Red flags
- Completion date moved by 19 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOKUL DHAM is a Others project by DATTADIGAMBER ASSOCIATES in DIGHI, 411015, registered with MahaRERA as P52100015490 on 1 Mar 2018. The registration is recorded completed; possession was promised by 25 Oct 2023. The completion date has moved by 19 months from the original filing.
At a glance
Project
- NameGOKUL DHAM
- TypeOthers
- Location
- ALANDI ROAD
- DIGHI
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100015490
- ReraGenie IDRG-MH-26647
Builder
- NameDATTADIGAMBER ASSOCIATES
- Entity typePartnership
- PartnersAJIT VINAYAK DESAI, NAVNATH DATTATRAY PARANDE, NITIN DATTATRAY PARANDE, RAVINDRAKUMAR SAHERAO WALKE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Mar 2018
- Promised completion25 Oct 2023
- Revised completionRevised to 25 Oct 2023 (originally 30 Mar 2022)
- Buildings1 building record
- Documents filed32 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
BUILDING A: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership61
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VISHNU PISE | - | Pune |
| ASHOK LAMBHATE | - | Pune |
| BHAMABAI DAGADE | - | Pune |
| DILIP DAGADE | - | Pune |
| DATTATRAYDAGADE | - | Pune |
| ARUNA GODSE | - | Pune |
| USHA ZANDE | - | Pune |
| BALASAHIB SUTAR | - | Pune |
| KALPNA BALU | - | Pune |
| SANTOSH BALU | - | Pune |
| HANUMANT BALU | - | Pune |
| NAVNATH BALU | - | Pune |
| MADHUKAR BHISE | - | Pune |
| VIKAS BHISE | - | Pune |
| YUVRAJ BHISE | - | Pune |
| MALOJI CHINCHOLE | - | Pune |
| BALIKA CHINCHOLE | - | Pune |
| SUREKHA SAKORE | - | Pune |
| SUNANDA KOLATE | - | Pune |
| TARABAI BHISE | - | Pune |
| SOPAN TAPKIR | - | Pune |
| NANDA SATHE | - | Pune |
| CHANDRA SOPAN | - | Pune |
| SAKUNTALA TAPKIR | - | Pune |
| SATISH TAPKIR | - | Pune |
| NITIN TAPKIR | - | Pune |
| KUSUM TAPKIR | - | Pune |
| DILIP TAPKIR | - | Pune |
| RAJU TAPKIR | - | Pune |
| SAVITRI TAPKIR | - | Pune |
| NARAYAN TAPKIR | - | Pune |
| SASHIKALA TAPKIR | - | Pune |
| CHETAN TAPKIR | - | Pune |
| BHAGYASHREE TAPKIR | - | Pune |
| ASHISH TAPKIR | - | Pune |
| KAILASH TAPKIR | - | Pune |
| ASHWINI TAPKIR | - | Pune |
| SARADA BAHIRAT | - | Pune |
| RUPALI SATAB | - | Pune |
| DNYANESHWAR DAUNDKAR | - | Pune |
| ALKA DAUNDKAR | - | Pune |
| YOGESH DAUNDKAR | - | Pune |
| HEMANT DAUNDKAR | - | Pune |
| POONAM TAKLE | - | Pune |
| RAMLAL AGARWAL | - | Pune |
| NARAYAN WALKE | - | Pune |
| MANISHA WALKE | - | Pune |
| NILESH WALKE | - | Pune |
| SHUBHAM WALKE | - | Pune |
| VITTHAL KOKIL | - | Pune |
| KALINDA KOKIL | - | Pune |
| UMESH KOKIL | - | Pune |
| PRAVIN KOKIL | - | Pune |
| VANDANA KASAR | - | Pune |
| GANESH VADPELLI | - | Pune |
| DIVYA VADPELLI | - | Pune |
| GAJANAN CHOPADE | - | Pune |
| LATA CHOPADE | - | Pune |
| VARSHA AVACHAR | - | Pune |
| KRAPESH CHOPADE | - | Pune |
| YUVRAJ MADHUKAR BHISE | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUNILRAMBHAUNAVALE |
| Partner | Role in project |
|---|---|
| DATTADIGAMBER ASSOCIATES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAPPLIED FOR COMPLETION CERTIFICATE.
Reason as filed by the promoterDUE TO PANDEMIC ..WORK WAS DELAYED
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Feb 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Feb 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Dec 2023
Documents filed32
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complition certificate gokuldham.pdf | 11 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank.pdf | 30 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dattadigamber Asso- Form-5 -2021.pdf | 14 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Dattadigamber Asso- Form-5 -2018.pdf | 14 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Dattadigamber Asso- Form-5 -2019.pdf | 14 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Dattadigamber Asso- Form-5 -2020.pdf | 14 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Dattadigamber Asso- Form-5 -2021.pdf | 14 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Dattadigamber Asso- Form-5 -2022.pdf | 14 Dec 2022 |
| Declaration about Commencement CertificateFile: Declaration of commencement certificates.pdf | 5 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf | 5 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A COMPRESSED.pdf | 23 Nov 2022 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 20 Feb 2019 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 20 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 21 Aug 2018 |
| Copy of the legal title reportFile: Title search (1).pdf | 23 Feb 2018 |
| Certificates of CA (Form 3)File: Ca Certificate Dattadigamber (1).pdf | 23 Feb 2018 |
| Building plan approvalFile: sanction lower parking plan.pdf | 15 Feb 2018 |
| Building plan approvalFile: sanction ele and sec.pdf | 15 Feb 2018 |
| Building plan approvalFile: sanction 1st and 3rd floor plan.pdf | 15 Feb 2018 |
| Building plan approvalFile: sanction 2nd floor plan.pdf | 15 Feb 2018 |
| Building plan approvalFile: sanction ground floor plan.pdf | 15 Feb 2018 |
| PAN CardFile: PANCARD.pdf | 15 Feb 2018 |
| Details of encumbrancesFile: DECLARATION OF ENCUMBRANCE.pdf | 15 Feb 2018 |
| Building Plan Approval (IOD)File: sanction 1st and 3rd floor plan.pdf | 15 Feb 2018 |
| Building Plan Approval (IOD)File: sanction 2nd floor plan.pdf | 15 Feb 2018 |
| Building Plan Approval (IOD)File: sanction ground floor plan.pdf | 15 Feb 2018 |
| Building Plan Approval (IOD)File: sanction lower parking plan.pdf | 15 Feb 2018 |
| Building Plan Approval (IOD)File: sanction ele and sec.pdf | 15 Feb 2018 |
| Declaration in FORM BFile: FORM B PROMOTER.pdf | 15 Feb 2018 |
| Proforma of Allotment letterFile: maharera decleration for agreement and allotment.pdf | 15 Feb 2018 |
| Layout approvalFile: sanction layout sheet.pdf | 14 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: sanction layout sheet.pdf | 14 Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 32 filed documents as one ZIP, foldered, with a manifest
Keep GOKUL DHAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DIGHI
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: DATTADIGAMBER ASSOCIATES
DATTADIGAMBER ASSOCIATES has 1 registration on MahaRERA, including GOKUL DHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if GOKUL DHAM is delayed beyond 25 Oct 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOKUL DHAM?
The registered promoter entity is DATTADIGAMBER ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOKUL DHAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOKUL DHAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOKUL DHAM?
The professionals named in the filing: Architect: SUNILRAMBHAUNAVALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOKUL DHAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback