Home / Browse projects / Pune, Maharashtra / GRAFIKON OPULENCE
GRAFIKON OPULENCE
RG-MH-04682 · RERA P52100020385 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 51 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GRAFIKON OPULENCE is a Residential / Group Housing project by Trinetra Enterprise in Pune, Maharashtra, registered with MahaRERA as P52100020385 on 9 Apr 2019. Possession is promised by 31 Mar 2027. The completion date has moved by 51 months from the original filing. 1 of the 7 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameGRAFIKON OPULENCE
- TypeResidential / Group Housing
- Location
- Lane No. 2
- Salisbury Park
- Pune (M Corp.)
- Pune City
- Pune
- 411037
- Pincode411037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100020385
- ReraGenie IDRG-MH-04682
Builder
- NameTrinetra Enterprise
- Entity typePartnership
- PartnersAtul Bhagat, Anjali Atul Bhagat
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Apr 2019
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed196 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GRAFIKON OPULENCE | NA | 8 | 8 | 7 | 0 | 7 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
GRAFIKON OPULENCE: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GRAFIKON OPULENCE | NA | Rs 4.73 cr | Rs 4.73 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sachin Solnaki |
| Engineer | VIKAS KOLI |
| Chartered Accountant | Prashant Bansal |
| Partner | Role in project |
|---|---|
| Trinetra Enterprise | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterChange in Building Sanction Plans. Part development carried out and for this purpose we are requesting an extension till 31/03/2026.
Reason as filed by the promoterDue to change in development work still going on, we need some more time to get the project complete, for this purpose we are requesting an extension till 31/03/2027
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000096048 | Gazala Aminuddin Shaikh | Trinetra Enterprise | 09/04/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed196
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 196 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer Certificate Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Q2 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Q3 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Q2 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Q3 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form-3.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Q2 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Q3 2025.pdf | 23 Feb 2026 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 26 May 2025 |
| Other - TechnicalFile: PERT Chart.pdf | 26 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 31:03:23.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 30:06:23.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 30:09:23.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 31:12:23.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 31:03:24.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 30:06:24.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 30:09:24.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 31:12:24.pdf | 24 May 2025 |
| Certificates of CA (Form 3)File: Form 3 - 31:03:25.pdf | 24 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - FY 22-23.pdf | 24 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - FY 22-23.pdf | 24 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - FY 23-24.pdf | 24 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - FY 23-24.pdf | 24 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured loan for RERA.pdf | 24 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 - FY 24-25.pdf | 24 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31:12:2023.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31:03:2024.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30:06:2024.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30:09:2024.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31:12:2024.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31:03:2025.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30:09:2023.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31:12:2024.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31:03:2025.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30:09:2024.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30:06:2024.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31:03:2024.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31:12:2023.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30:09:2023.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 31:12:2022.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 31:03:2023.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 30:06:2023.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 30:09:2023.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 31:12:2023.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 31:03:2024.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 30:06:2024.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 30:09:2024.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold - 31:12:2024.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold 31:03:2025.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GO-Form 1 June 2023.pdf | 1 Sep 2023 |
| OtherFile: Reminder III.pdf | 1 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GO-Form 2- June 2023.pdf | 2 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GO-Form 2A - June 23.pdf | 2 Aug 2023 |
| OtherFile: Reminder II - 07-07-23 to Rera for Modified certificate.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Go-Form 1 -4-4-23.pdf | 30 May 2023 |
| OtherFile: GO-RERA Reminder I.pdf | 17 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GO-Form 2-4-4-23.pdf | 9 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GO-Form 2A -4-4-23.pdf | 9 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 -2021-22.pdf | 9 May 2023 |
| OtherFile: Rera reply - 03-04-2023 - 2nd show cause notice.pdf | 3 Apr 2023 |
| Certificates of CA (Form 3)File: GO Form 3 - 10012022 Dec 19.pdf | 17 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - FY-2021-22.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 - Q3-Sep 22.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 - Q4- Dec 22.pdf | 8 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - 06-02-23.pdf | 6 Feb 2023 |
| OtherFile: GO- Reply to RERA for Non submission of documents-compressed.pdf | 6 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4-2022-Engineer cert.pdf | 27 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3- 2022.pdf | 25 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4-2022.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Q4-2022.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Q4-2022 -2A.pdf | 25 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: GO- Form 5 - 17-18.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: GO- Form 5 - 18-19.pdf | 16 Dec 2022 |
| Declaration about Commencement CertificateFile: GO- Format D - Declaration for Commencement cert.pdf | 1 Dec 2022 |
| CERSAI detailsFile: GO- Cersai Undertaking 30-11-22.pdf | 1 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: GO- Sold Inventory.pdf | 1 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 196 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GRAFIKON OPULENCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Salisbury Park13,700+ in Pune
Filed coordinates, straight-line distance. 121 registered projects within 2 km.
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
Builder: Trinetra Enterprise
Trinetra Enterprise has 2 registrations on MahaRERA, including COLLINA CASA and GRAFIKON OPULENCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GRAFIKON OPULENCE is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GRAFIKON OPULENCE?
The registered promoter entity is Trinetra Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GRAFIKON OPULENCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GRAFIKON OPULENCE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GRAFIKON OPULENCE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GRAFIKON OPULENCE?
The professionals named in the filing: Architect: Sachin Solnaki; Engineer: VIKAS KOLI; Chartered Accountant: Prashant Bansal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GRAFIKON OPULENCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback