Completed No litigation declared Residential / Group Housing project

GOODWILL BREEZA PHASE 1

By CHOICE REALTORS

RG-MH-67491 · RERA P52100020307 · Last updated on MahaRERA portal: 7 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2024Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

GOODWILL BREEZA PHASE 1 is a Residential / Group Housing project by CHOICE REALTORS in Madhav nagar, 411015, registered with MahaRERA as P52100020307 on 3 Apr 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameGOODWILL BREEZA PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Off Porwal Road
    • Madhav nagar
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020307
  • ReraGenie IDRG-MH-67491

Builder

  • NameCHOICE REALTORS
  • Entity typePartnership
  • PartnersMUKESH ANANTRAM GOYAL, Vipul Ashok Agarwal, Amit Ashok Agrawal, PRATIK VINOD AGARWAL, Ashish Satyaprakash Singhal, Laxminarayan Rajendraprasad Agarwal
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Apr 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA160000
B BuildingNA160000
C BuildingNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

A Building99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B Building99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
C Building99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 7 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes90%
Street LightingYes70%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes10%
Entrance Gate StructureYes100%

Parking filed171

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots171
Closed/Covered156
Open Space15
BuildingClosed/CoveredOpen SpaceTotal
A Building52557
B Building52557
C Building52557

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,880 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9668.16
Proposed, not sanctioned9,668 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchshowroom no 2, ground floor, signet house, alandi road , yerwada, pune 411006

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Imran Shaikh of Cubix Architects Associates
PartnerRole in project
CHOICE REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Aug 2022

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: breeza phase 1.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F5 GBP1 18Feb2023.pdf20 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: GBP1 Form 4 Signed.pdf10 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GBP1 OC_compressed.pdf6 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed F1 GBP1 24Jun2022_compressed.pdf5 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 GBP1 24Jun2022_compressed.pdf5 Aug 2022
Certificates of CA (Form 3)File: Signed F3 GBP1 25Jun2022_compressed.pdf5 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed F1 GBP1 2021to22 Q4.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Signed F2A GBP1 2021to22 Q4.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: DSI GBP1 14Mar2022 Signed.pdf9 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Goodwill Breeza Phase 1 Society Formation.pdf15 Jan 2022
Declaration about Commencement CertificateFile: GB Declaration about CC 27-12-2021.pdf27 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed F1 GBP1 2021to22 Q2.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Signed - F2A GBP1 2021to22 Q2.pdf9 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Choice Realtors (Phase 1).pdf15 Aug 2021
Certificates of CA (Form 3)File: CHOICE REALTORS FORM 3 PHASE 1.pdf15 Aug 2021
Layout approvalFile: Breeza Layout Approval 29062021.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 01.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 02.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 03A.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 04A.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 05B.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 06B.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 07C.pdf24 Jul 2021
Building plan approvalFile: Breeza SP 29062021 08C.pdf24 Jul 2021
Copy of Layout Approval (in case of layout)File: Breeza Layout Approval 29062021.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 01.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 02.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 03A.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 04A.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 05B.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 06B.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 07C.pdf24 Jul 2021
Building Plan Approval (IOD)File: Breeza SP 29062021 08C.pdf24 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Breeza CC 075021 29062021.pdf24 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate For Quality Assurance Goodwill Breeza Phase I.pdf19 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EBF6B2921-converted.pdf3 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: jpg2pdf-min.pdf10 Jun 2020
Copy of the legal title reportFile: CR Title search Challan.pdf29 Mar 2019
Copy of the legal title reportFile: CR Search Title Report.pdf29 Mar 2019
Certificates of CA (Form 3)File: 23032019_CR CA Certificate Form 3.pdf29 Mar 2019
Proforma of Allotment letterFile: Draft Agreement to Sale.pdf29 Mar 2019
Proforma of Allotment letterFile: Allotment Letter Choice Realtors- Goodwill Breeza.pdf29 Mar 2019
Building plan approvalFile: Sanction layout compressed-compressed.pdf14 Feb 2019
Layout approvalFile: Layout -1-1.pdf14 Feb 2019
PAN CardFile: Firm Pancard 14.pdf14 Feb 2019
Details of encumbrancesFile: Letter of Encumbrances.pdf14 Feb 2019
Copy of Layout Approval (in case of layout)File: Layout -1-1.pdf14 Feb 2019
Building Plan Approval (IOD)File: Sanction layout compressed-compressed.pdf14 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: cc no 3087.pdf14 Feb 2019
Declaration in FORM BFile: Form B Declaration.pdf14 Feb 2019

Keep GOODWILL BREEZA PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Madhav nagar

2 kmGOODWILL BREEZA PHASE 1Completed 33Lapsed / revoked 8Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: CHOICE REALTORS

CHOICE REALTORS has 3 registrations on MahaRERA, including GOODWILL BREEZA PHASE 1 and Goodwill Breeza Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if GOODWILL BREEZA PHASE 1 is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOODWILL BREEZA PHASE 1?

The registered promoter entity is CHOICE REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOODWILL BREEZA PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOODWILL BREEZA PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOODWILL BREEZA PHASE 1?

The professionals named in the filing: Architect: Ar Imran Shaikh of Cubix Architects Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOODWILL BREEZA PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOODWILL BREEZA PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOODWILL BREEZA PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.