Registered No litigation declared Residential / Group Housing project

GOLDEN HEIGHTS

By Shree Amrut Sai Developer Pvt.Ltd

RG-MH-72669 · RERA P51500055184 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Aug 2030Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
61 of 86Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

GOLDEN HEIGHTS is a Residential / Group Housing project by Shree Amrut Sai Developer Pvt.Ltd in Aurangabad, Maharashtra, registered with MahaRERA as P51500055184 on 11 Mar 2024. Possession is promised by 31 Aug 2030. 25 of the 86 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameGOLDEN HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Paithan Road
    • Itkheda
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • RERA no.P51500055184
  • ReraGenie IDRG-MH-72669

Builder

  • NameShree Amrut Sai Developer Pvt.Ltd
  • Entity typeCompany
  • Managing DirectorCHIRAG ANIL LILA
  • DirectorSHARAD RAJKUMAR LILA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedAug 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Mar 2024
  • Promised completion31 Aug 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed71 files

Current status

29%25 of 86 units booked
9.4%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-2 WINGNA1313681280
A-1 WINGNA21606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

A-2 WING31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A-1 WING12%
ActivityProgress
Excavation90%
Basement (if any)40%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,420 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityTown Planning Authority, Municipal Corporation, Chhatrapati Sambhaji Nagar(Aurangabad)
Permissible FSI17280.0
Proposed, not sanctioned8,755 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHEREKAR PRISTINE, PLOT NO 4, CTS NO 20200, BHAGYANAGAR, AURANGABAD,431001
Estimated costRs 32.99 cr
Cost incurredRs 3.10 cr
Work done9.41%
BuildingWingEstimatedIncurred
A-1 WINGNARs 15.99 crRs 42.74 lakh
A-2 WINGNARs 14.00 crRs 2.57 cr
-NARs 3.00 crRs 10.36 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRAMOD VITHOBA NARALE
EngineerPRAKASH UTTAMRAO VIDHATE
Chartered AccountantM R Hundiwala & Co
Chartered AccountantNikhil N. Loya & Co.
PartnerRole in project
Shree Amrut Sai Developer Pvt.Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2030

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1_GH_Q4_25-26.pdf18 May 2026
Withdrawal Update Form 2File: Form 2 _GH_Q4_25-26.pdf18 May 2026
Withdrawal Update Form 3File: From 3_GH_Mar 26-Signed.pdf18 May 2026
Withdrawal Update Form 1File: Form-1_GH_Dec 25_Signed.pdf17 Feb 2026
Withdrawal Update Form 2File: Form-2_GH_Dec 25_Signed.pdf17 Feb 2026
Withdrawal Update Form 3File: From 3_GH_Dec 25-Signed.pdf17 Feb 2026
Withdrawal Update Form 1File: Form-1 Golden Height_Sept_Signed.pdf9 Dec 2025
Withdrawal Update Form 2File: Form-2_GH_Sept 25_Signed.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3_Golden heights_Sept 25.pdf9 Dec 2025
Form 5 (FY 2024-2025)File: GH_Form 5_24-25_Signed.pdf28 Jul 2025
Withdrawal Update Form 1File: Form-1-30-06-25_GH.pdf24 Jul 2025
Withdrawal Update Form 2File: FORM-2 ENGINEER CERTIFICATE GH Dt-30-06-25_GH.pdf24 Jul 2025
Withdrawal Update Form 3File: Form - 3_GH_Jun 25_Final.pdf24 Jul 2025
Form 1File: FORM-1 _GH_Mar 2025.pdf20 Jul 2025
Form 2File: FORM-2_GH_Mar 2025.pdf20 Jul 2025
Form 3File: form 3_GH_Mar 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SASDPL Sold-Booked Inventory_GH_Mar 25.pdf20 Jul 2025
Withdrawal Update Form 1File: Form-1-30-06-25_GH.pdf20 Jul 2025
Withdrawal Update Form 1File: Form-1-30-06-25_GH.pdf20 Jul 2025
Withdrawal Update Form 2File: FORM-2 ENGINEER CERTIFICATE GH Dt-30-06-25_GH.pdf20 Jul 2025
Withdrawal Update Form 2File: FORM-2 ENGINEER CERTIFICATE GH Dt-30-06-25_GH.pdf20 Jul 2025
Withdrawal Update Form 3File: Withdrawal Application Form3_jUN 25.pdf20 Jul 2025
Withdrawal Update Form 3File: Withdrawal Application Form3_jUN 25.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_GH_Mar 2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 _GH_Mar 2025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_GH_Mar 2025.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_GH_DEC 2024.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2_Dec 2024.pdf28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_GH_2023-24_Signed _Scanned.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_ 3_GH_Mar 24.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_ 3_GH_June 24.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_ 3_GH_Sept 24.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_ 3_GH_Dec 24.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_GH_JUNE.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1_GOLDEN HEIGHTS_SEPT.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_GH_JUNE 2024_V2.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _GH_Sept 2024_V2_opt.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECTS Certificate_GH.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER'S CERTIFICATE_GH.pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SASDPL FROM-2A - Golden Heights.pdf9 May 2024
Other - TechnicalFile: SASDPL FROM-2A.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_28feb24_compressed.pdf28 Feb 2024
Other - FinanceFile: Form 2_compressed.pdf28 Feb 2024
Declaration about Commencement CertificateFile: Declaration of commencement certificate V2.pdf17 Feb 2024
CERSAI detailsFile: CERSAI declaration.pdf17 Feb 2024
Building plan approvalFile: 5 Layout approval.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Layout approval.pdf15 Feb 2024
Details of encumbrances concerned to FinanceFile: 3 Financial Encumbrances.pdf15 Jan 2024
Details of encumbrances concerned to LegalFile: 3 Financial Encumbrances.pdf15 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 37 Format A.pdf14 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 8 Commencement Certificate_compressed_compressed-compressed.pdf9 Nov 2023
Details of encumbrances concerned to FinanceFile: 3 Financial Encumbrances.pdf28 Oct 2023
Details of encumbrances concerned to LegalFile: 3 Financial Encumbrances.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect's Certificate.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer's Certificate.pdf14 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Disclosure of interest.pdf14 Oct 2023
Proforma of Agreement for saleFile: Model_AFS_in_English.pdf6 Oct 2023
Proforma of Allotment letterFile: model Allotment_letter.pdf6 Oct 2023
Copy of the legal title reportFile: 2 Legal Title Report.pdf24 Sep 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf24 Sep 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf24 Sep 2023
Declaration in FORM BFile: Form B.pdf24 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation report wrt Allotment.pdf23 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report wrt Agreement to sale.pdf23 Sep 2023
Building plan approvalFile: Building Approval.pdf22 Sep 2023
Building plan approvalFile: Building Approval 2.pdf22 Sep 2023
Layout approvalFile: Layout approval.pdf22 Sep 2023
PAN CardFile: 1 PAN Card.pdf22 Sep 2023
Copy of Layout Approval (in case of layout)File: Layout approval.pdf22 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Approval.pdf22 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Approval 2.pdf22 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Amrut Sai PlazaRailway station MIDC Padampuara272CompletedApr 2015Late, Apr 2015

How this compares with Aurangabad

29%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep GOLDEN HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Itkheda1,400+ in Aurangabad

Builder: Shree Amrut Sai Developer Pvt.Ltd

Shree Amrut Sai Developer Pvt.Ltd has 2 registrations on MahaRERA, including AMRUT SAI PLAZA PH 2 and GOLDEN HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if GOLDEN HEIGHTS is delayed beyond 31 Aug 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN HEIGHTS?

The registered promoter entity is Shree Amrut Sai Developer Pvt.Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN HEIGHTS?

The professionals named in the filing: Architect: AR PRAMOD VITHOBA NARALE; Engineer: PRAKASH UTTAMRAO VIDHATE; Chartered Accountant: M R Hundiwala & Co; Chartered Accountant: Nikhil N. Loya & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.