Ricardo Constructions Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005668 on 11 Aug 2017. Possession is promised by 30 Apr 2028. The completion date has moved by 40 months from the original filing. 168 of the 360 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 57 complaints are on record with the regulator.

At a glance

Project

  • NameGrand Slam and Game Point
  • TypeResidential / Group Housing
  • Location
    • JSD ROAD
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005668
  • ReraGenie IDRG-MH-12062

Builder

  • NameRicardo Constructions Private Limited
  • Entity typeCompany
  • DirectorsSunita Khanna, Sreeram Kuppa
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed74 files

Current status

47%168 of 360 units booked
5.1%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GRAND SLAM AND GAME POINTNA48403600360

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 1%.

GRAND SLAM AND GAME POINT: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed435

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots435
Closed/Covered435

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,008 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBeacon Trusteeship Limited as Trustee
Secured amountRs 1,200.00 crore
CERSAI search filedYes
Declared on2 Apr 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI31000.0
Proposed, not sanctioned984 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Jehangir Building, M G Road, Fort, Mumbai- 400001
Estimated costRs 118.05 cr
Cost incurredRs 6.01 cr
Work done5.09%
BuildingWingEstimatedIncurred
GRAND SLAM AND GAME POINTNARs 112.05 crRs 6.01 cr
-NARs 6.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDaisaria Associates
EngineerUmadevan Chinnathambi
EngineerAmarnath Shetty
Chartered AccountantM R B & Associates
Chartered AccountantB R Nagda & Co
PartnerRole in project
Ricardo Constructions Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019513Dec 2024 → Apr 2028

Reason as filed by the promoterDear Sir/ Madam, Please find enclosed following documents for processing our extension application request: a) Tab 1 & 2 - Resolution of the Association of Allottees: Format B- Cover Letter & List of Consents (Exhibit E) b) Tab 3 to 107 - Resolution of the Association of Allottees: 105 no. of consents. c) Tab 108 to 112 - Others: Form E, Exhibit A, B, C & D d) Tab 113- Response to the queries raised by MahaRERA e) Tab 114- Affidavit cum Declaration in Form B for proposed RERA Completion Date f) Tab 115- Latest Form 1, 2 & 3. g) Tab 116- Disclosure of Inventory Report h) Tab 117- Declaration ab

Litigation declared4

CaseCourtStatus
CC/805/15/2015Honrable State Consumer Disputes Redressal Commission MumbaiOngoing
AT006000000144425/2023Maharashtra Real Estate Appellate Tribunal (MahaREAT)Ongoing
AT006000000144426/2023Maharashtra Real Estate Appellate Tribunal (MahaREAT)Ongoing
AT006000000144427/2023Maharashtra Real Estate Appellate Tribunal (MahaREAT)Ongoing

