Red flags

  • Completion date moved by 19 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Oct 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

GOKUL DHAM is a Others project by DATTADIGAMBER ASSOCIATES in DIGHI, 411015, registered with MahaRERA as P52100015490 on 1 Mar 2018. The registration is recorded completed; possession was promised by 25 Oct 2023. The completion date has moved by 19 months from the original filing.

At a glance

Project

  • NameGOKUL DHAM
  • TypeOthers
  • Location
    • ALANDI ROAD
    • DIGHI
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015490
  • ReraGenie IDRG-MH-26647

Builder

  • NameDATTADIGAMBER ASSOCIATES
  • Entity typePartnership
  • PartnersAJIT VINAYAK DESAI, NAVNATH DATTATRAY PARANDE, NITIN DATTATRAY PARANDE, RAVINDRAKUMAR SAHERAO WALKE

Key dates

this monthRegisteredMar 2018First promiseMar 2022Revised toOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Mar 2018
  • Promised completion25 Oct 2023
  • Revised completionRevised to 25 Oct 2023 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership61

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,985 sq m
Land owned byThe promoter, with other names on the file
Named landowners61
LandownerVillageDistrict
VISHNU PISE-Pune
ASHOK LAMBHATE-Pune
BHAMABAI DAGADE-Pune
DILIP DAGADE-Pune
DATTATRAYDAGADE-Pune
ARUNA GODSE-Pune
USHA ZANDE-Pune
BALASAHIB SUTAR-Pune
KALPNA BALU-Pune
SANTOSH BALU-Pune
HANUMANT BALU-Pune
NAVNATH BALU-Pune
MADHUKAR BHISE-Pune
VIKAS BHISE-Pune
YUVRAJ BHISE-Pune
MALOJI CHINCHOLE-Pune
BALIKA CHINCHOLE-Pune
SUREKHA SAKORE-Pune
SUNANDA KOLATE-Pune
TARABAI BHISE-Pune
SOPAN TAPKIR-Pune
NANDA SATHE-Pune
CHANDRA SOPAN-Pune
SAKUNTALA TAPKIR-Pune
SATISH TAPKIR-Pune
NITIN TAPKIR-Pune
KUSUM TAPKIR-Pune
DILIP TAPKIR-Pune
RAJU TAPKIR-Pune
SAVITRI TAPKIR-Pune
NARAYAN TAPKIR-Pune
SASHIKALA TAPKIR-Pune
CHETAN TAPKIR-Pune
BHAGYASHREE TAPKIR-Pune
ASHISH TAPKIR-Pune
KAILASH TAPKIR-Pune
ASHWINI TAPKIR-Pune
SARADA BAHIRAT-Pune
RUPALI SATAB-Pune
DNYANESHWAR DAUNDKAR-Pune
ALKA DAUNDKAR-Pune
YOGESH DAUNDKAR-Pune
HEMANT DAUNDKAR-Pune
POONAM TAKLE-Pune
RAMLAL AGARWAL-Pune
NARAYAN WALKE-Pune
MANISHA WALKE-Pune
NILESH WALKE-Pune
SHUBHAM WALKE-Pune
VITTHAL KOKIL-Pune
KALINDA KOKIL-Pune
UMESH KOKIL-Pune
PRAVIN KOKIL-Pune
VANDANA KASAR-Pune
GANESH VADPELLI-Pune
DIVYA VADPELLI-Pune
GAJANAN CHOPADE-Pune
LATA CHOPADE-Pune
VARSHA AVACHAR-Pune
KRAPESH CHOPADE-Pune
YUVRAJ MADHUKAR BHISE-Pune

Approvals and building plan

Permissible FSI7415.18
Proposed, not sanctioned2,708 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSR NO 142/1,HINJEWADI IT PARK,MAIN ROAD PHASE 1 MIDC HINJEWADI , PUNE 411057

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNILRAMBHAUNAVALE
PartnerRole in project
DATTADIGAMBER ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012825Mar 2022 → Oct 2023

Reason as filed by the promoterAPPLIED FOR COMPLETION CERTIFICATE.

EXT52100011723Mar 2022 → Oct 2022

Reason as filed by the promoterDUE TO PANDEMIC ..WORK WAS DELAYED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Dec 2023

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complition certificate gokuldham.pdf11 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank.pdf30 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dattadigamber Asso- Form-5 -2021.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Dattadigamber Asso- Form-5 -2018.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Dattadigamber Asso- Form-5 -2019.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Dattadigamber Asso- Form-5 -2020.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Dattadigamber Asso- Form-5 -2021.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Dattadigamber Asso- Form-5 -2022.pdf14 Dec 2022
Declaration about Commencement CertificateFile: Declaration of commencement certificates.pdf5 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf5 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A COMPRESSED.pdf23 Nov 2022
Proforma of Allotment letterFile: AGREEMENT.pdf20 Feb 2019
Proforma of Allotment letterFile: AGREEMENT.pdf20 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf21 Aug 2018
Copy of the legal title reportFile: Title search (1).pdf23 Feb 2018
Certificates of CA (Form 3)File: Ca Certificate Dattadigamber (1).pdf23 Feb 2018
Building plan approvalFile: sanction lower parking plan.pdf15 Feb 2018
Building plan approvalFile: sanction ele and sec.pdf15 Feb 2018
Building plan approvalFile: sanction 1st and 3rd floor plan.pdf15 Feb 2018
Building plan approvalFile: sanction 2nd floor plan.pdf15 Feb 2018
Building plan approvalFile: sanction ground floor plan.pdf15 Feb 2018
PAN CardFile: PANCARD.pdf15 Feb 2018
Details of encumbrancesFile: DECLARATION OF ENCUMBRANCE.pdf15 Feb 2018
Building Plan Approval (IOD)File: sanction 1st and 3rd floor plan.pdf15 Feb 2018
Building Plan Approval (IOD)File: sanction 2nd floor plan.pdf15 Feb 2018
Building Plan Approval (IOD)File: sanction ground floor plan.pdf15 Feb 2018
Building Plan Approval (IOD)File: sanction lower parking plan.pdf15 Feb 2018
Building Plan Approval (IOD)File: sanction ele and sec.pdf15 Feb 2018
Declaration in FORM BFile: FORM B PROMOTER.pdf15 Feb 2018
Proforma of Allotment letterFile: maharera decleration for agreement and allotment.pdf15 Feb 2018
Layout approvalFile: sanction layout sheet.pdf14 Feb 2018
Copy of Layout Approval (in case of layout)File: sanction layout sheet.pdf14 Feb 2018

Keep GOKUL DHAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIGHI

Builder: DATTADIGAMBER ASSOCIATES

DATTADIGAMBER ASSOCIATES has 1 registration on MahaRERA, including GOKUL DHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if GOKUL DHAM is delayed beyond 25 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKUL DHAM?

The registered promoter entity is DATTADIGAMBER ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKUL DHAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKUL DHAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKUL DHAM?

The professionals named in the filing: Architect: SUNILRAMBHAUNAVALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKUL DHAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKUL DHAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKUL DHAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.