Home / Browse projects / Pune, Maharashtra / GOLDEN VALLEY

Registered No litigation declared Others project

GOLDEN VALLEY

By BUILDWICK SPACES LLP

RG-MH-27677 · RERA P52100046533 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

GOLDEN VALLEY is a Others project by BUILDWICK SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100046533 on 10 Aug 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameGOLDEN VALLEY
  • TypeOthers
  • Location
    • MAHARASHTRA
    • PUNE
    • Mundhawa
    • Haveli
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046533
  • ReraGenie IDRG-MH-27677

Builder

  • NameBUILDWICK SPACES LLP
  • Entity typeOthers
  • Named personsANKIT D. PATEL, BIRENKUMAR K. PATEL, SACHIN D. PATEL, DEEPKUMAR J. PATEL

Key dates

this monthRegisteredAug 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Aug 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOLDEN VALLEYNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

GOLDEN VALLEY: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
ADARSH GURUPAD GAIKWADMundhawaPune
GANESH GURUPAD GAIKWADKeshavnagar-MundwaPune
GAURAV GANESH GAIKWADMundhawaPune
SNEHAL GANESH GAIKWADMundhawaPune

Approvals and building plan

Permissible FSI35106.98
Proposed, not sanctioned29,774 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANJARI, PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATIT ADMULWAR ARCHITECTS
EngineerG A BHILARE CONSULTANTS PVT LTD
Chartered AccountantAbhishek Taparia & Associates
Chartered AccountantGER & Associates
PartnerRole in project
BUILDWICK SPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for RERA001.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BWSLLP_compressed_removed.pdf20 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 BWSLLP.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclouser till Dec 2023001_compressed.pdf5 Feb 2024
Layout approvalFile: 1-3.pdf25 Jan 2024
Building plan approvalFile: 2-13.pdf25 Jan 2024
Building plan approvalFile: 3-13.pdf25 Jan 2024
Building plan approvalFile: 4-13.pdf25 Jan 2024
Building plan approvalFile: 5-13.pdf25 Jan 2024
Building plan approvalFile: 6-13.pdf25 Jan 2024
Building plan approvalFile: 7-13.pdf25 Jan 2024
Building plan approvalFile: 8-13.pdf25 Jan 2024
Building plan approvalFile: 9-13.pdf25 Jan 2024
Building plan approvalFile: 10-13.pdf25 Jan 2024
Building plan approvalFile: 11-13.pdf25 Jan 2024
Building plan approvalFile: 12-13.pdf25 Jan 2024
Building plan approvalFile: 13-13.pdf25 Jan 2024
Copy of Layout Approval (in case of layout)File: 1-3.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 7-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 8-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 9-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 10-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 11-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 12-13.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 13-13.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Dt.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form1.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary _Golden Valley001_compressed.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Final.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer certificate.pdf27 Apr 2023
Layout approvalFile: 001-01.pdf19 Apr 2023
Building plan approvalFile: 001-12.pdf19 Apr 2023
Building plan approvalFile: 002-12.pdf19 Apr 2023
Building plan approvalFile: 003-12.pdf19 Apr 2023
Building plan approvalFile: 004-12.pdf19 Apr 2023
Building plan approvalFile: 005-12.pdf19 Apr 2023
Building plan approvalFile: 006-12.pdf19 Apr 2023
Building plan approvalFile: 007-12.pdf19 Apr 2023
Building plan approvalFile: 008-12.pdf19 Apr 2023
Building plan approvalFile: 009-12.pdf19 Apr 2023
Building plan approvalFile: 010-12.pdf19 Apr 2023
Building plan approvalFile: 011-12.pdf19 Apr 2023
Building plan approvalFile: 012-12.pdf19 Apr 2023
Copy of Layout Approval (in case of layout)File: 001-01.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 001-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 002-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 003-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 004-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 005-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 006-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 007-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 008-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 009-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 010-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 011-12.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 012-12.pdf19 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC001.pdf19 Apr 2023
Details of encumbrancesFile: Encumbraces Certiicate001.pdf14 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intrest in other real estate _BirenSir.pdf13 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intrest in other real estate DeepSir.pdf13 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intrest in other real estate SachinSir.pdf13 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclpsure Intrest In other Estate Ankit Sir001.pdf13 Apr 2023
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf5 Apr 2023
Proforma of Allotment letterFile: Agreement - Buildwick Spaces LLP - Golden Valley - New Model Draft - 22 FINAL.pdf4 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviations In the proforma agreement001.pdf4 Aug 2022
Details of encumbrances concerned to LegalFile: Encumbrances for Legal.pdf26 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration for RERA Ac Dt 26-7-22001.pdf26 Jul 2022
Deviation Report with respect to Allotment letterFile: Deviation Report with respect allotment001.pdf26 Jul 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOLDEN VALLEY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmGOLDEN VALLEYCompleted 54Lapsed / revoked 12Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: BUILDWICK SPACES LLP

BUILDWICK SPACES LLP has 1 registration on MahaRERA, including GOLDEN VALLEY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GOLDEN VALLEY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN VALLEY?

The registered promoter entity is BUILDWICK SPACES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN VALLEY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN VALLEY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN VALLEY?

The professionals named in the filing: Architect: ATIT ADMULWAR ARCHITECTS; Engineer: G A BHILARE CONSULTANTS PVT LTD; Chartered Accountant: Abhishek Taparia & Associates; Chartered Accountant: GER & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN VALLEY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN VALLEY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN VALLEY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.