Complaints filed with MahaRERA57

Case no.ComplainantRespondentFiled
CC006000000194892PRASHANT GAWADERICARDO CONSTRUCTION PVT LTD12/11/2020
CC006000000012338Mr. Maulik Kirti MehtaNirmal Lifestyle Limited11/12/2017
CC006000000022840Jayeshkumar JainNirmal Lifestyle Ltd10/01/2018
CC006000000044459Mrs. Vasudha Mukund DeshpandeM/s Nirmal Lifestyle Limited09/05/2018
CC006000000055589Mr Manoj Vishnu Dalvi and Mrs Vaishali Manoj DalviM/s Nirmal Lifestyle Pvt Ltd03/08/2018
CC006000000056400Rahul Arun Bhirud & Arun Laxman BhirudMs. Nirmal Lifestyle Ltd01/10/2018
CC006000000068166Mr Sunil Suresh PotdarM/s Nirmal lifestyle (Kalyan) Pvt Ltd02/03/2019
CC006000000193970GRAND SLAM AND GAME POINT WELFARE ASSOCIATIONRicardo Construction Pvt.Ltd10/09/2020
CC006000000194020PRASAD PRABHURICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194024KISHORE KUSHALCHAND SHAHRICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194023AMRUTPAL ANAND SOMRICARDO CONSTRUCTION PRIVATE LIMITED03/10/2020
CC006000000194025JEBA ANAND DEVMANI NADARRICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194027SHAILESH KISAN FIRAKERICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194057SURAJIT SHAKTI MAKURRICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194058VISHAL VITTAL NAYAKRICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194059JULESH DIVAKAR PINGLERICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194060JAHAR LAL SAHARICARDO CONSTRUCTION PRIVATE LIMITED03/10/2020
CC006000000194062CLOTILDA JOSEPH CARDOZARICARDO CONSTRUCTION PVT.LTD22/09/2020
CC006000000194182PRAVEEN JAINRICARDO CONSTRUCTION PVT.LTD26/09/2020
CC006000000194209JAYA S KOTIANRICARDO CONSTRUCTION PVT.LTD03/10/2020
CC006000000194183MANISH P THAKURRICARDO CONSTRUCTION PRIVATE LIMITED03/10/2020
CC006000000194210ASHOK PANDERICARDO CONSTRUCTION PRIVATE LIMITED03/10/2020
CC006000000194284RAJANI BABU ATHAWALERICARDO CONSTRUCTION PVT.LTD06/10/2020
CC006000000194587ZAHIR WYKESRICARDO CONSTRUCTION PVT LTD05/11/2020
CC006000000194307AMEY U PHAYDERICARDO CONSTRUCTION PVT.LTD07/10/2020
CC006000000194308RAKHI SINGHRICARDO CONSTRUCTION PVT.LTD06/10/2020
CC006000000194320AMIT PRAJAPATIRICARDO CONSTRUCTION PRIVATE LIMITED06/10/2020
CC006000000194322MUSTAK B ODIYARICARDO CONSTRUCTION PVT.LTD07/10/2020
CC006000000194323SUNDARARAJ MOOTHEDATHPADY KRISHNANRICARDO CONSTRUCTION PVT.LTD06/10/2020
CC006000000194317SNEHA PUNDLIK AWATERICARDO CONSTRUCTION PVT.LTD08/10/2020
CC006000000194324SUHAS NANASAHEB JADHAVRICARDO CONSTRUCTION PVT.LTD14/10/2020
CC006000000194361BHAGYSHREE HERAMBH KANADERICARDO CONSTRUCTION PVT.LTD15/10/2020
CC006000000194395DAGMA FERNANDESRICARDO CONSTRUCTIONS PRIVATE LIMITED15/10/2020
CC006000000194403RAJESH S CHOWTARICARDO CONSTRUCTION PVT LTD23/10/2020
CC006000000194405RAJAN SITARAM LOKERICARDO CONSTRUCTION PRIVATE LIMITED15/10/2020
CC006000000194419TUSHAR DIGAMBAR BHOLERICARDO CONSTRUCTION PVT LTD15/10/2020
CC006000000194420VIVEK PANDHARINATH KEDARERICARDO CONSTRUCTION PRIVATE LIMITED15/10/2020
CC006000000194435VIVEK RADHAKRISHNANRICARDO CONSTRUCTION PRIVATE LIMITED17/10/2020
CC006000000194437SHAILESH DATTATRAYA CHAVANRICARDO CONSTRUCTION PRIVATE LIMITED17/10/2020
CC006000000194515SWAROOP SANJIVA SUVARNARICARDO CONSTRUCTION PVT LTD27/10/2020
CC006000000194590SUHAS VISHNU CHAUDHARIRICARDO CONSTRUCTION PVT LTD27/10/2020
CC006000000194535SANDEEP RAMJI SAXENARICARDO CONSTRUCTION PVT LTD24/10/2020
CC006000000194592TUSHAR LILADHAR CHAUDHARIRICARDO CONSTRUCTION PVT LTD28/10/2020
CC006000000194599NEETA AVINASH SHIKHARERICARDO CONSTRUCTION PVT LTD23/10/2020
CC006000000194660RUPALI ANAND BUTERICARDO CONSTRUCTION PVT LTD28/10/2020
CC006000000194661ANANDRAO POLRICARDO CONSTRUCTION PVT LTD28/10/2020
CC006000000194662RACHNA SHARMARICARDO CONSTRUCTION PVT LTD27/10/2020
CC006000000194666GANESH K IYERRICARDO CONSTRUCTION PRIVATE LIMITED27/10/2020
CC006000000194802JEEVAN J POLRICARDO CONSTRUCTION PVT LTD04/11/2020
CC006000000195652HT Media LimitedRicardo Constructions Private Limited16/01/2021
CC006000000195659HT Media LimitedRicardo Constructions Private Limited16/01/2021
