ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GOLDEN WINDS Building B Phase 3

Completed No litigation declared Residential / Group Housing project

GOLDEN WINDS Building B Phase 3

By GOLDEN BRICKS DEVELOPERS

RG-MH-10758 · RERA P52100007347 · Last updated on MahaRERA portal: 20 Dec 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

GOLDEN WINDS Building B Phase 3 is a Residential / Group Housing project by GOLDEN BRICKS DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100007347 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019.

At a glance

Project

  • NameGOLDEN WINDS Building B Phase 3
  • TypeResidential / Group Housing
  • Location
    • PUNE
    • LOHEGAON
    • Pune (M Corp.)
    • Pune City
    • 411040
  • Pincode411040
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007347
  • ReraGenie IDRG-MH-10758

Builder

  • NameGOLDEN BRICKS DEVELOPERS
  • Entity typePartnership
  • PartnersMahendra Giridharilal Nahar, Shashikala Ashok Kankariya
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOLDEN WINDS Building B Phase 3NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

GOLDEN WINDS Building B Phase 3: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 20 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered14
Open Space2

Land and ownership25

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area302 sq m
Land owned byThe promoter, with other names on the file
Named landowners25
LandownerVillageDistrict
Baban Tukaram MurkuteLOHGAONPune
Sanjay Baban MurkuteLOHGAONPune
Eknath Balu KhuleLOHGAONPune
Sanjay MurkuteLOHGAONPune
Eknath KhuleLOHGAONPune
RAJENDRA BABAN MURKUTELOHGAONPune
Nitin Baban MurkuteLahagaonPune
Rajendra B MurkuteLOHGAONPune
Nitin B MurkuteLOHGAONPune
Omkar Balasaheb MurkuteLOHGAONPune
Omkar B MurkuteLOHGAONPune
Nalini Balasaheb MurkuteLOHGAONPune
Nalini B MurkuteLOHGAONPune
Rupali Vilas GarudLOHGAONPune
Dinesh Uttam TilekarMANJARI BkPune
Deepak Ambadas MaliBhosariPune
Pranal Raghunath NaleBhosariPune
Santosh Uttam TilekarMANJARI BkPune
Sachin Baban MurkuteLOHGAONPune
Sachin B MurkuteLOHGAONPune
Rupali V GarudLOHGAONPune
Pranal R NaleBhosariPune
Dinesh U TilekarMANJARI BkPune
Deepak A MaliBhosariPune
Santosh U TilekarMANJARI BkPune

Approvals and building plan

Permissible FSI1022.7
Proposed, not sanctioned818 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSENAPATI BAPAT ROAD PUNE 411016

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPandit Joshi And Associates
EngineerG A Bhilare Consultants Pvt Ltd
PartnerRole in project
GOLDEN BRICKS DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Sep 2019

