Home / Browse projects / Raigarh, Maharashtra / Gokul Dham
Gokul Dham
By Riddhi Infra
RG-MH-24337 · RERA P52000008816 · Last updated on MahaRERA portal: 15 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 40 months past the filed date
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gokul Dham is a Residential / Group Housing project by Riddhi Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000008816 on 19 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 24 months from the original filing. 175 of the 218 units on this registration are recorded sold or booked, and 63 of 77 construction stages are filed complete.
At a glance
Project
- NameGokul Dham
- TypeResidential / Group Housing
- Location
- MAMDAPUR
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000008816
- ReraGenie IDRG-MH-24337
Builder
- NameRiddhi Infra
- Entity typePartnership
- PartnersNarsinh Lakhubhai Patel, Rahul Narsinbhai Patel, Sanjay Ambalal Patel, Ashok Ramanbhai Patel
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion30 Jun 2023
- Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2021)
- Buildings7 building records
- Documents filed54 files
Current status
Figures as on 15 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 6 | 6 | 31 | 0 | 31 |
| Wing B C | NA | 6 | 0 | 49 | 0 | 49 |
| Wing D | NA | 6 | 0 | 26 | 0 | 26 |
| Wing E | NA | 5 | 0 | 27 | 0 | 27 |
| Wing F | NA | 5 | 0 | 27 | 0 | 27 |
| Wing G | NA | 6 | 0 | 26 | 0 | 26 |
| Wing H | NA | 6 | 0 | 26 | 6 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 15 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
63 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 50%.
Wing A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing H50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A | 1 | 1 |
| Wing B C | 1 | 1 |
| Wing D | 1 | 1 |
| Wing E | 1 | 1 |
| Wing F | 1 | 1 |
| Wing G | 1 | 1 |
| Wing H | 1 | 1 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| GUL JAIRAMDAS PANJWANI | Navi Mumbai Panvel Rigardh (CT) | Raigarh |
| DINESHKUMAR MURLIDHAR PASORIA | Navi Mumbai Panvel Rigardh (CT) | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing B C | NA | Rs 3.08 cr | Rs 3.08 cr |
| Wing A | NA | Rs 2.12 cr | Rs 2.12 cr |
| Wing D | NA | Rs 1.71 cr | Rs 1.71 cr |
| Wing G | NA | Rs 1.71 cr | Rs 1.71 cr |
| Wing H | NA | Rs 1.63 cr | Rs 1.63 cr |
| Wing E | NA | Rs 1.40 cr | Rs 1.40 cr |
| Wing F | NA | Rs 1.40 cr | Rs 1.40 cr |
| - | NA | Rs 1.17 cr | Rs 1.17 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHARMESH BHALANI |
| Engineer | Kantilal Karsanbhai Patel |
| Chartered Accountant | P H P AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| Riddhi Infra | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Corona Pandemic , we were unable to complete the project , due no labor available and full lock down no availability of material so we request you to extend our project date upto 31 / 12/2022. No. of sold apartments is 106 and consent taken is 57.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 6f861bd5-77a4-4cc7-b717-642ead11bf10.pdf | 15 Nov 2025 |
| Form 2File: form 2 riddhi infra.pdf | 15 Nov 2025 |
| Form 3File: form3 riddhi infra.pdf | 15 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: descloser 1.pdf | 15 Nov 2025 |
| OthersFile: descloser 2.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 15 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 12 Sep 2025 |
| Form 5 (FY 2023-2024)File: Form 5.pdf | 10 Sep 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UnSold-1-7.pdf | 15 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD UnSold-8-15.pdf | 15 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: sold unsold details.pdf | 25 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certifiactes of CA (Form 5).pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf | 4 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineercertificate 2020.pdf | 4 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate_compressed.pdf | 4 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance.pdf | 4 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: extension B C.pdf | 4 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: extension D.pdf | 4 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form -5_ 19-20.pdf | 4 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5_20-21.pdf | 4 Aug 2021 |
| Declaration about Commencement CertificateFile: delecatration.pdf | 3 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineercertificate 2020.pdf | 3 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate_compressed.pdf | 3 Aug 2021 |
| Certificates of CA (Form 5)File: Certifiactes of CA (Form 5).pdf | 24 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: C (1).pdf | 11 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: C (2).pdf | 11 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: C (3).pdf | 11 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: C (4).pdf | 11 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: C (5).pdf | 11 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: C (6).pdf | 11 Oct 2018 |
| Certificates of CA (Form 5)File: Certificate of CA (Form).pdf | 9 Oct 2018 |
| PAN CardFile: COMPANY PAN CARD.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: title report.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: no encumbrances on letter head.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: New Doc 2017-07-26 (3).pdf | 27 Jul 2017 |
| Declaration in FORM BFile: FORM B.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE LOW RESOLUTION.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate (1).pdf | 27 Jul 2017 |
| Layout approvalFile: sanction_layout.pdf | 26 Jul 2017 |
| Building plan approvalFile: A_WING_SANCTION_PLAN_COPY.pdf | 26 Jul 2017 |
| Building plan approvalFile: B_C_SANCTION_PLAN_COPY.pdf | 26 Jul 2017 |
| Building plan approvalFile: D_G_SANCTION_PLAN_COPY.pdf | 26 Jul 2017 |
| Building plan approvalFile: E_F_SANCTION_PLAN.pdf | 26 Jul 2017 |
| Building plan approvalFile: H_WING_SANCTION_PLAN.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: sanction_layout.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: A_WING_SANCTION_PLAN_COPY.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: B_C_SANCTION_PLAN_COPY.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: D_G_SANCTION_PLAN_COPY.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: E_F_SANCTION_PLAN.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: H_WING_SANCTION_PLAN.pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: RIDDHI_INFRA.pdf | 26 Jul 2017 |
| Proforma of Allotment letterFile: rera agreement for sale.pdf | 26 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gokul Dham on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mamdapur5,900+ in Raigarh
Filed coordinates, straight-line distance. 181 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: Riddhi Infra
Riddhi Infra has 2 registrations on MahaRERA, including Gokul Dham and GAJARA PACIFIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Gokul Dham shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Gokul Dham is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gokul Dham?
The registered promoter entity is Riddhi Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gokul Dham?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gokul Dham?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gokul Dham?
The professionals named in the filing: Architect: DHARMESH BHALANI; Engineer: Kantilal Karsanbhai Patel; Chartered Accountant: P H P AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gokul Dham?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback