Home / Browse projects / Aurangabad, Maharashtra / GOKULDHAM

Registered No litigation declared Residential / Group Housing project

GOKULDHAM

By GIRIRAJ DEVELOPERS

RG-MH-35987 · RERA P51500030191 · Last updated on MahaRERA portal: 28 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
45 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
21 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

GOKULDHAM is a Residential / Group Housing project by GIRIRAJ DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500030191 on 5 Aug 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 11 of the 32 units on this registration are recorded sold or booked, and 45 of 55 construction stages are filed complete.

At a glance

Project

  • NameGOKULDHAM
  • TypeResidential / Group Housing
  • Location
    • SATARA PARISAR
    • SATARA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500030191
  • ReraGenie IDRG-MH-35987

Builder

  • NameGIRIRAJ DEVELOPERS
  • Entity typePartnership
  • PartnersSuhas Malge, Suhas Malge
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2021First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings5 building records
  • Documents filed51 files

Current status

34%11 of 32 units booked

Figures as on 28 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO 1 TO 6NA22606
ROW HOUSE NO 7 TO 15NA22909
ROW HOUSE 16 TO 23NA22808
ROW HOUSE 24 TO 30NA22707
ROW HOUSE 31 AND 32NA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

ROW HOUSE NO 1 TO 682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 7 TO 1582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 16 TO 2382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 24 TO 3082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 31 AND 3282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,840 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2025
LandownerVillageDistrict
ASHA BALIRAM DHONGADEAurangabad (M Corp.)Aurangabad
ANIL BALIMRAM DHONGADEAurangabad (M Corp.)Aurangabad
ASHA BALIRAM DHONDAGEAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation, Aurangabad
Permissible FSI8011.44
Proposed, not sanctioned2,451 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSARANG CO OP HOUSING SOCIETY, GARKHEDA, AURANGABAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMIRKUTE ARCHITECTS AND INTERIOR DESIGNER
EngineerMIRKUTE ARCHITECTS AND INTERIOR DESIGNER
Chartered AccountantSHUBHDA JADHAV AND ASSOCIATES
PartnerRole in project
GIRIRAJ DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16092502607Dec 2024 → Dec 2026

Reason as filed by the promoterWe have sold 11 Row House Units till date and also given possession of the units... Sale Deed First Page Index II Attached For Ref. And also possession letters also attached for ref. So request you please grant the extension till 31/12/2026. This is due to technical issues we required extra... We have already executed the final individual conveyance deed in fevor of allottees and also given them the possession of the units... due to technical issue the project is delayed completion so we request please grant the extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 21-22.pdf28 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf28 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23.pdf28 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 23-24.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form-1 Dec 22.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form-1 March 23.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form-1 June 23.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form-1 Sep 23.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form-1 Dec 23.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form-1 March 24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form-1 June 24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form-1 Sep 24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form-1 Dec 24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 March 22.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 MAR 24.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 DEC 24.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 SEP 24.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 JUN 24.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 DEC 23.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 SEP 23.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 MAR 23.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 MAR 23.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 DEC 22.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 MAR 22.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 DEC 23.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form-2 Sep 23.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form-2 Dec 24.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form-2 Sep 24.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form-2 June 24.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form-2 March 24.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form-2 Dec 23.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form-2 June 23.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form-2 March 23.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form-2 Dec 22.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form-2 March 22.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A 21-22.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A 22-23.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A 22-23.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 23-24.pdf10 Mar 2025
Proforma of Allotment letterFile: Allotmenr and ATS.pdf31 Jul 2021
Layout approvalFile: img-827125524.pdf24 Jul 2021
Building plan approvalFile: img-827125541.pdf24 Jul 2021
PAN CardFile: Giriraj Developers pan.pdf24 Jul 2021
Copy of the legal title reportFile: Giriraj Developers sEARCH_compressed.pdf24 Jul 2021
Details of encumbrancesFile: no ENC.pdf24 Jul 2021
Copy of Layout Approval (in case of layout)File: img-827125524.pdf24 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: img-827125541.pdf24 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Gokuldham CC.pdf24 Jul 2021
Declaration about Commencement CertificateFile: FORMAT D.pdf24 Jul 2021
Declaration in FORM BFile: Form-B Developers_compressed.pdf24 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Giriraj fORM 3.pdf24 Jul 2021

How this compares with Aurangabad

34%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 24 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep GOKULDHAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA1,400+ in Aurangabad

2 kmGOKULDHAMCompleted 19Lapsed / revoked 12Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: GIRIRAJ DEVELOPERS

GIRIRAJ DEVELOPERS has 5 registrations on MahaRERA, including DHANASHRI VISHWA and GOKULDHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if GOKULDHAM is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKULDHAM?

The registered promoter entity is GIRIRAJ DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKULDHAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKULDHAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKULDHAM?

The professionals named in the filing: Architect: MIRKUTE ARCHITECTS AND INTERIOR DESIGNER; Engineer: MIRKUTE ARCHITECTS AND INTERIOR DESIGNER; Chartered Accountant: SHUBHDA JADHAV AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULDHAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULDHAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULDHAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.