CC006000000195660HT Media LimitedRicardo Constructions Private Limited16/01/2021
CC006000000194873VIJAYKUMAR HIRAMAN CHAUDHARYRICARDO CONSTRUCTION PVT LTD11/11/2020
CC006000000195272BAIJU KURIAN KANJIRKATTERICARDO CONSTRUCTION PVT LTD19/12/2020
CC006000000197094SEBASTIAN I DRICARDO CONSTRUCTION PVT.LTD28/05/2021
CC006000000199271Giridhar Venkataswamy GonhalRicardo Construction Pvt.Ltd04/12/2021
CC006000000374913GINISHA ARVIND TURENIRMAL DEVELOPERS23/03/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: GSGP- Form 2A- FY 25-26.pdf30 Jun 2026
Withdrawal Update Form 1File: GSGP- Form 1- Mar 2026.pdf22 Jun 2026
Withdrawal Update Form 2File: GSGP- Form 2- Mar 2026.pdf22 Jun 2026
Withdrawal Update Form 3File: GSGP- Form 3- March 2026.pdf22 Jun 2026
Form 1File: GSGP- Form 1- March 2025.pdf7 Apr 2026
Form 2File: GSGP- Form 2- March 2025.pdf7 Apr 2026
Form 3File: GSGP- Form 3- March 2025.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Game Point and Grand Slam_31st_March_2025.pdf7 Apr 2026
Self-declaration of Quarterly ProgressFile: GSGP- PPR- Mar 2025.pdf7 Apr 2026
Withdrawal Update Form 1File: GSGP- Form 1- June 2025.pdf7 Apr 2026
Withdrawal Update Form 1File: GSGP- Form 1- June 2025.pdf7 Apr 2026
Withdrawal Update Form 1File: GSGP- Form 1- Sept 2025.pdf7 Apr 2026
Withdrawal Update Form 1File: GSGP- Form 1- Dec 2025.pdf7 Apr 2026
Withdrawal Update Form 2File: GSGP- Form 2- June 2024.pdf7 Apr 2026
Withdrawal Update Form 2File: GSGP- Form 2- June 2025.pdf7 Apr 2026
Withdrawal Update Form 2File: GSGP- Form 2- Sept 2025.pdf7 Apr 2026
Withdrawal Update Form 2File: GSGP- Form 2- Dec 2025.pdf7 Apr 2026
Withdrawal Update Form 3File: GSGP- Form 3- June 2025.pdf7 Apr 2026
Withdrawal Update Form 3File: GSGP- Form 3- June 2025.pdf7 Apr 2026
Withdrawal Update Form 3File: GSGP- Form 3- Sept 2025.pdf7 Apr 2026
Withdrawal Update Form 3File: GSGP- Form 3- Dec 2025.pdf7 Apr 2026
Form 5 (FY 2024-2025)File: GSGP- Form 5- FY 24-25.pdf8 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSGP- PPR- Sept 2024.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSGP- Form 1- Sept 2024.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSGP- PPR- Dec 2024.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSGP- Form 1- Dec 2024.pdf18 Feb 2025
Certificates of CA (Form 3)File: GSGP- No Withdrawal- Sept 2024.pdf18 Feb 2025
Certificates of CA (Form 3)File: GSGP- Form 3- Sept 2024.pdf18 Feb 2025
Certificates of CA (Form 3)File: GSGP- No Withdrawal- Dec 2024.pdf18 Feb 2025
Certificates of CA (Form 3)File: GSGP- Form 3- Dec 2024.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSGP- Form 2- Sept 2024.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSGP- Form 2- Dec 2024.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GSGP- Form 5- FY 2023-24.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GSGP- Form 5- FY 2023-24.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSGP- Physical Report- June 2024.pdf31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: gsgp.pdf31 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSGP- Form 2- June 2024.pdf31 Jul 2024
Certificates of CA (Form 3)File: GSGP- No Withdrawal Declaration- June 2024.pdf31 Jul 2024
Certificates of CA (Form 3)File: GSGP- Form 3- June 2024 (reduced).pdf31 Jul 2024
CERSAI detailsFile: CERSAI Report- Ricardo- IOM- Mulund.pdf23 Jul 2024
Details of encumbrancesFile: GSGP- Encumbrance Letter- June 2024.pdf3 Jul 2024
Declaration in FORM BFile: GSGP- Affidavit cum Declaration Form B.pdf6 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidated and Original CC upto Oct 2024.pdf26 May 2024
Declaration about Commencement CertificateFile: GSGP- Declaration for Commencement Certificate.pdf26 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- GSGP- Mar 2024.pdf26 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSGP- Physical Report- March 2024.pdf26 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSGP- Engineer Certificate- Mar 24 (signed).pdf26 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GSGP- Declaration- Form 2A.pdf26 May 2024
