Home / Browse projects / Mumbai Suburban, Maharashtra / Grace Grandeur

Registered Litigation declared Residential / Group Housing project

Grace Grandeur

By GRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor)

RG-MH-69120 · RERA P51800010438 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA
  • Completion date moved by 76 months
  • 3 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 76 months from the original
46 of 69Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

Grace Grandeur is a Residential / Group Housing project by GRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010438 on 24 Aug 2017. Possession is promised by 30 Apr 2027. The completion date has moved by 76 months from the original filing. 23 of the 69 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGrace Grandeur
  • TypeResidential / Group Housing
  • Location
    • 0
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010438
  • ReraGenie IDRG-MH-69120

Builder

  • NameGRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor)
  • Entity typeOthers

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Aug 2017
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Dec 2020)
  • Buildings1 building record
  • Documents filed118 files

Current status

33%23 of 69 units booked
94.7%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and Wing BNA181069069

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Wing A and Wing B:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,428 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI4856.0
Proposed, not sanctioned2,428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRND AND MEZZANINE FLOOR, SHop No G 01, 893, Notan Chambers, Turner Road, Bandra West, Mumbai 50
Estimated costRs 28.03 cr
Cost incurredRs 26.54 cr
Work done94.66%
BuildingWingEstimatedIncurred
Wing A and Wing BNARs 26.04 crRs 24.60 cr
-NARs 2.00 crRs 1.94 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTaranath Shetty
ArchitectShakil Ghanchi
EngineerShakil Ghanchi
Chartered AccountantRishi Sekhri
Chartered AccountantRaviskumar Varma
Chartered AccountantVIVEK KOURCHAND JINDAL
Chartered AccountantVarma & Associates
PartnerRole in project
Grace Estate Development Venture-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010956Dec 2020 → Oct 2023

Reason as filed by the promoterThe project got delayed due to we are not received any approval from Competent authority.

EXT51800019844Dec 2020 → Apr 2025

Reason as filed by the promoterCovid

EA16072502078Dec 2020 → Apr 2027

Reason as filed by the promoter1) As the entire country including Mumbai Suburban were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. In view of the curbs and measures imposed by the Governments, I stopped work till such time as the said lockdowns, curbs and measures were relaxed by the respective Governments. 2) Inspite of best efforts, the said project was adversely affected due to unprecedented COVID-19 Pandemic which lasted for more than 2 years and are st

Litigation declared1

CaseCourtStatus
41/2017High CourtPre Admission

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000192349Rajjo SahuGRACE ESTATE DEVELOPMENT VENTURE27/02/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2021-2022)File: FORM 2A 21-22 Grace Grandeur.pdf30 Jun 2026
Form 2A (FY 2022-2023)File: FORM 2A 22-23 Grace Grandeur.pdf30 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2A 23-24Grace Grandeur.pdf30 Jun 2026
Building plan approvalFile: OC upto 13th Floor Grace Grandeur.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4 25-26 Grace Grandeur.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4 25-26 Grace Grandeur.pdf23 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q4 25-26 Grace Grandeur.pdf23 Jun 2026
Form 2A (FY 2025-2026)File: Grace Grandeur 2A -FY-25-26.pdf23 Jun 2026
Form 5 (FY 2024-2025)File: FORM 5 24-25 GRACE GRANDEUR.pdf23 Jun 2026
Form 5 (FY 2025-2026)File: FORM 5 24-25 GRACE GRANDEUR.pdf23 Jun 2026
Withdrawal Update Form 1File: FORM 1 Q2 25-26.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q3 25-26.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 Q2 25-26.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 Q3 25-26.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3 Q2 25-26.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3 Q3 25-26 FINAL.pdf20 Mar 2026
Form 1File: Architect Certificate July to Sept 2023.pdf14 Mar 2026
Form 2File: Engineers Certificate July to Sept 2023.pdf14 Mar 2026
Form 3File: FORM NO 3 GEDV JUL 23 TO SEPT 23.pdf14 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf14 Mar 2026
Form 1File: Architect Cerrtificate - GEDV.pdf12 Mar 2026
Form 2File: Engineer Certificate - GEDV.pdf12 Mar 2026
Form 3File: Grace Grandeur CA Certificate April to June 24.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and booked Invenory.pdf12 Mar 2026
Form 1File: Architect Cerrtificate - GEDV.pdf12 Mar 2026
Form 2File: Engineer Certificate - GEDV.pdf12 Mar 2026
Form 3File: Grace Grandeur CA Certificate April to June 24.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf12 Mar 2026
Form 1File: Architect Certificate April to June 2023 GEDV.pdf12 Mar 2026
Form 2File: Engineers Certificate April to June 2023 GEDV.pdf12 Mar 2026
Form 3File: FORM NO 3 GEDV APR 23 TO JUNE 23.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Flats GEDV.pdf12 Mar 2026
Form 1File: AR - Grace Grandure.pdf22 Aug 2025
Form 2File: ER - Grace Grandure.pdf22 Aug 2025
Form 3File: CA - Grace Grandure.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Grace Grandure - June 25.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Grace Grandeur - March 25.pdf10 Jul 2025
Form 1File: AR - Grace grandaur - march 25.pdf10 Jul 2025
Form 2File: ER - grace gradaur - march 25.pdf10 Jul 2025
Form 3File: CA MAR-25.pdf10 Jul 2025
Form 1File: 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf10 Jul 2025
Form 2File: 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf10 Jul 2025
Form 3File: 7 Certificates of CA (Form 3).pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclouser Dec 24.pdf10 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Oct to Dec 2023 GEDV.pdf15 Feb 2025
Certificates of CA (Form 3)File: FORM NO3 GEDV OCT 23 TO DEC 23 GRACE GRANDEUR.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Oct to Dec 2023 GEDV.pdf15 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Grace Grandeur AR - Sep 24.pdf13 Dec 2024
Certificates of CA (Form 3)File: GRACE GRANDEUR FORM 3.pdf13 Dec 2024
Certificates of CA (Form 3)File: Grace Grandeur CA Certificate April to June 24_compressed.pdf13 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Grace Grandeur ER - Sep 24.pdf13 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - GEDV.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: Grace Gradeur sep24.pdf12 Dec 2024
Declaration in FORM BFile: FORM B Affidavit Cum Declaration GEDV.pdf22 May 2024
CERSAI detailsFile: Cersai Report GEDV.pdf22 May 2024
Disclosure of sold/ booked inventoryFile: GEDV Disclosure of Sold Booked Inventory in Sq M.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest GEDV.pdf22 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM A GEDV.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate FY21-22 GEDV Grace Grandeur.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate FY22-23 GEDV Grace Grandeur.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate FY23-24 GEDV Grace Grandeur.pdf14 May 2024
Certificates of CA (Form 3)File: FORM NO3 GEDV APR 23 TO JUNE 23 GRACE GRANDEUR.pdf14 May 2024
Certificates of CA (Form 3)File: FORM NO3 GEDV JUL 23 TO SEPT 23 GRACE GRANDEUR.pdf14 May 2024
Certificates of CA (Form 3)File: FORM NO3 GEDV OCT 23 TO DEC 23 GRACE GRANDEUR.pdf14 May 2024
Certificates of CA (Form 3)File: FORM NO3 GEDV JAN 24 TO MAR 24 GRACE GRANDEUR.pdf14 May 2024
Certificates of CA (Form 3)File: FORM NO3 GEDV JAN 23 TO MAR 23 GRACE GRANDEUR.pdf14 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Jan 24 to March 24 GEDV Grace Grandeur.pdf3 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Jan 24 to March 24 GEDV Grace Grandeur.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Revised Disclosure of Sold and Unsold Inventory GEDV 31032024.pdf24 Apr 2024
Other - TechnicalFile: Grace Grandeur Quality Assurance Cert FY2023 TO 2024.pdf24 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Grace Grandeur GEDV FY2022-23 Form No5.pdf18 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate April to June 2023 GEDV.pdf25 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Jan to March 2023 GEDV.pdf25 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate July to Sept 2023 GEDV.pdf25 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Oct to Dec 2023 GEDV.pdf25 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate April to June 2023 GEDV.pdf25 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Jan to March 2023 GEDV.pdf25 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate July to Sept 2023 GEDV.pdf25 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Oct to Dec 2023 GEDV.pdf25 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Flats GEDV.pdf6 Mar 2024

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 76 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Grace Grandeur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmGrace GrandeurCompleted 137Lapsed / revoked 58Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 335 registered projects within 2 km.

Builder: GRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor)

GRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor) has 1 registration on MahaRERA, including Grace Grandeur. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Grace Grandeur is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Grace Grandeur?

The registered promoter entity is GRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Grace Grandeur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Grace Grandeur?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Grace Grandeur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Grace Grandeur?

The professionals named in the filing: Architect: Taranath Shetty; Architect: Shakil Ghanchi; Engineer: Shakil Ghanchi; Chartered Accountant: Rishi Sekhri; Chartered Accountant: Raviskumar Varma; Chartered Accountant: VIVEK KOURCHAND JINDAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grace Grandeur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grace Grandeur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grace Grandeur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.