ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / GOKARNA RESIDENCY

Registered No litigation declared Residential / Group Housing project

GOKARNA RESIDENCY

By HARSHAL ANIL ACHARYA

RG-MH-96340 · RERA P99000046050 · Last updated on MahaRERA portal: 4 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Podiums (if any), 0%
14 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

GOKARNA RESIDENCY is a Residential / Group Housing project by HARSHAL ANIL ACHARYA in Palghar, Maharashtra, registered with MahaRERA as P99000046050 on 15 Jun 2022. Possession is promised by 31 Dec 2026. 7 of the 21 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameGOKARNA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • VILLAGE : MALONDE
    • MALONDE
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000046050
  • ReraGenie IDRG-MH-96340

Builder

  • NameHARSHAL ANIL ACHARYA
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

33%7 of 21 units booked

Figures as on 4 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOKARNA RESIDENCYNA7721021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GOKARNA RESIDENCY: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area249 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Declared on12 Jun 2025
LandownerVillageDistrict
PRAKASH PANDURANG MASHALKARVasai-Virar City (M Corp)Palghar
PRASAD PRAKASH MASHALKARVasai-Virar City (M Corp)Palghar
NANDKISHOR PANDHURANG MASHALKARVasai-Virar City (M Corp)Palghar
NAMRATA PRASAD MASHALKARVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI1035.47
Proposed, not sanctioned1,035 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUMANT CHHAYA, PRUANDREWADI NEAR STATION AND TALATHI, OFFICE, VIRAR 410303

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAMES A DIAS
EngineerMESHRAM AND THUKRAL
Chartered AccountantMISHRA AND MAYEKAR ASSOCIATES
Chartered AccountantDOLLY MILAN ASHER
PartnerRole in project
HARSHAL ANIL ACHARYA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 12 23 signed.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 3 24 signed.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 3 24 signed.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 09 23 Signed.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 6 24 signed.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 9 24 signed.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 09 23 Signed.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 06 23 signed.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 09 23 signed.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed 31 12 23.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 03 24 signed.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed 30 6 24.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed 30 9 24.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 signed 31 03 24.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 signed 30 06 24.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30 9 24 signed.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 signed 31 12 23.pdf4 Apr 2025
Other - LegalFile: cc email to rera.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Developer Disclosure Sold 31 03 23.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Disclosure Sold 30 06 23.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Developer Disclosure Sold 30 09 23.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Developer Disclosure Sold 31 12 23.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Developer Discloser Sold 31 03 24.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Developer Discloser Sold 31 03 24.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: A B Developers Disclosure Sold 30 06 24.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: AB Developer Disclosure Sold 30 09 24.pdf4 Apr 2025
Declaration about Commencement CertificateFile: A B Developer Declaration Format -D.pdf4 Apr 2025
Other - TechnicalFile: cc email to rera.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: disclosure sold and unsold.pdf28 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format a seperate bank account.pdf28 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation A B Developer allotment.pdf28 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report For Agreement AB developer.pdf28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf28 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate.pdf28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf28 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure AB Developers secured finance.pdf28 Mar 2025
Layout approvalFile: layout copy_11zon.pdf27 Mar 2025
Building plan approvalFile: layout copy_11zon.pdf27 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCRUMBANCE TO LEGAL.pdf27 Mar 2025
Copy of Layout Approval (in case of layout)File: layout copy_11zon.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_removed_merged NEW.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MERGED.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_removed_merged.pdf27 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: cc clear copy.pdf27 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: layout copy_11zon.pdf27 Mar 2025
Details of encumbrances concerned to LegalFile: ENCRUMBANCE TO LEGAL.pdf27 Mar 2025
Proforma of Agreement for saleFile: afs NEW LATEST.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_QE JUNE 23 OPT.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_QE JUNE 23.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 23.pdf27 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dated 17-04-23_opt.pdf13 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_MARCH 2023 SIGNED opt.pdf13 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT.pdf15 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QE SEP 22.pdf15 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERT-OPT.pdf15 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 _QE SEP 22-OPT.pdf15 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED-OPT.pdf15 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200238711941_For_Asset_Based_Search_02_06_2022_13_58_13_987.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf2 Jun 2022
Layout approvalFile: LAYOUT UPDATED.pdf27 May 2022
Building plan approvalFile: LAYOUT UPDATED.pdf27 May 2022
PAN CardFile: PAN.pdf27 May 2022
Copy of the legal title reportFile: SEARCH TITLE REPORT.pdf27 May 2022
Details of encumbrancesFile: GENERAL DECALRATION.pdf27 May 2022
Copy of Layout Approval (in case of layout)File: LAYOUT UPDATED.pdf27 May 2022
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT UPDATED.pdf27 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC OPT.pdf27 May 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf27 May 2022
Declaration in FORM BFile: FORM B DEVELOPERS.pdf27 May 2022
CERSAI detailsFile: GENERAL DECALRATION.pdf27 May 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf27 May 2022

How this compares with Palghar

33%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOKARNA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALONDE3,200+ in Palghar

2 kmGOKARNA RESIDENCYCompleted 27Lapsed / revoked 10Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: HARSHAL ANIL ACHARYA

HARSHAL ANIL ACHARYA has 1 registration on MahaRERA, including GOKARNA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if GOKARNA RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKARNA RESIDENCY?

The registered promoter entity is HARSHAL ANIL ACHARYA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKARNA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKARNA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKARNA RESIDENCY?

The professionals named in the filing: Architect: JAMES A DIAS; Engineer: MESHRAM AND THUKRAL; Chartered Accountant: MISHRA AND MAYEKAR ASSOCIATES; Chartered Accountant: DOLLY MILAN ASHER. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKARNA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKARNA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKARNA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.