Disclosure of sold/ booked inventoryFile: GSGP- Inventory Report- 31 Mar 2024.pdf26 May 2024
Certificates of CA (Form 3)File: GSGP- Form 3.pdf26 May 2024
Certificates of CA (Form 3)File: GSGP- Self Declaration for CA Certificate.pdf26 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GSGP- Form 5 (FY 22-23).pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GSGPL- Form 5- FY 21-22.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Grandslam and Gamepoint.pdf30 Sep 2021
Details of encumbrancesFile: Declaration of encumbrance-GSGP.pdf26 May 2021
Details of encumbrancesFile: Declaration of encumbrance-GSGP-2nd charge.pdf26 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GSGP- Form 5- FY 19-20.pdf7 Oct 2020
Details of Restarting of Construction work post lockdownFile: Grand Slam and Game Point.pdf1 Aug 2020
OtherFile: Format of Letter to Customer for Change of Promoter.pdf29 Jun 2019
Certificates of CA (Form 5)File: Grand Slam and Game Point Form 5.pdf25 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: coj-usopen-cc.pdf29 Mar 2018
Layout approvalFile: USOPEN GAMEPOINT PROPOSED LAYOUT.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: USOPEN GAMEPOINT PROPOSED LAYOUT.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 Grand Slam and Game Point.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Game Point Grand Slam Engineer Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Grand Slam Game Point.pdf30 Jul 2017
Building plan approvalFile: IOD-USOPEN.pdf29 Jul 2017
Layout approvalFile: USOpen(D-E)APPROVED LAYOUT.pdf29 Jul 2017
Copy of the legal title reportFile: Citi of Joy TC.pdf29 Jul 2017
Details of encumbrancesFile: Index_Piramal and HDFC_375 crores_NLL.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: USOpen(D-E)APPROVED LAYOUT.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD-USOPEN.pdf29 Jul 2017
Declaration in FORM BFile: grand slam and game point affidavit form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Grandslam GP.pdf29 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Relish, CherishCity Of Joy CTS No. 661-1-7 Jatashankar Road Mulund W Mumbai 400080332CompletedSep 2009Late, Mar 2010
Bliss, RejoiceCity Of Joy CTS No. 661-1-7 Jatashankar Road Mulund W Mumbai 400080332CompletedSep 2009Late, Mar 2010
Happyness, HurrahCity Of Joy CTS No. 661-1-7 Jatashankar Road Mulund W Mumbai 400080228CompletedJun 2007Late, Dec 2007
Celebration, SparkleCity Of Joy CTS No. 661-1-7 Jatashankar Road Mulund W Mumbai 400080228CompletedJun 2007Late, Dec 2007

How this compares with Mumbai Suburban

47%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 40 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Grand Slam and Game Point on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmGrand Slam and Game PoinCompleted 96Lapsed / revoked 82Other 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: Ricardo Constructions Private Limited

Ricardo Constructions Private Limited has 3 registrations on MahaRERA, including Ace and Matchpoint and Grand Slam and Game Point. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Grand Slam and Game Point is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Grand Slam and Game Point?

The registered promoter entity is Ricardo Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Grand Slam and Game Point?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Grand Slam and Game Point?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Grand Slam and Game Point?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Grand Slam and Game Point?

The professionals named in the filing: Architect: Daisaria Associates; Engineer: Umadevan Chinnathambi; Engineer: Amarnath Shetty; Chartered Accountant: M R B & Associates; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grand Slam and Game Point?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grand Slam and Game Point. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grand Slam and Game Point to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.