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: B Building Registration Certificate.pdf20 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: B BLDG Form 5.pdf6 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B Completion Certificate.pdf25 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Bldg_-_E_-_RERA.pdf24 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Bldg_-_B_-_RERA.pdf24 Sep 2019
OtherFile: B - Fire NOC.pdf5 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA___Bldg_-_B.pdf15 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B2_july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B3_july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B1_july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B_1.pdf13 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B1_1.pdf13 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B2_1.pdf13 May 2019
Copy of the legal title reportFile: Additional Search Report 2019-04-04.pdf4 Apr 2019
Copy of the legal title reportFile: Additional Search Report 2019-04-04 2.pdf4 Apr 2019
Details of encumbrancesFile: Mortgage Deed Part 1.pdf23 Mar 2019
Details of encumbrancesFile: Mortgage Deed Part 2.pdf23 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Quality Certificate pg1.pdf9 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Quality Certificate pg2.pdf9 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Quality Certificate pg3.pdf9 Mar 2019
Certificates of CA (Form 5)File: CA B1.pdf12 Dec 2018
Certificates of CA (Form 5)File: CA B2.pdf12 Dec 2018
Copy of the legal title reportFile: Title 30-10-2018.pdf17 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: NEW CC 30-10-2018.pdf17 Nov 2018
Layout approvalFile: PROJECT LAYOUT -11.pdf21 Oct 2018
Building plan approvalFile: B BLDG.pdf21 Oct 2018
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT -11.pdf21 Oct 2018
Building Plan Approval (IOD)File: B BLDG.pdf21 Oct 2018
Layout approvalFile: plan 1-16.pdf10 Mar 2018
Building plan approvalFile: plan 3-16.pdf10 Mar 2018
Copy of Layout Approval (in case of layout)File: plan 1-16.pdf10 Mar 2018
Building Plan Approval (IOD)File: plan 3-16.pdf10 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: 298 Commencement Certificate.pdf10 Mar 2018
Layout approvalFile: Layout Plan as per current sanction plan.pdf28 Jul 2017
Layout approvalFile: Final Propose-Expected Layout.pdf28 Jul 2017
Details of encumbrancesFile: GOLDEN BRICKS PHASE 3.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan as per current sanction plan.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Final Propose-Expected Layout.pdf28 Jul 2017
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION PHASE 3.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building_-B.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM B PHASE 3.pdf28 Jul 2017
Certificates of CA (Form 3)File: BUILDING B.pdf28 Jul 2017
Proforma of Allotment letterFile: GW Application.pdf28 Jul 2017
Proforma of Allotment letterFile: GW Allotment_letter.pdf28 Jul 2017
Proforma of Allotment letterFile: RERA 1 (1) Flat Agreement.pdf28 Jul 2017
OtherFile: Partner's Authority Letter of GBD for RERA.pdf28 Jul 2017
OtherFile: Form A Part 1 Building B Ph 3.pdf28 Jul 2017
OtherFile: Form A Part 2 Building B Phase III.pdf28 Jul 2017
Details of encumbrancesFile: EKNATH KHULE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: DEEPAK MALI SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: RUPALI GARUD SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: DINESH TILEKAR SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: PRANAL NALE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: SANTOSH TILEKAR SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: BABAN MURKUTE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: NITIN MURKUTE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: RAJENDRA MURKUTE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: SACHIN MURKUTE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: SANJAY B MURKUTE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: NALINI MURKUTE SELF DECLARATION.pdf27 Jul 2017
Details of encumbrancesFile: OMKAR MURKUTE SELF DECLARATION.pdf27 Jul 2017
Layout approvalFile: Page 1 PMRDA Revised May 2016.pdf25 Jul 2017
Building plan approvalFile: Page 3 PMRDA Revised May 2016.pdf25 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf25 Jul 2017
Copy of the legal title reportFile: ADDITIONAL SERACH REPORT (30R).pdf25 Jul 2017
Copy of the legal title reportFile: ADDITIONAL SERACH REPORT.pdf25 Jul 2017
Copy of the legal title reportFile: TITLE REPORT.pdf25 Jul 2017
Copy of the legal title reportFile: TITLE REPORT1.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Page 1 PMRDA Revised May 2016.pdf25 Jul 2017
Building Plan Approval (IOD)File: Page 3 PMRDA Revised May 2016.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf25 Jul 2017
OtherFile: AIR FORCE DT 5-12-2014.pdf25 Jul 2017
OtherFile: NA ORDER DT 28-4-2015.pdf25 Jul 2017
OtherFile: Retirement Deed solanki.pdf25 Jul 2017
OtherFile: Sale Deed 395.pdf25 Jul 2017
OtherFile: Sale Deed 555.pdf25 Jul 2017
OtherFile: Road Sharing 1793.pdf25 Jul 2017
OtherFile: POA 2.pdf25 Jul 2017
OtherFile: Development Agreement 1 Part 1.pdf25 Jul 2017
OtherFile: Development Agreement 1 Part 2.pdf25 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GOLDEN WINDS Building C Phase 1Survey Number 298 2A Part Opposite D Y Patil Knowledge City Gate Lohegaon Pune 41104716CompletedJan 2017Late, Mar 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOLDEN WINDS Building B Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LOHEGAON13,700+ in Pune

2 kmGOLDEN WINDS Building B Completed 45Lapsed / revoked 12Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: GOLDEN BRICKS DEVELOPERS

GOLDEN BRICKS DEVELOPERS has 4 registrations on MahaRERA, including GOLDEN WINDS Building B Phase 3 and GOLDEN WINDS Building E Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GOLDEN WINDS Building B Phase 3 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN WINDS Building B Phase 3?

The registered promoter entity is GOLDEN BRICKS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN WINDS Building B Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN WINDS Building B Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN WINDS Building B Phase 3?

The professionals named in the filing: Architect: Pandit Joshi And Associates; Engineer: G A Bhilare Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN WINDS Building B Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN WINDS Building B Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN WINDS Building B Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.